HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #9021  
Old Posted Oct 29, 2015, 1:37 AM
queetz@home's Avatar
queetz@home queetz@home is offline
Go Rotem! Die Bombardier!
 
Join Date: Jul 2001
Location: Ortigas
Posts: 3,679
Quote:
Originally Posted by xd_1771 View Post
Actually, no.

I know we love taking sides and picking food fights on here but none of the above is even correct.
Says who? YOU???? Who the hell are you???

Quote:
The basis for the 145's truncation to Production Way was to be its conversion to a B-Line service (and while it wasn't branded as one, this has been pretty much achieved in practice). The truncation was not done for ridership inflation purposes - it was done so that the frequency of the entire 145 route could be increased, just as is done for other routes today as a result of very limited resources. The change in fact helped accomodate an additional 5500 annual service hours to the overall route, despite the shortening, not a reduction that would be expected from just shortening the route.
You have got to be naive to say the 145 route change wasn't for Skytrain ridership purposes. If its not, then why count those students transferring from local routes at Lougheed to ride that one short segment to Production?

Quote:
Does it — for people on the 555? Maybe a little more - and I'm a South of Fraser guy, I would sympathize with these people. But the fact is, the 145's shorter terminus at production way is the reason that it's running every, say, 3 minutes and not every 4 minutes at peak times. And that's critical for everyone who has used this route, today and over the past 13 years, witnessing and experiencing the line-ups at Production just to head up the hill to SFU. It means that riders who are taking the Millennium Line from points across the system (as in, longer than 1 stop) have room to get on board the 145 and are kept on transit rather than discouraged from using it. Tell me, why is this supposed to be a bad thing? Can we really say we're losing as a result of this decision?
If one measley minute is all you are worried about (not surprised), then a passenger would prefer to take lesser transfers boarding from Lougheed rather than going up and down one short Skytrain stop just to get to SFU. Lougheed is the perfect transfer point for the area since it is a natural hub both technically (i.e. Skytrain station, switches, bus loop, new highway connection), commercially (the mall, residences, etc) and regionally (look at a map) so I don't know why anyone wouldn't agree to that other than someone who thinks Translink is perfect in everything that they do even when its not.

Quote:
BTW as a final poke at the major holes in the above post, I would think that anyone wanting to travel from PoMo and North Coquitlam (97 B-Line and other local buses) would transfer at Como Lake to the #143 if they wanted to go to SFU on a school day.
What if you don't want to go to SFU on a school day? That means your screwed right? And if school days are the criteria for providing good service such as the 143 for the 97B-Line riders, what is the justification of a line all the way to UBC?

Quote:
Even the "SkyTrain to nowhere" nickname we're all familiar with is silly and senseless, having been given by a pessimistic writer who thought that the final 11 stations (after Sapperton and Braid) would never be opened, and who insisted that the Millennium Line's final price tag would be $4 billion (which was based on nothing in the actual article and made absolutely no sense - anyone wanting to keep track of the Millennium Line's debt costs/servicing progress can just look at the annually released statements from RTP 2000 which are available online by PDF!).
I would take that "pessimistic" writer over an overly biased one issue kid any day of the week. If you want to look so knowledgable, including subjective words like "pessimistic" which is clearly opinion and has no basis whatsoever other than he does not agree with you, is never a proper way to present a supposedly fact based comment.

Quote:
Now stop your political embargo and complaining. No one was trying to artificially inflate the M-Line's ridership and while it fell short it wasn't even a "flop" by any means. The initial expectations were to have 75,000 boarding passengers by 2006. The line reached 70,000 in 2007. That's behind, but it's not far away and doesn't indicate a major failure of any sort.
The fact that it failed to reach the 75,000 show that the line did "fail" to meet projections. When you don't reach an expectation, its a fail, hence a "flop". And missing 5,000 a day for over a year...that kinda adds up, hence that fail is kinda major. Then again, costs of failure doesn't matter to you as long as its Skytrain, right?

Now stop your Skytrain cheerleading with selective data! You are just being like Malcolm and are not helping your cause or your precious Translink! Besides, the only people that believes you are the ones that want Skytrain regardless of costs (though they want someone else to always pay for it) or the merits of other systems. Fortunately, we have a premier who entrusts future additional Translink funding sources to the people, and that ain't bad...

Last edited by queetz@home; Oct 29, 2015 at 1:54 AM.
     
     
  #9022  
Old Posted Oct 29, 2015, 6:27 PM
Phalonx Phalonx is offline
Registered User
 
Join Date: Apr 2013
Posts: 33
If there are any other registered engineers/EITs on this forum, SNC-Lavalin/SELI is offering a technical tour of the North Portal in November. Space seems to be going quickly though and you need to provide your own PPE. Link here
     
     
  #9023  
Old Posted Oct 29, 2015, 7:38 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,106
Quote:
Originally Posted by queetz@home View Post
The fact that it failed to reach the 75,000 show that the line did "fail" to meet projections. When you don't reach an expectation, its a fail, hence a "flop". And missing 5,000 a day for over a year...that kinda adds up, hence that fail is kinda major. Then again, costs of failure doesn't matter to you as long as its Skytrain, right?
The 75,000 projection assumed the Evergreen Line is built by 2006, and of course that didn't happen. If you say Millennium Line fail the meet projection, then you must be saying that Evergreen Line will be such a failure that it can't even attract 5000 riders?
     
     
  #9024  
Old Posted Oct 29, 2015, 9:32 PM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,745
Quote:
Originally Posted by nname View Post
The 75,000 projection assumed the Evergreen Line is built by 2006, and of course that didn't happen. If you say Millennium Line fail the meet projection, then you must be saying that Evergreen Line will be such a failure that it can't even attract 5000 riders?
So the Millennium Line in fact *exceeded* its ridership projections in a way

I have some blogging to do...
     
     
  #9025  
Old Posted Oct 30, 2015, 12:16 AM
bluefox's Avatar
bluefox bluefox is offline
Registered User
 
Join Date: Aug 2013
Posts: 436
Quote:
Originally Posted by nname View Post
The 75,000 projection assumed the Evergreen Line is built by 2006, and of course that didn't happen. If you say Millennium Line fail the meet projection, then you must be saying that Evergreen Line will be such a failure that it can't even attract 5000 riders?
Couldn't agree more. Every single time a line has been extended or built, it's been successful. Canada Line is the best and most recent example. I don't think ridership will be a concern and I question anyone who seriously thinks so. The northeast part of the region has been waiting for SkyTrain for eons.
     
     
  #9026  
Old Posted Oct 30, 2015, 1:21 AM
Vantage's Avatar
Vantage Vantage is offline
Registered User
 
Join Date: Jan 2014
Location: Port Coquitlam, BC
Posts: 516
Quote:
Originally Posted by bluefox View Post
The northeast part of the region has been waiting for SkyTrain for eons.
Yes we have! I used to live right near Royal Oak but moved to near Coquitlam Centre in 1999. When we moved they were saying that the Skytrain would be built into Coquitlam by 2003.
I'm so happy that it is finally being built now, too bad it was a bit late.
     
     
  #9027  
Old Posted Oct 30, 2015, 3:39 AM
AMTDGT AMTDGT is offline
Registered User
 
Join Date: Jul 2009
Posts: 133
Quote:
Originally Posted by Vantage View Post
Yes we have! I used to live right near Royal Oak but moved to near Coquitlam Centre in 1999. When we moved they were saying that the Skytrain would be built into Coquitlam by 2003.
I'm so happy that it is finally being built now, too bad it was a bit late.
Our experience is when the C line went in, we went from 2 cars down to one that is rarely used today. I suspect it will be the same with the E extension. I know some folks don't mind busses but many of us don't. It takes a train to really get most folks out of their cars on to transit IMO.
     
     
  #9028  
Old Posted Oct 30, 2015, 4:34 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,733
Quote:
Originally Posted by AMTDGT View Post
Our experience is when the C line went in, we went from 2 cars down to one that is rarely used today. I suspect it will be the same with the E extension. I know some folks don't mind busses but many of us don't. It takes a train to really get most folks out of their cars on to transit IMO.
It helps to have car-sharing options nearby as well. Modo has a couple of cars near Coquitlam Centre now, it looks like they're being pretty proactive in spreading out their fleet.
     
     
  #9029  
Old Posted Nov 2, 2015, 3:54 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
New location Map: Oct 29th location map

maintenance location map

Looks like only about 50m to next scheduled stop, dump trucks going today with any luck they could be there this week!
     
     
  #9030  
Old Posted Nov 2, 2015, 4:39 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,734
Does the rest of the line apart from the tunnel have rails down?
     
     
  #9031  
Old Posted Nov 2, 2015, 6:04 PM
recurrence recurrence is offline
Registered User
 
Join Date: Feb 2011
Posts: 17
Quote:
Originally Posted by AMTDGT View Post
Our experience is when the C line went in, we went from 2 cars down to one that is rarely used today. I suspect it will be the same with the E extension. I know some folks don't mind busses but many of us don't. It takes a train to really get most folks out of their cars on to transit IMO.
Completely agree, I avoid bus lines that are not grade separated like the plague but love taking truly express systems like Skytrain. I know that this is opinion is not alone as many friends make their commuter decisions based on metro stops, ignoring buses and bus schedule altogether no matter how frequent.
     
     
  #9032  
Old Posted Nov 2, 2015, 10:19 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by WarrenC12 View Post
Does the rest of the line apart from the tunnel have rails down?
yup

and test trains running between Lougheed and Burquitlam.

Just had a thought ... Would the new MkIII trains spend some time doing test runs between Lougheed and Burquitlam - since the tracks and stations are there, but aren't in revenue service yet?

Last edited by jsbertram; Nov 2, 2015 at 10:36 PM.
     
     
  #9033  
Old Posted Nov 2, 2015, 11:33 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,734
Quote:
Originally Posted by jsbertram View Post
yup

and test trains running between Lougheed and Burquitlam.

Just had a thought ... Would the new MkIII trains spend some time doing test runs between Lougheed and Burquitlam - since the tracks and stations are there, but aren't in revenue service yet?
That would make the most sense, but I don't think they could go back and forth between two stations (during revenue hours) without possible disruption at the Lougheed switch.
     
     
  #9034  
Old Posted Nov 3, 2015, 2:05 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by WarrenC12 View Post
That would make the most sense, but I don't think they could go back and forth between two stations (during revenue hours) without possible disruption at the Lougheed switch.
They could still shuttle between Burquitlam and Lougheed north platform using just one track. Boring, but could still do most of their testing.

or use the Burquitlam switches to run from either Burquitlam platform to Lougheed north platform. This allows testing of both sides of doors at Burquitlam.
     
     
  #9035  
Old Posted Nov 3, 2015, 8:54 PM
finalcoolman finalcoolman is offline
Registered User
 
Join Date: Nov 2004
Posts: 262
Hey, so the TBM has arrived at the Robinson maintenance stop.
     
     
  #9036  
Old Posted Nov 4, 2015, 3:59 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Quote:
Originally Posted by finalcoolman View Post
Hey, so the TBM has arrived at the Robinson maintenance stop.
New Location map marks TBM at maintenance stop as of Nov 1st. Posted on Nov 2nd.

No dump trucks yesterday or today at portal..

So how long will this maintenance last is the question.....
     
     
  #9037  
Old Posted Nov 4, 2015, 9:49 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,106
If everything goes well, 2 weeks, and we may see the breakthrough before the end of this year.

If not, who knows...
     
     
  #9038  
Old Posted Nov 4, 2015, 11:13 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by nname View Post
If everything goes well, 2 weeks, and we may see the breakthrough before the end of this year.

If not, who knows...
Santa ALWAYS knows.

but he still likes getting your letters.
     
     
  #9039  
Old Posted Nov 5, 2015, 1:26 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,121
Quote:
Originally Posted by Jimbo604 View Post
So how long will this maintenance last is the question.....

Five weeks, two days and six hours.
     
     
  #9040  
Old Posted Nov 6, 2015, 1:36 AM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
There's a pair of bright eyes looking at people from Lougheed Town Centre Station's new platform... O.O
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:00 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.