Quote:
Originally Posted by dpogue
I heard that when the motor burned out it partially melted one of the train control cables on either side of the centre rail, which would cause a communication loss with the trains.
However that still should have only caused trains in a roughly 1km area to time out, so I'm not sure what happened to the rest of the line.
|
These weren't the guideway ATC cables, actually. The nest was on a cable rack supplying all sorts of different communication cables, running alongside the guideway. The reference pictures on Twitter/etc showing the repairmen working on the cable box show this.
Quote:
|
Originally Posted by WarrenC12
Canada Line had a fire at some point in the last several months and it was a minor issue that was quickly resolved.
|
That fire at Aberdeen was no "minor issue". In fact it shut down service on the entire Richmond branch for over 3 hours (longer than Tuesday's incident).
Quote:
|
Originally Posted by logicbomb
That's the million dollar question right now. Why did a burnt-out linear induction motor completely shut down communications on such a large portion of the line? That's the thing about Translink. They provide us with an answer that spurs on dozens of more questions. Will this occur the next time a train craps out? Is dated technology to blame? How can we ensure that this incidents like this, and previous incidents do not occur again? What occurs when a shutdown finally results in a death?
|
As far as I understand a lot of this ends up coming down to safety, especially with many trains running close together. Considering the visible, serious-looking damage to the pictured LIM I wouldn't be surprised if the system did this automatically as a measure of safety (I was following the accounts on Twitter and some were reporting that trains emergency-braked to a halt). Since we didn't take that 1990s upgrade described in the SkyTrain review, the "timed out" trains would have to be re-entered manually and that contributes largely to the length of the delay.
The other thing however is that the doors were pried open on 3 separate SkyTrain cars, so obvs. you can't start running again that quickly. We know the problem train itself was located at Nanaimo Station, so theoretically you could've had trains running again earlier between Waterfront/Commercial-Broadway, switching west Nanaimo. Same with the Joyce-Edmonds section. So depending on where the doors-opened incidents were, that may have been a contribution to the continuation of the delay west of Commercial-Broadway and east of Joyce.
Quote:
|
A Broadway extension would have meant people could still make it to Surrey on the train via Canada-Millennium-Expo.
|
Very good point. Truly, we could deal with a lot of these issues better with the transit investment needed in this region. I would think though that for an alternative to Metrotown, most people would take a bus/B-Line from Brentwood (shorter).
**************
Anyway, if anyone wasn't paying attention, #SkyTrain and the new hashtag #SkyHostage have both been trending pretty big all the way in Toronto - and that's because the entire subway there had a 95-minute shutdown just this Monday (worse yet, TTC didn't deploy a single replacement bus). Clearly these types of issues aren't exclusive to our system, even though the issue was with a LIM.
http://news.nationalpost.com/toronto/ent...down-all-four-lines-no-replacement-buses