HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


Reply

 
Thread Tools Display Modes
     
     
  #3121  
Old Posted Sep 17, 2015, 8:20 PM
chris08876's Avatar
chris08876 chris08876 is offline
 
Join Date: Jul 2013
Posts: 49,410
Faena House at night:


Credit: NM
Reply With Quote
     
     
  #3122  
Old Posted Sep 17, 2015, 11:20 PM
chris08876's Avatar
chris08876 chris08876 is offline
 
Join Date: Jul 2013
Posts: 49,410
Project: 350 Ocean Drive



Quote:
Designed by EoA Architects, and being built by Amicon Construction, the contemporary structure with sort of a sailing ship-like wooden facade will contrast with the art deco hotel next door. Enclosed will be 17 new guest rooms, two rooftop lounge areas, and a 'spa pool,' which is probably something in between a hot tub and a pool. Construction is beginning this month, with completion scheduled for next fall. Oh, and just because history and place names are interesting, according to a rep: "Originally built in 1940, the Art Deco boutique hotel was named after the former British Prime Minister Arthur James Balfour." So, there you go.
=====================
http://miami.curbed.com/archives/2015/09/16/south-beach-ocean-drive-lord-balfour-hotel.php
http://lordbalfour.room-matehotels.com/
Reply With Quote
     
     
  #3123  
Old Posted Sep 18, 2015, 4:06 PM
dave8721 dave8721 is offline
 
Join Date: Jul 2005
Posts: 4,197
Quote:
Originally Posted by Private Dick View Post
True... and from what I've heard over the years, there has been division among UM ranks on this issue. While they've pushed for a pedestrian bridge for decades now (which isn't the ideal solution, but likely the most realistic since we're dealing with a 6 lane high speed boulevard + turning lanes In Miami), there has been a faction of university officials that haven't really supported "bringing the outside in to campus"... but rather keeping a very clear separation... that having more of a presence east of the metrorail, somehow invites intrusion to campus. In many ways, I see it the complete opposite way.
UM has actually been trying to build out toward the metrorail station but the City of Coral Gables has been resisting, insisting on a "buffer" around the campus, even on the US-1 side which is ridiculous.
Reply With Quote
     
     
  #3124  
Old Posted Sep 19, 2015, 12:13 PM
bobdreamz's Avatar
bobdreamz bobdreamz is offline
 
Join Date: Mar 2002
Posts: 8,270
Paraiso Bay Towers 1 & 2 | 548 ft. // Midtown #5 // Biscayne Beach | 550 ft. | U/C


https://farm6.staticflickr.com/5747/20919117606_106f22d498_b.jpg

^ Looking east from N.W. 36th. street towards the Design district / Midtown / Edgewater with all 3 projects U/C.

The view @ night :

https://www.flickr.com/photos/searchofbeauty/20532890838/in/photostream/
Reply With Quote
     
     
  #3125  
Old Posted Sep 19, 2015, 12:37 PM
chris08876's Avatar
chris08876 chris08876 is offline
 
Join Date: Jul 2013
Posts: 49,410
Couple of developments could be seen in the beginning.

• Video Link

Published on Sep 19, 2015
Reply With Quote
     
     
  #3126  
Old Posted Sep 19, 2015, 1:32 PM
bobdreamz's Avatar
bobdreamz bobdreamz is offline
 
Join Date: Mar 2002
Posts: 8,270
^ Cool video although I don't cry for people who live on Brickell Key (must be nice!) & complain about the traffic in Brickell.
I was amazed at how many people actually walk over that bridge though! A lot of pedestrians!
The biking segment through Coral Gables was nice.
Reply With Quote
     
     
  #3127  
Old Posted Sep 19, 2015, 2:15 PM
chris08876's Avatar
chris08876 chris08876 is offline
 
Join Date: Jul 2013
Posts: 49,410
I'd be curious to see some stats on the daytime population of Miami. All of these developments, and business moving into the city must make it rise to 700k or so.
Reply With Quote
     
     
  #3128  
Old Posted Sep 20, 2015, 12:08 AM
bobdreamz's Avatar
bobdreamz bobdreamz is offline
 
Join Date: Mar 2002
Posts: 8,270
Port Miami dredge finally done

Port Miami dredge finally done but questions remain about reef damage
SEPTEMBER 18, 2015
BY JENNY STALETOVICH
[email protected]


^ Miami-Dade County Mayor Carlos Gimenez, with scissors, marks the completion of the Deep Dredge project at Port Miami with Florida Lt. Gov. Carlos Lopez-Cantera, Gov. Rick Scott and Miami-Dade Commissioner Rebeca Sosa and other officials on Friday.

Gov. Rick Scott and other backers of the Deep Dredge at PortMiami celebrated the project’s completion Friday even as federal officials continue to argue over environmental damage done by the $205 million project.

At a ribbon cutting attended by several hundred port workers and officials, Scott repeatedly touted the 33,000 jobs he said the three-year-long expansion would produce.

“The most important thing we can be doing is creating jobs,” said Scott, who chipped in $77 million from the state to kickstart the long-delayed project.

Deepening the port channel by about six feet to 52-feet deep will allow massive ships sailing through an expanded Panama Canal to bring cargo to Miami and completes a $1 billion makeover that included a controversial new tunnel.

The expansion makes PortMiami the only port south of Virginia large enough to accommodate the giant ships and, if projections of booming business prove accurate, could pump about $7 billion into the region, Scott said.

“That $77 million investment will have a return on investment of $7 billion. That’s a pretty good ROI for you business people out there,” said Lt. Gov. Carlos López-Cantera, a former state representative from Miami. “This is a tremendous thing.”

But critics contend the project’s boosters have overinflated the potential surge in shipping and underestimated the environmental costs, topped by the destruction of coral in Government Cut, the loss of several acre of reefs off Miami Beach and additional damage to reefs and seagrass from silt and sediment.

Environmentalists sued to force the U.S. Army Corps of Engineers, which managed the project, to improve coral and seagrass protection. More than five million cubic yards of mud, rock and sand was barged to an offshore dump site, churning up sediment that could cloud water and damage marine life. And federal environmental agencies also required the Corps to take steps to monitor the sediment — and stop work to give water time clear.

But as work neared completion, state and federal regulators found the Corps and its contractor, Great Lakes Dredge & Dock, caused far more damage than expected. A year ago, state divers found sediment had left behind a moonscape, with coral buried and dying. Leaky barges repeatedly wracked up violations. In August, the National Marine Fisheries Service warned the Corps that damage covered four times the area allowed in its permit.

The Fisheries Service has repeatedly asked the Corps to provide a more accurate tally of how much marine life was damaged and what steps are needed to help repair it. In a letter to the Corps’ Jacksonville commander earlier this month, the Fisheries Service said the Corps “seems to selectively choose certain results to downplay the permanent effects” of the dredge.

“They’re claiming, ‘We don’t know what this area looked like before the dredging, so we don’t know what’s natural and what’s dredging,’” said Rachel Silverstein, executive director of Miami Waterkeeper, one of the groups that has fought for better monitoring. “I strongly disagree with that and so does [the Fisheries Service]. There’s many ways to tell whether it’s dredging.”

When asked Friday, Scott — who has made steep cuts to the Department of Environment Protection and come under criticism for spending too little to protect Florida wilderness — said the state would work with the Corps to make sure damage is addressed.

“They’re going to make sure that everything’s done properly and make sure that we continue to fix anything that we find,’’ he said. “One thing that’s great about this state is the people either locally or at the state level, they want to fix problems. And we have a very good relationship with the Corps of Engineers.”

Miami-Dade Mayor Carlos Gimenez said the county, which will ultimately foot the bill for any work to repair the reef, will continue to monitor the area for signs of damage for five years.

“We’re in the middle of two federal agencies,” he said. “By the same token, I’m glad this project came to fruition. It’s important for our economy.”

Read more here: http://www.miamiherald.com/news/local/environment/article35764035.html#storylink=cpy



• Video Link


Updated rail line to Port Miami :


https://upload.wikimedia.org/wikipedia/c...C_line_track_repair_to_Port_of_Miami.jpg


http://www.boche.net/trains/port%20of%20miami%20containers1.jpg

Last edited by bobdreamz; Sep 20, 2015 at 6:05 PM.
Reply With Quote
     
     
  #3129  
Old Posted Sep 20, 2015, 7:30 PM
bobdreamz's Avatar
bobdreamz bobdreamz is offline
 
Join Date: Mar 2002
Posts: 8,270
Royal Caribbean plans huge new Port Miami cruise terminal

Royal Caribbean plans huge new Port Miami cruise terminal
10 September 2015

Royal Caribbean Cruises Ltd. is in talks with Miami-Dade County officials to build a $100m cruise terminal at PortMiami with a berth capable of handling ships up to 400 meters long—plenty ample for a 360-meter Oasis-class vessel.

'We can't park our biggest ships in Miami and, with a project like this, we could. So this opens lots of possibilities,' Royal Caribbean spokesman Rob Zeiger told Seatrade Cruise News.

According to county documents, the cruise operator would design, finance and build the new Cruise Terminal A on a 10-acre site at the northeastern end of the port, in an area that is partly now used for cargo operations.

PortMiami anticipates Royal Caribbean would invest well over $100m during the construction phase of the project and the port will invest several million dollars.

Zeiger could not confirm the $100m figure but said that would put the terminal among the company's most costly infrastructure investments. He added it's too early to talk about design details. The timeline, he acknowledged, is very short—the memorandum of understanding talks about a July 31, 2018 target completion date—but 'We think we can build this as fast as we can build a ship.'

Zeiger called the plans a vote of confidence for South Florida, adding that he doesn't anticipate any port to be a loser in a situation like this in view of the company's newbuild orderbook. Royal Caribbean has a 'really great relationship with Port Everglades,' which was 'able to execute for Oasis and Allure,' he noted, in building the $75m Terminal 18.

'It feels good when we can grow anywhere and make an economic impact. It feels especially good when it's in our hometown,' Zeiger added.

The ground lease would have an initial 20-year term, with Royal Caribbean holding an option to extend for up to four additional terms of 10 years each.

Base rent for the facility would be $9.5m a year, with a 1.5% increase compounded annually. In addition, the county would receive $5.50 per passenger move for every Royal Caribbean passenger in excess of 1.55m passenger moves each year at Cruise Terminal A.

Before 2009, PortMiami averaged more than 1.6m Royal Caribbean passengers annually. Subsequently Miami lost a majority of the cruise giant's business when the new Oasis of the Seas and Allure of the Seas began operating year-round at Port Everglades.

At the time, Miami didn't have facilities capable of accommodating these ships nor did it have suitable expansion plans.

PortMiami currently handles about 730,000 Royal Caribbean passengers a year, about 15% of the port's overall passenger traffic. The cruise operator's contractual guarantee to the county is only 325,000 passengers a year for the preferential use of Cruise Terminal G, at the northwestern end of the port.

Under the PortMiami 2035 Master Plan, adopted in late 2010, eight cruise berths are envisioned along the north channel—six existing berths, plus two new berths. The new berths, called Cruise Terminal A and Cruise Terminal AA, would be the last possible facilities on the port's north side.

[See also related story from an interview with PortMiami director Juan Kuryla.] Copyright 2015 Seatrade.

Source: http://www.seatrade-cruise.com/news/news...-huge-new-portmiami-cruise-terminal.html


http://www.miamidade.gov/portmiami/library/portmiami-map.pdf


https://upload.wikimedia.org/wikipedia/commons/7/7f/Port_of_Miami_Florida.jpg
Reply With Quote
     
     
  #3130  
Old Posted Sep 21, 2015, 11:07 AM
eleven=11 eleven=11 is offline
 
Join Date: Aug 2012
Posts: 1,053
Quote:
Originally Posted by ryanconstraction View Post
The Miami development thread is quite famous. It has been seen that this thread has got numerous development ideas from making innumerable spacious buildings to build various in-residential facilities. In fact, some outstanding commercial facilities as well as entertainment services are also added in these development features that give some wonderful sumptuous service to the entire people who will attend to have a visit to this place.
yes I agree numerous innumerable sumptuous famous. jeb!
Reply With Quote
     
     
  #3131  
Old Posted Sep 21, 2015, 12:59 PM
GoldenDuskPhotograph's Avatar
GoldenDuskPhotograph GoldenDuskPhotograph is offline
 
Join Date: Apr 2014
Posts: 1,262
Reply With Quote
     
     
  #3132  
Old Posted Sep 23, 2015, 12:17 AM
bobdreamz's Avatar
bobdreamz bobdreamz is offline
 
Join Date: Mar 2002
Posts: 8,270
^ Not fond of seeing these old apartment complexes in Edgewater being razed.
Reply With Quote
     
     
  #3133  
Old Posted Sep 23, 2015, 2:04 PM
chris08876's Avatar
chris08876 chris08876 is offline
 
Join Date: Jul 2013
Posts: 49,410
Riviera Beach considers $35M hotel with mixed use at marina



Quote:
Viking Developers will go before the Riviera Beach Community Redevelopment Agency (CRA) on Sept. 23 seeking design approval and partial public ownership for its $35 million project. The marina is already in the midst of a $375 million redevelopment that will include shops, restaurants, a boardwalk promenade and boat slips. The city is trying to raise funds for a 50,000-square-foot market for local produce and wares.

The potential new addition would be a six-story building with 37,600 square feet of commercial space, 66 hotel rooms and 751 parking spaces. The developer asked the CRA to secure financing to support the $15 million parking deck and place ownership in public hands, since the parking would serve the entire site. Viking Developers estimated the $282,000 in tax increment revenue generated annually for the CRA from the privately-owned portion of the site would be enough to support debt payments on the parking deck.

The building would include 66 hotel rooms, 21,200 square feet of retail space, 750 square feet of office space and a fitness center. It would also have a 5,000-square-foot restaurant, a sky bar and a pool on the top floor.
=============================
http://www.bizjournals.com/southflorida/...-considers-35m-hotel-with-mixed-use.html
Reply With Quote
     
     
  #3134  
Old Posted Sep 23, 2015, 2:58 PM
Private D Private D is offline
 
Join Date: Aug 2010
Posts: 3,058
Quote:
Originally Posted by bobdreamz View Post
^ Not fond of seeing these old apartment complexes in Edgewater being razed.
Yeah, it —. That's Miami history being reduced to rubble right there... some of Miami's older buildings biting the dust... for some Russian oligarch's pet project.
Reply With Quote
     
     
  #3135  
Old Posted Sep 23, 2015, 6:58 PM
chris08876's Avatar
chris08876 chris08876 is offline
 
Join Date: Jul 2013
Posts: 49,410
700 Northeast 26th Terrace in Edgewater will be seeing another 646 foot tower.
Reply With Quote
     
     
  #3136  
Old Posted Sep 24, 2015, 5:14 PM
dave8721 dave8721 is offline
 
Join Date: Jul 2005
Posts: 4,197
Quote:
Originally Posted by Private Dick View Post
Yeah, it —. That's Miami history being reduced to rubble right there... some of Miami's older buildings biting the dust... for some Russian oligarch's pet project.
Elsewhere in Edgewater 97-year old buildings are coming down for this snore-fest of a building:
to go at 111 - 123 NE 25th ST
http://www.bizjournals.com/southflorida/...r-proposes-94-unit-condo-in-miami-s.html
Quote:
Developer proposes 94-unit condo in Miami’s Edgewater

Condo developer Spider wasted no time in filing plans for its latest Miami project after buying land in the Edgewater neighborhood.
On Aug. 19, the company led by Andres Goldenberg paid $4.4 million for the 27,000-square-foot site at 113 and 123 N.E. 25th Street. The land currently has small residential buildings.
Spider recently filed an application with the city to build a 12-story, 94-unit condo on the property. It has yet to be named.

“The biorhythm of investment has changed and the real estate industry needs to adapt by applying metrics to projects that appeal to today’s investor seeking speed to market, and return on investment,” Goldenberg said. “As such, our innovative due diligence process for land acquisitions works simultaneous with activities performed by our task force in advance of deals closing, significantly reducing the timeline for a project from start to finish.”
The property is about three blocks west of Biscayne Bay.
Located just north of downtown Miami, Edgewater has boomed with high-rise residential development in recent years. Developers such as the Related Group and Melo Group are building towering condos on the water or within a block of the bay.
At the same time, Spider has planned the 28-unit Spark condominium at 522 N.E. 34th Street in Edgewater. It also owns 22,000 square feet of land on Harding Avenue in Miami Beach.
Reply With Quote
     
     
  #3137  
Old Posted Sep 24, 2015, 7:07 PM
chris08876's Avatar
chris08876 chris08876 is offline
 
Join Date: Jul 2013
Posts: 49,410
Several Related Group towers were approved today by the FAA. They include:

Quote:
One Brickell, Tower I (832 feet above sea level, 828 feet above ground)
One Brickell, Tower II (639 feet above sea level, 635 feet above ground)
One Brickell, Tower III (881 feet above sea level, 877 feet above ground)
Auberge Residences, Tower I (649 feet above sea level, 646 feet above ground)
Auberge Residences, Tower II (649 feet above sea level, 646 feet above ground)
Auberge Residences, Tower III (533 feet above sea level, 530 feet above ground)
======================
nxt
Reply With Quote
     
     
  #3138  
Old Posted Sep 24, 2015, 7:45 PM
N830MH N830MH is offline
 
Join Date: Jan 2011
Posts: 3,128
Quote:
Originally Posted by chris08876 View Post
Several Related Group towers were approved today by the FAA. They include:


======================
nxt
Excellent news!!! Let start build a new tower. Let get going!!
Reply With Quote
     
     
  #3139  
Old Posted Sep 24, 2015, 8:17 PM
chris08876's Avatar
chris08876 chris08876 is offline
 
Join Date: Jul 2013
Posts: 49,410
6 more 150m+ are always nice. Cities doing really well. More I'd imagine will come once more details are revealed for the innovation district and Miami Central.

Add another one for 7 with the Baybakov developers intention.
Reply With Quote
     
     
  #3140  
Old Posted Sep 25, 2015, 11:42 AM
GoldenDuskPhotograph's Avatar
GoldenDuskPhotograph GoldenDuskPhotograph is offline
 
Join Date: Apr 2014
Posts: 1,262
Quote:
Originally Posted by bobdreamz View Post
^ Not fond of seeing these old apartment complexes in Edgewater being razed.
A lot of those homes, although old and beat up, are still very nice if they were renovated and restored. http://www.goldenduskphotography.com/blo...-house-in-1984-before-after?rq=edgewater

Most of the houses in West Brickell are old, but aren't very great architecturally. Like the ones seen here: http://www.goldenduskphotography.com/blog/2015/9/23/miami-city-self-storage-coming-to-west-brickell
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 10:59 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.