Originally Posted by MalcolmTucker View Post
The more important part of the announcement is that it came from the "National Infrastructure Component". That means it did not take any more allocation out of the Alberta pot of the New Building Canada Fund Provincial-Territorial Infrastructure Component.

The differences between the pots here: http://www.infrastructure.gc.ca/plan/nbcf-nfcc-eng.html
Indeed

I also understand the project scope for SWRR has extended west to 101st rather than stopping at 69th as it was before. SW project scope has grown, west leg is now a smaller project once it gets going.
Reply With Quote
     
     
  #6322  
Old Posted Jul 31, 2015, 5:31 AM
sim sim is offline
Registered User
 
Join Date: Aug 2008
Posts: 863
Quote:
Originally Posted by suburbia View Post
Follow-up to my news yesterday:

Quote:
... funding of up to $582.9 million for the Southwest Calgary Ring Road Project under the National Infrastructure Component of the New Building Canada Fund. The work will ease congestion, reduce travel times and improve safety on the highway commonly known as the Stoney Trail.
http://news.gc.ca/web/article-en.do?mthd=index&crtr.page=1&nid=1011079
Nothing like basing a several billion dollar piece of infrastructure on falsehoods.

Today I will use my first hashtag ever: #stoptheBS
Reply With Quote
     
     
  #6323  
Old Posted Jul 31, 2015, 5:59 AM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by Wooster View Post
I also understand the project scope for SWRR has extended west to 101st rather than stopping at 69th as it was before. SW project scope has grown, west leg is now a smaller project once it gets going.

I didn't realize this - great news! Let's hope the last pinch heading south from 16th ave doesn't get delayed too much past this portion.
Reply With Quote
     
     
  #6324  
Old Posted Jul 31, 2015, 3:36 PM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by 5seconds View Post
Something that I noticed in the announcement that was oddly not reported by any of the media outlets was an estimated cost. Kenney stated that the $583m figure was roughly 25% of the $2.8b estimated price tag for this leg.
That's just the construction costs, and don't include the construction mafia vacation account fees.
Reply With Quote
     
     
  #6325  
Old Posted Jul 31, 2015, 3:42 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,635
Quote:
Originally Posted by 5seconds View Post
Something that I noticed in the announcement that was oddly not reported by any of the media outlets was an estimated cost. Kenney stated that the $583m figure was roughly 25% of the $2.8b estimated price tag for this leg.
The province is sensitive about ever announcing the cost of something before the tender is done. Leads to some absurdities for sure.
Reply With Quote
     
     
  #6326  
Old Posted Jul 31, 2015, 4:04 PM
Cage Cage is offline
Registered User
 
Join Date: Oct 2010
Location: YYC
Posts: 2,750
Quote:
Originally Posted by 5seconds View Post
We haven't had an answer from the Province on the Green Line, have we? This might provide flexibility for the Province now.

EDIT: Or does this just mean that the Province can green-light the West leg?
Call me cynical, but I think the provincial NDP will use the freed up cash for something else, like healthcare or education. I also don't expect the provincial NDP to tell Albertans where the $583 million freed up cash was put to good use.
Reply With Quote
     
     
  #6327  
Old Posted Jul 31, 2015, 4:27 PM
Socguy Socguy is offline
Registered User
 
Join Date: May 2008
Posts: 494
Quote:
Originally Posted by Cage View Post
Call me cynical, but I think the provincial NDP will use the freed up cash for something else, like healthcare or education. I also don't expect the provincial NDP to tell Albertans where the $583 million freed up cash was put to good use.
I take it you don't approve of healthcare and education?

But seriously, the federal conservatives must be a little nervous about their base in Calgary if they're actually spending real $$$ in this city before an election.

Regarding the RR, just build the whole thing. If we need to expand the project to cope with the problems an uncompleted RR will create and it's going to be all built eventually just do it. Delaying the project will just cost more in the end anyway.
Reply With Quote
     
     
  #6328  
Old Posted Jul 31, 2015, 4:58 PM
Joborule Joborule is offline
Registered User
 
Join Date: Dec 2007
Location: Calgary, AB
Posts: 179
Quote:
Originally Posted by 5seconds View Post
For sure.

Since the announcement is the result of the Province applying for the funding, they would have had to provide rough numbers, so it was interesting to hear the $2.8b figure.

I believe this is the first time that a rough estimate for just the SW leg has been publicly mentioned, and since the media (understandably) alway latches onto the $5b figure and is always asking about cost, I was surprised that not one media outlet reported on it.

EDIT: What is also interesting is that with the funding coming from the National Infrastructure Component (Thanks for pointing that out), and all of the talk about helping cargo get around the city and US tourists etc, those benefits would only happen if the west leg were also completed. I just found it interesting that they were talking about the national importance of the project, but when you look at them, those importances only come to fruition with the completion of both legs.
The west leg is important, but how important? Couldn't Sarcee Trail get the job done for bypass traffic, thus fulfilling the need (for the meantime) of the west leg? (Assuming all interchanges are built to their ultimate form along the corridor)
Reply With Quote
     
     
  #6329  
Old Posted Aug 1, 2015, 2:38 AM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 601
Wasn't there a legion parking lot getting paved in the Maritimes that got funding from one of these slush funds?

I wouldn't read too much into it. Given this portion is going through a native reserve the Fed's are already involved. Did the federal government contribute anything to the freeway around Edmonton?
Reply With Quote
     
     
  #6330  
Old Posted Aug 1, 2015, 2:52 AM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by ClaytonA View Post
Wasn't there a legion parking lot getting paved in the Maritimes that got funding from one of these slush funds?

I wouldn't read too much into it. Given this portion is going through a native reserve the Fed's are already involved. Did the federal government contribute anything to the freeway around Edmonton?
According to the most recent news release I found from the province that has anything in it, the feds kicked in $37M for the Edmonton ring road.
Reply With Quote
     
     
  #6331  
Old Posted Aug 1, 2015, 4:43 AM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 601
Thanks Mersar,

Yeah I'd thought there was some GoC contribution since there was the CANAMEX highway angle up there.

Google found an announcement from 2009 for one interchange for $168.6 million.
http://news.gc.ca/web/article-en.do?nid=436299

To clarify my comment - this GoC funding could always have been planned for and isn't extra and doesn't free up money for other provincial priorities. It's not "free" money like the Green Line funding.

It'll be interesting to see what David Dodge's recommendations are especially given the long, low commodity prices scenario discussed in the business pages. Things like the Cancer Centre, Crowchild Tr bridge, Deerfoot, and SWRR appear to be catch up infrastructure needed regardless of the next five year's economic growth.
Reply With Quote
     
     
  #6332  
Old Posted Aug 1, 2015, 3:26 PM
Socguy Socguy is offline
Registered User
 
Join Date: May 2008
Posts: 494
Quote:
Originally Posted by ClaytonA View Post
...
It'll be interesting to see what David Dodge's recommendations are especially given the long, low commodity prices scenario discussed in the business pages. Things like the Cancer Centre, Crowchild Tr bridge, Deerfoot, and SWRR appear to be catch up infrastructure needed regardless of the next five year's economic growth.
Very much so. It's my understanding that his mandate is to recommend infrastructure projects needed by the Provence which stimulate enough economic activity to justify the cost of borrowing to build them.

Considering how far this Provence has fallen behind in infrastructure and if David Dodge recommends enough major projects, I can see this government keeping this Provence out of recession through new construction until the price of oil comes back in 4 or 5 years.

I know lots of people in this Provence would lose their minds at this thought but I'm not one of them. All the factors are lining up to make now the time to build!
Reply With Quote
     
     
  #6333  
Old Posted Aug 1, 2015, 7:50 PM
Acey
Guest
 
Posts: n/a
Quote:
Originally Posted by Joborule View Post
The west leg is important, but how important? Couldn't Sarcee Trail get the job done for bypass traffic, thus fulfilling the need (for the meantime) of the west leg? (Assuming all interchanges are built to their ultimate form along the corridor)
Sarcee can't handle its current traffic, to serve as the west leg of the ring it would need hundreds of millions of dollars in improvements.
Reply With Quote
     
     
  #6334  
Old Posted Aug 2, 2015, 3:47 PM
Joborule Joborule is offline
Registered User
 
Join Date: Dec 2007
Location: Calgary, AB
Posts: 179
Quote:
Originally Posted by Acey View Post
Sarcee can't handle its current traffic, to serve as the west leg of the ring it would need hundreds of millions of dollars in improvements.
Yes, the question was aimed would it be better off (thus, save money) to invest into Sarcee upgrades, rather than spending on building the west leg?

Probably not since the west leg will eventually have to be built, and due to inflation would be more costly in the long run. The cost difference likely wouldn't be that large to justify it also.
Reply With Quote
     
     
  #6335  
Old Posted Aug 3, 2015, 3:08 AM
Socguy Socguy is offline
Registered User
 
Join Date: May 2008
Posts: 494
Quote:
Originally Posted by Joborule View Post
Yes, the question was aimed would it be better off (thus, save money) to invest into Sarcee upgrades, rather than spending on building the west leg?...
The other issue is who pays. The RR is a provincial project but Sarcee is a city road. I doubt the Provence wants to give the city hundreds of millions to upgrade Sarcee only to spend a ton more money finishing the RR in a few years.

If you mean that the Provence would never build the West leg and Sarcee would be the permanent west portion of the RR, I don't think that would work either as I would wager the cost to upgrade Sarcee to RR standards would be almost as high as building the West leg.

Although I get where you're coming from. I think that Sarcee is going to be a mess without the West leg.
Reply With Quote
     
     
  #6336  
Old Posted Aug 3, 2015, 3:22 AM
Porfiry Porfiry is offline
Registered User
 
Join Date: May 2010
Posts: 802
Quote:
Originally Posted by Socguy View Post
I doubt the Provence...
Off topic, but why do you keep misspelling this? Alberta is a province, Provence is in France.
Reply With Quote
     
     
  #6337  
Old Posted Aug 3, 2015, 9:32 PM
Socguy Socguy is offline
Registered User
 
Join Date: May 2008
Posts: 494
Quote:
Originally Posted by Porfiry View Post
Off topic, but why do you keep misspelling this? Alberta is a province, Provence is in France.
Spellcheck
Reply With Quote
     
     
  #6338  
Old Posted Aug 27, 2015, 8:24 PM
DoubleK DoubleK is offline
Near Generational
 
Join Date: Sep 2011
Location: Calgary
Posts: 1,447
I am so happy that *most* of Stoney Trail has been and will be greenfield construction with a couple exceptions.

I had the misfortune of being on AHD in Edmonton earlier this week. What an absolute gongshow from Whitemud North.
Reply With Quote
     
     
  #6339  
Old Posted Aug 27, 2015, 11:52 PM
Wentworth Wentworth is offline
Registered User
 
Join Date: Apr 2009
Location: Wentworth
Posts: 430
Just to add another random comment to this thread today... seems a lot of my neighbors here in West Springs are still under the belief that the West leg (Hwy16-Hwy8) is going to be built sometime in the next 5 years. One even thinks they've already started construction because there has been unusual activity at the Burnco site lately.
Reply With Quote
     
     
  #6340  
Old Posted Aug 28, 2015, 3:40 PM
Mazrim's Avatar
Mazrim Mazrim is offline
Registered User
 
Join Date: Aug 2009
Location: Calgary, Alberta
Posts: 1,407
Quote:
Originally Posted by Wentworth View Post
Just to add another random comment to this thread today... seems a lot of my neighbors here in West Springs are still under the belief that the West leg (Hwy16-Hwy8) is going to be built sometime in the next 5 years. One even thinks they've already started construction because there has been unusual activity at the Burnco site lately.
I think some of the Burnco activity is related to the ring road, but it's basically opportunity work that's ultimately not tied to the construction of the road itself.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:23 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.