Since they extended their opening deadline they are moving at a slower pace, I think they over estimated how far behind they were by quit a bit and now have to make sure they dont open sooner.
Reply With Quote
     
     
  #4402  
Old Posted Jul 5, 2015, 2:01 AM
terrynorthend terrynorthend is offline
Registered User
 
Join Date: Feb 2007
Posts: 1,215
Quote:
Originally Posted by Hali87 View Post
I'm guessing the site presents a lot more constraints than the average construction project.
Its also a fairly more involved project/site. Lots of work to do on the podium and base areas rather than being able to simply concentrate the majority of resources on a tower?
Reply With Quote
     
     
  #4403  
Old Posted Jul 5, 2015, 2:31 PM
RangerNS RangerNS is offline
Registered User
 
Join Date: Jan 2015
Posts: 45
Quote:
Originally Posted by hokus83 View Post
Since they extended their opening deadline they are moving at a slower pace, I think they over estimated how far behind they were by quit a bit and now have to make sure they dont open sooner.
The past few floors of the hotel haven't been easy, with different height floors/ceilings for the docks; the office side there is special stuff to do as the are at some roof lines. And the cranes have to be a critical path.

But with this weather, I'm a little surprised there isn't a half-crew working late into the evening.
Reply With Quote
     
     
  #4404  
Old Posted Jul 7, 2015, 3:21 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by RangerNS View Post
The past few floors of the hotel haven't been easy, with different height floors/ceilings for the docks; the office side there is special stuff to do as the are at some roof lines. And the cranes have to be a critical path.

But with this weather, I'm a little surprised there isn't a half-crew working late into the evening.

I check the webcams for the Maple and Nova Centre fairly often and the workers at the Maple are there earlier and seem to work later.

The concrete work is more complicated that normal so I can understand it taking longer than other projects but the rate at which the steelworkers are installing the steel decking seems painfully slow.
Reply With Quote
     
     
  #4405  
Old Posted Jul 7, 2015, 10:17 PM
Jonovision's Avatar
Jonovision Jonovision is offline
Registered User
 
Join Date: Sep 2003
Posts: 5,052
Part of Grafton was closed off yesterday to do some steel work.



Reply With Quote
     
     
  #4406  
Old Posted Jul 8, 2015, 12:53 PM
RangerNS RangerNS is offline
Registered User
 
Join Date: Jan 2015
Posts: 45
Quote:
Originally Posted by Jonovision View Post
Part of Grafton was closed off yesterday to do some steel work.

.... And will be for 3 weeks. Looks to me like they are assembling the roof trusses on site, standing them up in the fork-like stands assembled yesterday.
Reply With Quote
     
     
  #4407  
Old Posted Jul 8, 2015, 9:49 PM
Jonovision's Avatar
Jonovision Jonovision is offline
Registered User
 
Join Date: Sep 2003
Posts: 5,052
Roof trusses appear to come pre assembled.

Reply With Quote
     
     
  #4408  
Old Posted Jul 9, 2015, 11:57 AM
RangerNS RangerNS is offline
Registered User
 
Join Date: Jan 2015
Posts: 45
[QUOTE=Jonovision;7088920]Roof trusses appear to come pre assembled.

3 pieces. "T16C" written on the top piece on the trailer in the right of your picture would seem to confirm the theory of 16 trusses, 3 pieces each.
Reply With Quote
     
     
  #4409  
Old Posted Jul 9, 2015, 4:54 PM
ns_kid's Avatar
ns_kid ns_kid is offline
Registered User
 
Join Date: Sep 2013
Posts: 549
Quote:
Originally Posted by RangerNS View Post
The past few floors of the hotel haven't been easy, with different height floors/ceilings for the docks; the office side there is special stuff to do as the are at some roof lines. And the cranes have to be a critical path.

But with this weather, I'm a little surprised there isn't a half-crew working late into the evening.
Developer Joe Ramia is quoted today as saying the Nova Centre is still on track for its September 2016 opening. According to ANS, construction was set back by the harsh winter, including significant snow clearing after every one of the massive dumps we endured.

Ramia celebrated topping out of the seven-storey Argyle Street pedestal last week. It was the most complicated part of the project, but Ramia says the towers should go much quicker as each floor from here on is basically a duplicate of the one before.

He says the workers are labouring through the weekends and putting in long days to stay on track.
Reply With Quote
     
     
  #4410  
Old Posted Jul 9, 2015, 6:35 PM
beyeas beyeas is offline
Fizzix geek
 
Join Date: Aug 2007
Location: South End, Hali
Posts: 1,318
Quote:
Originally Posted by ns_kid View Post
Developer Joe Ramia is quoted today as saying the Nova Centre is still on track for its September 2016 opening.
That fits with what I was told a month or two ago by TCL, that they are planning a soft opening Fall 2016 and first conferences already hard booked for early 2017.
Reply With Quote
     
     
  #4411  
Old Posted Jul 9, 2015, 6:58 PM
musicman musicman is offline
Registered User
 
Join Date: Nov 2008
Posts: 270
They will be able to get up to speed with the new building after their soft opening by doing mostly local work... IE corporate christmas parties, fundraisers ect.
Reply With Quote
     
     
  #4412  
Old Posted Jul 15, 2015, 10:47 PM
Jonovision's Avatar
Jonovision Jonovision is offline
Registered User
 
Join Date: Sep 2003
Posts: 5,052
Starting to take on a new form with the tower rising and the roof going in.





Reply With Quote
     
     
  #4413  
Old Posted Jul 18, 2015, 5:48 PM
someone123's Avatar
someone123 someone123 is offline
hähnchenbrüstfiletstüc
 
Join Date: Nov 2001
Location: Vancouver
Posts: 35,870
Here's a video about the interior:

Video Link
Reply With Quote
     
     
  #4414  
Old Posted Jul 18, 2015, 8:00 PM
Jstaleness's Avatar
Jstaleness Jstaleness is offline
Jelly Bean Sandwich
 
Join Date: Apr 2009
Location: Dartmouth
Posts: 1,772
^^^ I like what I see for ideas.
__________________
I can't hear you with my eyes closed
Reply With Quote
     
     
  #4415  
Old Posted Jul 18, 2015, 10:02 PM
counterfactual counterfactual is offline
Registered User
 
Join Date: Jul 2013
Location: Parts Unknown
Posts: 1,796
Quote:
Originally Posted by someone123 View Post
Here's a video about the interior:

Video Link
This looks great! Really thoughtful designing, like the Library.
Reply With Quote
     
     
  #4416  
Old Posted Jul 19, 2015, 3:08 PM
Keith P.'s Avatar
Keith P. Keith P. is offline
Registered User
 
Join Date: Mar 2006
Posts: 8,848
Quote:
Originally Posted by counterfactual View Post
This looks great! Really thoughtful designing, like the Library.
No Killer Stairs (TM Regd.), I hope.
Reply With Quote
     
     
  #4417  
Old Posted Jul 19, 2015, 6:32 PM
counterfactual counterfactual is offline
Registered User
 
Join Date: Jul 2013
Location: Parts Unknown
Posts: 1,796
Quote:
Originally Posted by Keith P. View Post
No Killer Stairs (TM Regd.), I hope.
Ha, ha. None.
Reply With Quote
     
     
  #4418  
Old Posted Jul 20, 2015, 3:56 PM
bluenoser's Avatar
bluenoser bluenoser is offline
hi
 
Join Date: Mar 2006
Posts: 630
I'm impressed - it looks more interesting and classy than I was expecting.

By the way, the construction webcam is now a live video feed with audio http://www.novascotiawebcams.com/en/webcams/nova-centre/

Also, as always, thanks for the photos Jonovision and Ziobrop (on your blog).
Reply With Quote
     
     
  #4419  
Old Posted Jul 22, 2015, 12:36 AM
eastcoastal eastcoastal is offline
Registered User
 
Join Date: Mar 2009
Posts: 1,409
Quote:
Originally Posted by Keith P. View Post
No Killer Stairs (TM Regd.), I hope.
Not sure what the criteria for killer status is, but I did see some elements that looked stair like
Reply With Quote
     
     
  #4420  
Old Posted Jul 23, 2015, 6:52 PM
beyeas beyeas is offline
Fizzix geek
 
Join Date: Aug 2007
Location: South End, Hali
Posts: 1,318
Was meeting with people from TCL today... the plan is substantial completion (95%) September 2016, at which point they get handed the keys and can begin to move in while deficiencies etc are dealt with. First conferences are for January 2017, but these are smaller local ones that will let them get their feet wet. A commercial real estate firm has been hired, and the existing trade centre space will be tested on the market to see if there is any interest. If not (and I would be surprised if there was), it will go to the city, with one option that is being explored is whether the Metro Centre could be expanded into the space.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth
Forum Jump



Forum Jump


All times are GMT. The time now is 4:21 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.