Quote:
Originally Posted by lrt's friend
Another practical issue if they rebuilt SRT as a subway extension; How would service be delivered during an extended rebuilding period? By relocating the subway extension as proposed, the SRT can continue to operate until the subway extension is completed.
|
I think back when Toronto was planning to rebuild the SRT as an LRT, the plan was for a massive army of bus replacement shuttles. The operating costs would have probably been huge.
I'm still on the fence about the Scarb subway (not being fully familiar with the Toronto planning saga doesn't help)... it really looks like with GO electrification now part of the plan, a subway along McCowan looks kinda redundant, but Scarborough Centre isn't on the GO line and that's a huge traffic generator & regional node, so some sort of rapid transit to serve it is important.
Maybe a rebuild of the SRT using current SkyTrain technology would have been better? It would connect with 3 transit services at Kennedy (GO electrification, Eglinton line, Bloor-Danforth line), rendering it more suited for a transfer than the current setup (where it's literally only ever a one direction transfer!)
The construction impacts could be mitigated by waiting until after GO electrification & the Eglinton line are complete to provide some alternate options.