Quote:
Originally Posted by urbanlife
It is amazing how much wider this new bridge will be.
|
The Adams administration required that it had to be able to carry streetcars in the future. I think those features were mostly built in to the project. I know they were part of the Tacoma Street plan in the late 90's, and I think Sam won that battle with Multnomah County.
Not all the infrastructure is being built now, but the basics will be there so a SoWa extension to Sellwood/Tacoma Street will be more possible in the future. I think this was built in as it became clear Lake Oswego was going to say nope to a MAX line.
The planned routing of the 99X next month via Tacoma to Macadam over the new bridge might be enough for now.