Quote:
Originally Posted by Ridgerunner
For those of you who are still watching the TBM, I have noticed a routine by translink.
|
As I said the last time, THIS PROJECT IS NOT BEING MANAGED BY TRANSLINK!!!!. It is fully managed by BC MoT. TransLink paid for the cost and will operate the line in the future, and that's it.
I just get sick and tired of people blaming everything that possibly goes wrong in this world on them...
And how to you know the TBM not moving huh? Do you actually
see that it stopped somewhere? At the current location, the soil must travel 1.5km to reach the portal. Can't they just stop the flow somewhere in the middle of the tunnel and dump them out in batches, rather than having the need of truck lining up all days, 7 days a week?