Lets see if the improved N19 service helps first of all.
     
     
  #13602  
Old Posted Aug 28, 2015, 11:20 AM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,053
... on the Canada Line .......

... are there any stations where it would be IMPOSSIBLE, for whatever reasons, to lengthen the platforms to take 3-car trains?
     
     
  #13603  
Old Posted Aug 28, 2015, 12:29 PM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,093
Quote:
Originally Posted by trofirhen View Post
... are there any stations where it would be IMPOSSIBLE, for whatever reasons, to lengthen the platforms to take 3-car trains?
Waterfront comes to mind. You can't go forward as you would intersect the SkyTrain and you can't go back as there's a switch almost immediately before the station.
     
     
  #13604  
Old Posted Aug 28, 2015, 3:30 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,790
Quote:
Originally Posted by MIPS View Post
Waterfront comes to mind. You can't go forward as you would intersect the SkyTrain and you can't go back as there's a switch almost immediately before the station.
...which is why Waterfront was built as a longer station than most.
     
     
  #13605  
Old Posted Aug 28, 2015, 8:16 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,149
It's also a long ways north before you hit the skytain tracks. There is a parking lot between the end of the Canada Line tracks and the skytrain.
     
     
  #13606  
Old Posted Aug 28, 2015, 9:14 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by LeftCoaster View Post
It's also a long ways north before you hit the skytain tracks. There is a parking lot between the end of the Canada Line tracks and the skytrain.
The Waterfront Canada Line platform is already long enough for 3-car trains when they arrive.

And the distance from the current Canada Line bumpers to the Expo/Millennium ROW at Waterfront means the future Canada Line extension to Lonsdale Quay can run under the Expo/Millennium line on its way under the harbour to North Van.
(maybe in our lifetimes?)
     
     
  #13607  
Old Posted Aug 28, 2015, 9:44 PM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by nname View Post
Then they need to reopen all the stations, move all equipment away, re-power the track, have one not-in-service train before and after to drop-off and pick-up attendants, re-clear all the platforms again, have someone in the terminus to clean up the train, then shut down the system again, move equipment back... Pretty much 2 hours of work and more than 50 people involved just to run that one train. Would they charge $20 per ticket?
Makes sense, thanks.
     
     
  #13608  
Old Posted Aug 28, 2015, 10:20 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
the stations in Richmond and Sea Island, can those be lengthened to the 50m for 3-car trains? i know the underground ones i can see the cinder-block-temporary-wall. but looking at the other ones, i don't see anything rough in for another 10m and the current platforms arent long enough for the 3-car trains.
     
     
  #13609  
Old Posted Aug 28, 2015, 10:30 PM
TransitJack TransitJack is offline
Registered User
 
Join Date: Jul 2009
Posts: 443
Brighouse and YVR are already at 50m. The rest can be expanded.
     
     
  #13610  
Old Posted Aug 28, 2015, 11:45 PM
finalcoolman finalcoolman is offline
Registered User
 
Join Date: Nov 2004
Posts: 262
Quote:
Originally Posted by jsbertram View Post
The Waterfront Canada Line platform is already long enough for 3-car trains when they arrive.

And the distance from the current Canada Line bumpers to the Expo/Millennium ROW at Waterfront means the future Canada Line extension to Lonsdale Quay can run under the Expo/Millennium line on its way under the harbour to North Van.
(maybe in our lifetimes?)
This has been addressed before and it is impossible. Not enough room to 'dive' under the Inlet.
     
     
  #13611  
Old Posted Aug 28, 2015, 11:45 PM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Moreover, Sea Island and Templeton just need the platform foundation frame built since the area around it is already levelled for expansion. Bridgeport (I believe?) was also built to 50m.
     
     
  #13612  
Old Posted Aug 29, 2015, 3:05 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,790
Quote:
Originally Posted by VancouverOfTheFuture View Post
the stations in Richmond and Sea Island, can those be lengthened to the 50m for 3-car trains? i know the underground ones i can see the cinder-block-temporary-wall. but looking at the other ones, i don't see anything rough in for another 10m and the current platforms arent long enough for the 3-car trains.
The key requirement for building a station is that the guideway be straight and (almost completely) level. Anywhere those conditions exist a station can be built around the track. It's designing the track that way which creates the "possible future station at" and "platform can be lengthened" capabilities.
     
     
  #13613  
Old Posted Aug 29, 2015, 3:22 AM
TransitJack TransitJack is offline
Registered User
 
Join Date: Jul 2009
Posts: 443
Quote:
Originally Posted by deasine View Post
Moreover, Sea Island and Templeton just need the platform foundation frame built since the area around it is already levelled for expansion. Bridgeport (I believe?) was also built to 50m.
Bridgeport is only 40m. Probably should have been built to 50m from the start. I think the plan is to expand 5m on each end of the platform as there are supports on either side that just need a beam added across (plus all the typical edge and endgate work)
     
     
  #13614  
Old Posted Aug 29, 2015, 4:15 AM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,971
The problem with greater frequency is at Waterfront.

The single line section into Richmond/Brighouse is OK as it can still run trains every 3 minutes if needed. The problem is at Waterfront where the 2 lines merge at Bridgeport and run every 3 minutes but will be very hard pressed to do so because that would mean trains every 2 minutes on one track and one only one side of the station.

This is because Translink wants to have a stand-by train at Waterfront which is why there is always one there that never moves. Although it is a good idea in theory the reality is that due to not having planned for emergency train space, it ends up taking up half the platform and track.

If they want to increase frequency then something must be done at Waterfront station to open up the platform and tracks. They are going to have to eventually build a short stubway off the main tracks to hold one train for emergencies whether it be at Waterfront or City Centre.

All the stations are designed to be relatively easily made to 50 meters but as long as Translink keeps a train at Waterfront, frequency cannot be any higher than it is unless they short-turn some of the trains at City Centre.
     
     
  #13615  
Old Posted Aug 29, 2015, 5:37 AM
bardak bardak is offline
Registered User
 
Join Date: Oct 2010
Posts: 370
Quote:
Originally Posted by ssiguy View Post
The problem with greater frequency is at Waterfront.

The single line section into Richmond/Brighouse is OK as it can still run trains every 3 minutes if needed. The problem is at Waterfront where the 2 lines merge at Bridgeport and run every 3 minutes but will be very hard pressed to do so because that would mean trains every 2 minutes on one track and one only one side of the station.

This is because Translink wants to have a stand-by train at Waterfront which is why there is always one there that never moves. Although it is a good idea in theory the reality is that due to not having planned for emergency train space, it ends up taking up half the platform and track.

If they want to increase frequency then something must be done at Waterfront station to open up the platform and tracks. They are going to have to eventually build a short stubway off the main tracks to hold one train for emergencies whether it be at Waterfront or City Centre.

All the stations are designed to be relatively easily made to 50 meters but as long as Translink keeps a train at Waterfront, frequency cannot be any higher than it is unless they short-turn some of the trains at City Centre.
The train at waterfront is there because at the current headways they only need one side of the platform. If you only need one side of the platform you might as well store a spare on the other side just in case. It's not some set in stone rule that would hold back increasing the frequency. When they decide to increase the frequency they will remove the spare and use both side of the platform. It is a simple operational change.
     
     
  #13616  
Old Posted Aug 29, 2015, 8:25 PM
st7860 st7860 is offline
BANNED
 
Join Date: Nov 2010
Posts: 1,299
     
     
  #13617  
Old Posted Aug 29, 2015, 9:22 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,790
Quote:
Originally Posted by st7860 View Post
i saw this on FB a few minutes ago.
You know, I was just thinking about going to the downtown library today, but with all the wind I worried that there might be some Skytrain issues. There are branches coming down everywhere, so I'm not at all surprised to see this.
     
     
  #13618  
Old Posted Aug 30, 2015, 1:35 AM
Large Cat's Avatar
Large Cat Large Cat is offline
Vancouver Bus Driver
 
Join Date: Oct 2014
Location: Vancouver, BC
Posts: 396
Noooo not a mark ii!! Is that write-off level damage or repairable?
     
     
  #13619  
Old Posted Aug 30, 2015, 1:42 AM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by Large Cat View Post
Noooo not a mark ii!! Is that write-off level damage or repairable?
That's easily repaired. If the film industry can acquire a Mark II front end to film a train barreling down on someone, they can certainly do it to fix one.

And judging by what that looks like, it looks like they would just need to replace the glass, the rest of the front is fiberglass.
     
     
  #13620  
Old Posted Aug 30, 2015, 3:13 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
Fiberglass? I was expecting metal material. I think the MK I train skin was constructed with metal?
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:52 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.