HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Aug 20, 2015, 11:19 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is online now
Registered User
 
Join Date: May 2010
Posts: 4,790
Quote:
Originally Posted by BCPhil View Post
I think the biggest slow down is in the signalling. I have no idea how long the signal block are, but they seem pretty long. So a train could be waiting at a signal for a train to clear a block that could be miles away. I've seen the Cascades stopped waiting at the entrance to the Grandview Cut after just leaving Pacific Central for a train that was probably in Burnaby crossing the mainline into the tunnel to the North Shore.
The signal block that starts at the CN Junction (at the west end of the Grandview Cut) runs through the Cut to Slocan Street on the east end, where there is another set of signals and the switch for the beginning of double-tracking. That block and the others between there and the New Westminster bridge are not IMHO particularly long - some of them are probably shorter than some of the freight consists that go through there.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:25 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.