Quote:
Originally Posted by VanCvl View Post
Not at all. If you were a geotechnical engineer writing the baseline report you would recommend the most conservative approach because if you're wrong then there is all sort of liability - plus the fact that Engineers are typically conservative and some tend to over design.

Contractors see the same bore hole samples and make their own conclusions and determine methodologies based on their experience and equipment. Everyone understands that the bore holes are indicative but not a total representation of the ground conditions.
Thank you for your insight. That's probably the best comment I've read on this thread in 6 months.
__________________
Confidence is that uplifting feeling you have immediately before you fully comprehend the situation.
     
     
  #8702  
Old Posted Aug 12, 2015, 5:46 PM
Ridgerunner Ridgerunner is offline
BANNED
 
Join Date: Dec 2014
Posts: 144
no relation

Quote:
Originally Posted by s211 View Post
Are you related to ridgerunner? I'm trying to understand what's to be gained by a witch hunt. What result are you hoping to achieve, and do you think that your hunt will have any possible affect on any kind of outcome you're looking for? Otherwise, it's all just wind and rhetoric.

Again, I have ZERO involvement in this project, but I find the hoards with pitchforks looking for someone to string up somewhat baffling, if not unfortunately comic.
To S211

a) no relation. But I like his style.

b) in the same way as you don't understand why I like a rigorous inquiry, I can't understand how you can take a series of laughable excuses so cavalierly.

Doesn't it offend you when people feed you some "happy horseshit"? I do get offended.
     
     
  #8703  
Old Posted Aug 14, 2015, 6:44 PM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 768
Here's my videos from the past 3 years showing the annual progress at Lougheed:
2013
2014
2015
     
     
  #8704  
Old Posted Aug 18, 2015, 9:16 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,103
The final version of NES ATP and Evergreen extension bus integration plan is released. A few interesting note about the integration:
  • 97 and 190 are cancelled, as expected
  • 160 to terminate at Kootenay Loop and will provide local service throughout the entire route
  • Every second 160 during peak hour will extend into downtown (local? or as 135? good luck trying to squeeze onto the bus in downtown during pm peak)
  • 151 will run from Burquitlam to Port Coquitlam via Como Lake, and will use articulated bus during peak hours
  • 158/C35/177 will be revived between Braid and Planet Ice (std bus peak, shuttle off peak)
  • C37 and C40 will connect PoCo with Coquitlam Station, instead of C38
  • Guildford portion of 97 will be replaced by a new FTN route
  • 153 will be wholly shuttle; C27 will always use std bus; 157, C24, C30 will be mixed. So much for the 'C' prefix...
     
     
  #8705  
Old Posted Aug 18, 2015, 11:56 AM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
I can see the 135 being stealthily turned into a B-Line once the 160 local service to Kootenay comes into play...

Also disappointed that the middle of old Coquitlam is still not receiving the attention it deserves. It's like they prefer buses doing donuts around there with a multitude of confusing route numbers vs a simple and proper frequent transit network. Sigh.

Finally, in the longer term I think they can combine the New 7 with the 188. In this way, they can take pressure off of the bus loop at Coquitlam Central AND bring FTN service to Port Coquitlam and Burke Mountain at the same time.
     
     
  #8706  
Old Posted Aug 18, 2015, 5:28 PM
ninjakafi_81 ninjakafi_81 is offline
Registered User
 
Join Date: Nov 2011
Location: Vancouver, BC
Posts: 342
Where does it say that the 151 will be using articulated buses during the peak hours. I've read through the document a couple of times and didn't see anything mentioning about that. Also, I think it would of been better of if the " new " 151 went along Mariner Way, mimicking the 143, instead of going along Spuraway Ave. Then the 152 will go along Spuraway Ave instead to cover those areas.

I'm not sure how times I've mentioned this, but I really think Translink should get rid of the C prefixes once and for all. You got shuttles buses operating on conventional prefixed routes and vise versa. To makes things simple for everyone, they should just revert all the C prefix routes back to their original route numbers and if they were a new community shuttle route, give them a new route number.
     
     
  #8707  
Old Posted Aug 18, 2015, 5:49 PM
Express691 Express691 is offline
Registered User
 
Join Date: Aug 2015
Posts: 650
Quote:
Originally Posted by nname View Post
The final version of NES ATP and Evergreen extension bus integration plan is released. A few interesting note about the integration:
  • 97 and 190 are cancelled, as expected
  • 160 to terminate at Kootenay Loop and will provide local service throughout the entire route
  • Every second 160 during peak hour will extend into downtown (local? or as 135? good luck trying to squeeze onto the bus in downtown during pm peak)
  • 151 will run from Burquitlam to Port Coquitlam via Como Lake, and will use articulated bus during peak hours
  • 158/C35/177 will be revived between Braid and Planet Ice (std bus peak, shuttle off peak)
  • C37 and C40 will connect PoCo with Coquitlam Station, instead of C38
  • Guildford portion of 97 will be replaced by a new FTN route
  • 153 will be wholly shuttle; C27 will always use std bus; 157, C24, C30 will be mixed. So much for the 'C' prefix...
If they want to send every 2nd 160 DT during peak, then they might as well edit the 190 to do what 160 does now. I think it would be too confusing for 160 to have 2 distant geographic locations during peak hours.
     
     
  #8708  
Old Posted Aug 18, 2015, 5:57 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,103
Quote:
Originally Posted by ninjakafi_81 View Post
Where does it say that the 151 will be using articulated buses during the peak hours. I've read through the document a couple of times and didn't see anything mentioning about that. Also, I think it would of been better of if the " new " 151 went along Mariner Way, mimicking the 143, instead of going along Spuraway Ave. Then the 152 will go along Spuraway Ave instead to cover those areas.
Its in Appendix C.

Yeah it would be weird to have articulated bus going down Spuraway as its narrow and curvy. Mariner is a much better suited for articulated bus.

Quote:
Originally Posted by Express691 View Post
If they want to send every 2nd 160 DT during peak, then they might as well edit the 190 to do what 160 does now. I think it would be too confusing for 160 to have 2 distant geographic locations during peak hours.
Maybe they'll just have the 160 change to a '10 Downtown' at Kootenay Loop.
     
     
  #8709  
Old Posted Aug 18, 2015, 6:51 PM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
If the 160 is going to head downtown, I'm very sure that they will keep it as express to/from Port Moody. Otherwise the 160 buses to/from downtown will just fall behind schedule owing to both a surge in demand and lack of traffic capacity, and this will cause the local buses to bunch up and get overcrowded.

In any case, I think that all the talk of keeping the 160 to/from downtown is premature. Despite all the criticism from the community, TransLink knows very well that keeping an hourly 160 Downtown service during peak hours will just duplicate and slow down local bus service while wasting money that could be better spent elsewhere. In fact, I predict that it will disappear during one of the service optimizations sometime within the next 5 years.
     
     
  #8710  
Old Posted Aug 18, 2015, 7:33 PM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 768
Still absolutely no mention of the 791, neither to say that it's staying in service nor to say that it's being discontinued
     
     
  #8711  
Old Posted Aug 18, 2015, 8:06 PM
ninjakafi_81 ninjakafi_81 is offline
Registered User
 
Join Date: Nov 2011
Location: Vancouver, BC
Posts: 342
Quote:
Originally Posted by nname View Post
Its in Appendix C.

Yeah it would be weird to have articulated bus going down Spuraway as its narrow and curvy. Mariner is a much better suited for articulated bus.
Thanks for that document and exactly ! It'll be like putting articulated buses on a community shuttle route, it just doesn't seem too right to be honest.
     
     
  #8712  
Old Posted Aug 18, 2015, 9:27 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
Quote:
Originally Posted by ninjakafi_81 View Post
I'm not sure how times I've mentioned this, but I really think Translink should get rid of the C prefixes once and for all. You got shuttles buses operating on conventional prefixed routes and vise versa. To makes things simple for everyone, they should just revert all the C prefix routes back to their original route numbers and if they were a new community shuttle route, give them a new route number.
I know they've talked about doing that - how long it will take them to do it... ?
     
     
  #8713  
Old Posted Aug 19, 2015, 4:23 AM
ninjakafi_81 ninjakafi_81 is offline
Registered User
 
Join Date: Nov 2011
Location: Vancouver, BC
Posts: 342
Quote:
Originally Posted by Sheba View Post
I know they've talked about doing that - how long it will take them to do it... ?
Well knowing Translink, probably within the next couple of decades XD


Also, I spotted 011 - 012 at the new platform at Lougheed Stn this evening.

     
     
  #8714  
Old Posted Aug 21, 2015, 1:19 PM
Ridgerunner Ridgerunner is offline
BANNED
 
Join Date: Dec 2014
Posts: 144
it is getting to be "late august"

A long while back, in a galaxy far far away, we had a discussion about how things on the TBM were going to restart in "late July" after the miss on the early July restart date.

It is getting to be late August. Some people were speaking with great authority about how "August was going to be the start".

Perhaps my glasses are too spotted to see clearly .. has anyone seen or heard anything about this"late august start of the TBM".

It is getting to be time for people to start telling us all that "late September" is for sure.
     
     
  #8715  
Old Posted Aug 21, 2015, 4:37 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is online now
Registered User
 
Join Date: May 2010
Posts: 4,799
Quote:
Originally Posted by Ridgerunner View Post
A long while back, in a galaxy far far away, we had a discussion about how things on the TBM were going to restart in "late July" after the miss on the early July restart date.
What do you do, put these things on your calendar specifically so you can gloat? There are a lot more rewarding things you can do in life. Just sayin'...
     
     
  #8716  
Old Posted Aug 21, 2015, 5:13 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,691
Maybe they found a bunch of treasure and they are bringing it out slowly.

Or, proof of aliens! That would be sweet.

Or, they ran into a secret oil pipeline that is being built while the public is being fooled over Enbridge and TransMountain projects.

Last edited by WarrenC12; Aug 21, 2015 at 5:52 PM.
     
     
  #8717  
Old Posted Aug 21, 2015, 5:38 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
     
     
  #8718  
Old Posted Aug 22, 2015, 3:05 AM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Maybe they will start Monday? Please hold your breath until then.
     
     
  #8719  
Old Posted Aug 22, 2015, 9:43 AM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
The discussion in this thread has degenerated into something along the lines of "how concrete jersey barriers must look for the PMH1 project"...
     
     
  #8720  
Old Posted Aug 22, 2015, 11:36 PM
Olden Retreiver Olden Retreiver is offline
Registered User
 
Join Date: Nov 2013
Posts: 263
Quote:
Originally Posted by allan_kuan View Post
The discussion in this thread has degenerated into something along the lines of "how concrete jersey barriers must look for the PMH1 project"...
Now that you mention it, the concrete Jersey barriers on the Evergreen Line, along Clarke Street in Port Moody, are really ugly.
__________________
Confidence is that uplifting feeling you have immediately before you fully comprehend the situation.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 2:29 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.