Quote:
Originally Posted by gunnar777
^^I'm glad you asked. What I have seen outside of Toronto is that when one system goes down, others are modified to help pick up the slack. As GO owns enough corridor to run unimpeded weekend trains from Union/Exhibition to all interchanges, except for Kipling, on the Bloor-Danforth, Sheppard and SRT lines, why not consider that option? It will not replace the Yonge line downtown, but it will be much better than transferring to buses on clogged streets. I can already imagine that the same small minds would waste time poring over the cost of diesel or how it would be impossible to have Metrolinx pick up the slack for the TTC. But I would ask them why, then, does everywhere else seem to just suck it up?
|
I think you are taking a "grass is greener" approach. Yes things could be much better in Toronto, but it's not like in every other city things run smooth, or get done on time. Without looking at Europe or Asia (as we tend to do) the experiences of the CTA and MTA facing repairs, slow-zones and inability to get almost anything new built are telling.
The proposal you are describing sounds very much like GO RER and Tory's Smarttrack, at least in the long run. RER was featured prominently in the Ontario 2015 Budget and planning is well underway. Of course it's not as simple as just throwing more trains on the tracks.
As to using GO to replace subway service on weekends that does sound a bit more unfeasible. As you are aware, it's only portions of the Yonge line that are getting shut down for repairs on weekends, not the rest of the subway. There are no GO corridors that could effectively serve this with any reliability. There is however another subway a short bus ride to the west that has more than enough capacity to pick up the slack. Unless you are talking about using GO to replace the entire system on the once in a decade instance it goes down for less than 90 minutes due to a freak accident.
Quote:
Originally Posted by gunnar777
And I respect your response - I realize that the city is playing catch-up, but honestly "studies" for expansion? They've been done, many, many, many times over. And it's not an excuse at this point, when there continue to be many city councillors, urban planners, nimbys, and a recent ex-mayor, who to this day put the brakes on progress. There are enough of them to fairly represent the general population after all.
|
Quote:
Originally Posted by gunnar777
Good point, but obviously, the vast majority of other similar-sized cities have found a way to overcome this obsolescence problem and forged ahead. How do you propose Toronto do the same?
|
Again, grass is greener. We see the final product, but we rarely see all that these cities have gone through to get there. How long has the 2nd ave subway in NYC been on the drawing board? I don't really have that answer but from what I recall it has been decades.
For things like the DRL we do need new studies as what was done previously wasn't extensive and doesn't match with the current realities of transit operation. FWIW this continues to be a priority of the TTC and City Planning - they just released an analysis of potential stop locations this week. The next step is to identify the preferred corridor.