Quote:
Originally Posted by Colin May
All good points.
I don't know how the process works but if we take a logical approach wouldn't we expect the entity issuing a building permit to have a lengthy list of questions regarding the companies involved in the construction of a project and the legal registration of all such entities. I assume the Building Code covers the essential elements of the whole process, note:
1.4.1.3. Required Information
2.1 2.1 Obligations of Owner
http://www.novascotia.ca/JUST/REGULATIONS/regs/bcregs.htm
|
I only have one experience with the permit process in a municipality in Ontario. In that case, the general contractor employed a professional engineer to do all the drawings that were submitted to the municipality. However, the general contractor submitted the plans to the municipality and would have provided his contact information. So perhaps you are right.
As indicated in 1.4.1.3, it would depend on who is responsible for monitoring the work, whether it is a home owner doing the work himself, an engineering firm overseeing the work, or a general contractor who is overseeing the work. For many large construction projects, an engineering firm is employed and they are legally responsible for the work that is performed.