Old Posted Sep 7, 2015, 4:55 PM
srperrycgy's Avatar
srperrycgy srperrycgy is online now
I'm the bear on the right
 
Join Date: Jun 2004
Location: Calgary (Killarney)
Posts: 1,670
Klazu: I always thought the narrowness problem this section after the Second Narrows was that it was crossing a First Nations reserve and widening the highway was not easily possible. Its a terrible section of the highway that is very congested.

Has the interchange work at Mountain Hwy. started yet?
__________________
Stevinder.
* * * * * *
     
     
  #4362  
Old Posted Sep 11, 2015, 9:51 AM
ghYHZ ghYHZ is offline
Registered User
 
Join Date: Aug 2007
Location: Antigonish NS
Posts: 496
Antigonish Bypass – 2015 Update

It’s been 3 years since Phase I of the TCH104 Antigonish NS Bypass opened in 2012 and it will be another year until Phase II is ready in Fall 2016.....extending it an additional 7.5 km to Taylors Road.

This is the current start/end of Phase I just east of Exit 33 at Beech Hill Road. This short 0.4km section connecting down the hill with the original alignment, including the overhead will be removed when the bypass in complete....then returned to a green field.





New alignment (below) between Phase 1 and II (overhead sign above is to the right)



This section of TCH104 cutting across the photo (below) will be removed, becoming Truck 4 and relocated to the overpass structure in the distance.









Below is the new structure at Exit 34 in Lower South River. It will be the jct with Route 316.




Last edited by ghYHZ; Sep 11, 2015 at 8:33 PM.
     
     
  #4363  
Old Posted Sep 11, 2015, 10:21 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by ghYHZ View Post
It’s been 3 years since Phase I of the TCH104 Antigonish NS Bypass opened in 2012 and it will be another year until Phase II is ready in Fall 2016.....extending it an additional 7.5 km to Taylors Road.

This is the current start/end of Phase I just east of Exit 33 at Beech Hill Road. This short 0.4km section connecting down the hill with the original alignment, including the overhead will be removed when the bypass in complete....then returned to a green field.
Any idea when the rest of 104 will be twinned?

Last edited by JHikka; Sep 11, 2015 at 1:37 PM. Reason: Quoting many large images; removing redundancy
     
     
  #4364  
Old Posted Sep 11, 2015, 7:34 PM
Franco401 Franco401 is offline
Registered User
 
Join Date: Jan 2014
Location: Fredericton
Posts: 1,238
Quote:
Originally Posted by swimmer_spe View Post
Any idea when the rest of 104 will be twinned?
Long way off. The proposal back in June to twin 8 sections of highway in the province including the 104 all the way to Sydney (including a new section from St. Peters to Sydney) is under discussion but only seems like the section to Port Hawkesbury is a shoe-in.
     
     
  #4365  
Old Posted Sep 11, 2015, 9:45 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,832
another 9km of the twinning Highway 69 opened for traffic south of Sudbury today.

http://www.northernlife.ca/news/localNews/2015/09/11-hwy-69-four-laning-sudbury.aspx

     
     
  #4366  
Old Posted Sep 12, 2015, 12:09 AM
sonysnob sonysnob is offline
Registered User
 
Join Date: Aug 2011
Posts: 1,800
Some new pictures of Autoroute 20 east of Wolf River, QC. These photos were taken on a road trip that I took back in May. The two-lane extension of Autoroute 20 from east of Cacouna to Trois-Pistoles is scheduled to open this fall, so these photos are definitely a bit out of date:
















Full resolution, and more photos are available here:
http://www.asphaltplanet.ca/PQ/A/20/Page9.htm
     
     
  #4367  
Old Posted Sep 12, 2015, 2:33 AM
FrAnKs's Avatar
FrAnKs FrAnKs is offline
Registered User
 
Join Date: Jul 2005
Location: Ville de Québec / Quebec city
Posts: 5,930
Nice pictures !

Wolf River ?...how dare you ?

__________________
PROVINCE OF QUEBEC ==> 9 050 000
MONTREAL METRO ==> 4 600 000
QUEBEC CITY METRO ==> 900 000
     
     
  #4368  
Old Posted Sep 12, 2015, 2:37 AM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
Touching grass everyday.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 51,141
Wolf River, QC? Ha. Rivière-du-Loup. Stomping grounds of my former classmate, Mario Dumont (ADQ). Nice part of the country.
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell). Sweet Loretta fart thought she was a cleaner, but she was a frying pan. (John Lennon)
     
     
  #4369  
Old Posted Sep 12, 2015, 2:41 AM
Dwils01's Avatar
Dwils01 Dwils01 is offline
Urban Fanactic
 
Join Date: Mar 2010
Location: Coquitlam
Posts: 3,283
Quote:
Originally Posted by Innsertnamehere View Post
another 9km of the twinning Highway 69 opened for traffic south of Sudbury today.

http://www.northernlife.ca/news/localNews/2015/09/11-hwy-69-four-laning-sudbury.aspx

Great. Will be going that way in a month. Hope to get some pictures of the progress.
Also got a dashcam so maybe I can get a video of that section of highway as well.
     
     
  #4370  
Old Posted Sep 19, 2015, 4:26 AM
malabrat malabrat is offline
Registered User
 
Join Date: Oct 2010
Posts: 23
Fixed link for Sunshine Coast

BC Transportation Ministry is looking at the feasibility of building a fixed link between the Lower Mainland of BC to the sunshine coast (which currently requires two ferries if going to Powell River from Vancouver)

https://news.gov.bc.ca/releases/2015TRAN0123-001542
     
     
  #4371  
Old Posted Sep 19, 2015, 5:49 AM
Tone's Avatar
Tone Tone is offline
Riki beach
 
Join Date: Oct 2006
Location: Rimouski, Qc
Posts: 3,437
A20 tronçon L'Isle-Verte/Notre-Dame-Des-Neiges

Here's some pictures taken this week from the third and final pavement contract. We've just finished the contract's sixth week of progress and only one more to go. The weather is great as we've lost only three rainy days and next week is also looking good! The opening ought to be on schedule in November.












     
     
  #4372  
Old Posted Sep 19, 2015, 2:28 PM
FrAnKs's Avatar
FrAnKs FrAnKs is offline
Registered User
 
Join Date: Jul 2005
Location: Ville de Québec / Quebec city
Posts: 5,930
Merci pour les photos !

Désolé, je t'ai déjà peut-être posé la question, mais le prochain tronçon ira jusqu'à quelle route ?

Edit : Route de la station peut-être ?
__________________
PROVINCE OF QUEBEC ==> 9 050 000
MONTREAL METRO ==> 4 600 000
QUEBEC CITY METRO ==> 900 000
     
     
  #4373  
Old Posted Sep 19, 2015, 3:09 PM
sonysnob sonysnob is offline
Registered User
 
Join Date: Aug 2011
Posts: 1,800
Route Drapeau.
     
     
  #4374  
Old Posted Sep 19, 2015, 3:14 PM
FrAnKs's Avatar
FrAnKs FrAnKs is offline
Registered User
 
Join Date: Jul 2005
Location: Ville de Québec / Quebec city
Posts: 5,930
Thanks mon ami
__________________
PROVINCE OF QUEBEC ==> 9 050 000
MONTREAL METRO ==> 4 600 000
QUEBEC CITY METRO ==> 900 000
     
     
  #4375  
Old Posted Sep 19, 2015, 8:43 PM
Tone's Avatar
Tone Tone is offline
Riki beach
 
Join Date: Oct 2006
Location: Rimouski, Qc
Posts: 3,437
Quote:
Originally Posted by FrAnKs View Post
Merci pour les photos !

Désolé, je t'ai déjà peut-être posé la question, mais le prochain tronçon ira jusqu'à quelle route ?

Edit : Route de la station peut-être ?
La Route Drapeau renommée Route de Notre-Dame-Des-Neiges pour l'occasion.

Le projet initial se terminait effectivement à la Route de la Station mais une décision fut prise d'ajouter une extention de deux kilomètres et demie au tronçon jusqu'à la Route Drapeau (pour plusieurs raisons non négligeables).
     
     
  #4376  
Old Posted Sep 22, 2015, 6:28 PM
Taeolas Taeolas is offline
Registered User
 
Join Date: Oct 2009
Location: Fredericton
Posts: 5,033
Fredericton's new Roundabout is now open.

This is a roundabout on Route 8, which is the old TCH routing through the city. (The new TCH takes a different route around now, but this is still the main highway to lead to the north eastern NB cities). The roundabout links/crosses Route 8 with Smythe street (a major North/South artery through the city) and Bishop Drive, which leads to the biggest mall in the city.
     
     
  #4377  
Old Posted Sep 22, 2015, 7:03 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 40,996


And mayhem has erupted with the city's first double lane roundabout.

Here's dashcam footage of a car going through the roundabout the wrong way on day one.

Video Link
__________________
Go 'Cats Go
     
     
  #4378  
Old Posted Sep 25, 2015, 8:06 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
One of these days, likely 10-50 years from now, Highway 417 will extend from where it is now near Arnprior, west.
I would think that it would go as far as Sault St Marie.

In Sudbury, with the plans to extend Maley Drive
http://www.greatersudbury.ca/living/roads/maley-drive-extension1/
It makes me think about were would make sense for highway 417 to go.

https://www.google.com/maps/d/edit?mid=zJh1JiVkvThc.kZm1mNBvmkos&usp=sharing

That is my thoughts.

Most of it is there. There is enough space to build it to proper freeway standards.

If they put in the exits at the major cross streets, this would give 16 exits.

Thoughts?
     
     
  #4379  
Old Posted Sep 25, 2015, 8:36 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
Quote:
Originally Posted by swimmer_spe View Post
One of these days, likely 10-50 years from now, Highway 417 will extend from where it is now near Arnprior, west.
I would think that it would go as far as Sault St Marie.

In Sudbury, with the plans to extend Maley Drive
http://www.greatersudbury.ca/living/roads/maley-drive-extension1/
It makes me think about were would make sense for highway 417 to go.

https://www.google.com/maps/d/edit?mid=zJh1JiVkvThc.kZm1mNBvmkos&usp=sharing

That is my thoughts.

Most of it is there. There is enough space to build it to proper freeway standards.

If they put in the exits at the major cross streets, this would give 16 exits.

Thoughts?
I believe the plan is to twin the Southeast and Southwest Bypasses, and build a new alignment to reach the Maley Drive extension and north of the existing corridor to Wahnapitae. There would be no new interchanges along the bypass until the current end of the bypass near Coniston, but grade separations would be built at Fielding Road and Southview Drive. I see no reason why they can't start building it soon...

That is preferable in my opinion, since a northern bypass does not grab any traffic from 69/400, forcing them onto a 2-lane corridor to reach 17.
     
     
  #4380  
Old Posted Sep 25, 2015, 10:09 PM
SignalHillHiker's Avatar
SignalHillHiker SignalHillHiker is offline
I ♣ Baby Seals
 
Join Date: Jul 2012
Location: Sin Jaaawnz, Newf'nland
Posts: 36,269
Lots of regional highway shots.

Video Link


Is it just me or isn't the videographer the bad driver?
__________________
Note to self: "The plural of anecdote is not evidence."
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 8:13 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.