  #2221  
Old Posted Jun 12, 2015, 1:55 AM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
Quote:
Originally Posted by Mr.Flintstone View Post
I've already ask my job not to schedule me early in the morning that week.

Is june 27th the last time the 95 will be going the the full transitway
Partially correct, but the 95 has the fewest skipped stations of any route (only Train, which is only served by the 92 and 96 along Tremblay, and Cyrville which will be closed completely).
     
     
  #2222  
Old Posted Jun 12, 2015, 3:41 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
Cyrville station is being closed?! What about the 487 identical overpriced gaudy condo buildings that were planned at Place des Gouverneurs?!
     
     
  #2223  
Old Posted Jun 12, 2015, 4:40 AM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,806
Quote:
First section of O-Train Confederation Line track to be installed

June 11, 2015


Media Advisory


Ottawa – Royal Galipeau, MP for Ottawa–Orléans, the Honourable Bob Chiarelli, MPP for Ottawa West–Nepean, and Mayor Jim Watson will lay the first official rail track of the O-Train Confederation Line light rail transit project and showcase the Belfast Yard maintenance and storage facility.

Date: Friday, June 12

Time: 12:45 p.m.

Location: Belfast Yard, 805 Belfast Road

Parking: There is no parking at Belfast Yard. A shuttle will depart City Hall (110 Laurier Avenue West, Lisgar Street entrance) at 12:15 p.m. sharp, and will return to City Hall at 2 p.m.

Personal protective equipment is required to be on site, including a hard hat, steel-toed boots, a safety vest, safety goggles, long pants and a long-sleeve shirt.
http://ottawa.ca/en/news/first-section-o-train-confederation-line-track-be-installed
     
     
  #2224  
Old Posted Jun 12, 2015, 11:06 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
I presume this means train assembly is going to start up soon too. Exciting!

Sidenote: Why is it always Galipeau who represents the feds at transit events, instead of someone more
meaningful like Pollievre?
     
     
  #2225  
Old Posted Jun 12, 2015, 3:01 PM
MoreTrains MoreTrains is offline
Registered User
 
Join Date: Oct 2014
Posts: 858
Quote:
Originally Posted by 1overcosc View Post
I presume this means train assembly is going to start up soon too. Exciting!

Sidenote: Why is it always Galipeau who represents the feds at transit events, instead of someone more
meaningful like Pollievre?
Because he is less controversial. And Pierre is just a 🞵🞵🞵🞵, would you really want him there to tout how his government will lower taxes while funding the 'largest' infrastructure plan in Canada's history... funding starting in 2017.
     
     
  #2226  
Old Posted Jun 12, 2015, 9:12 PM
Mikeed Mikeed is offline
Registered User
 
Join Date: Jun 2013
Posts: 377
Does anyone know who is doing the track laying? I believe it will be Ellisdon.

Being a Track Labourer for a Class 1 railroad in Canada is really hard work, but it pays will. I've been keeping an eye out to see if they're hiring track layers for the guideway.
__________________
Long time reader.
Seldom post.
     
     
  #2227  
Old Posted Jun 13, 2015, 2:33 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,672
The first spike: Confederation line track construction begins

Matthew Pearson, Ottawa Citizen
Published on: June 12, 2015, Last Updated: June 12, 2015 6:19 PM EDT


The clanging of sledgehammers on steel spikes rang out Friday as Mayor Jim Watson and area politicians helped lay the first section of track for the $2.1-billion Confederation line.

The short section of rail at the new Belfast Yard storage and maintenance facility will eventually be connected to the 12.5-kilometre line, which will run from Tunney’s Pasture in the west to Blair station in the east.

“It was a very proud moment,” the mayor said afterward. “An event like this at least shows there is light at the end of the tunnel and there is a train coming. It will be tested in 2017 and ready for customer service for 2018.”

Belfast Yard buzzed with construction activity, as the large warehouse containing light- and heavy-maintenance bays is to be finished by summer’s end.

The facility will then be used to assemble the 34 Alstom Citadis light rail vehicles and is expected to create up to 100 jobs, Watson said.

Friday’s milestone sets the stage for the Transitway to be converted to light rail, starting this summer (the eastern leg between Hurdman and Blair closes June 28).

It also means more headaches for residents and commuters as traffic congestion and construction will become a way of life for the next several years.

“It is going to be very challenging, there’s no question about that,” Watson said. “This is a classic example of short-term pain for long-term gain.

Transit service along the eastern section of the Transitway will be relocated to new bus lanes on Regional Road 174, Highway 417, and other parallel corridors, lengthening some trips by as long as 16 minutes.

Closures on the western leg of the Transitway aren’t expected until later this year.

[email protected]
twitter.com/mpearson78

http://ottawacitizen.com/news/local-news...ederation-line-track-construction-begins
     
     
  #2228  
Old Posted Jun 17, 2015, 3:35 PM
GoTrans GoTrans is offline
Registered User
 
Join Date: Jan 2010
Posts: 695
Quote:
Originally Posted by Mikeed View Post
Does anyone know who is doing the track laying? I believe it will be Ellisdon.

Being a Track Labourer for a Class 1 railroad in Canada is really hard work, but it pays will. I've been keeping an eye out to see if they're hiring track layers for the guideway.
The company laying the track is VIAS which is part of the Spanish construction conglomerate Grupo ACS / Dragados S.A.. This company is part of the Rideau Transit Group consortium. They did have some jobs listed on the Indeed web site, mostly for machine operators. It is very difficult to find out who to talk to concerning jobs as I have found out.
     
     
  #2229  
Old Posted Jun 17, 2015, 5:20 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,672
In related news:

Quote:
Wind Mobile to bring cell service to Toronto’s subway system

CHRISTINE DOBBY - TELECOM REPORTER
The Globe and Mail
Published Wednesday, Jun. 17, 2015 10:45AM EDT, Last updated Wednesday, Jun. 17, 2015 12:57PM EDT



Wind Mobile Corp. has struck an exclusive deal to bring cellular service to its customers who use Toronto’s underground subway.

The wireless carrier ?announced the move during a press conference with the city’s mayor, John Tory, at a downtown Toronto subway station Wednesday morning.

?The company is working with BAI Canada, which holds a contract from the Toronto Transit Commission (TTC) to implement cellphone and WiFi coverage in the subway system.

Yet, to date, BAI has only deployed WiFi service at a number of downtown subway stations, leaving many transit riders frustrated that they cannot use cellular service to make calls and send text messages during their commutes.

Wind said it has set up infrastructure to deploy cellphone service on the platforms of 18 stations in the downtown lower loop of the Toronto subway system.

The carrier said the cell service was live on Wednesday at three of those 18 stations – St. George, Bay and Bloor-Yonge – and additional stations would come on line during this summer's Pan Am Games.

Mr. Tory said Wind has signed on to be the first cellular carrier to offer its customers cell service on underground parts of the subway.

The mayor said any carrier can sign on to offer its customers service and TTC Chair Josh Colle said he hopes the move will put pressure on others to sign on.

Wind serves only a small number of customers compared to the dominant carriers, Rogers Communications Inc., Telus Corp. and BCE Inc. (BCE owns 15 per cent of The Globe and Mail.) In December, the company had 800,000 customers in Ontario, B.C. and Alberta, while the Big Three together serve more than 25 million wireless subscribers nationwide.

But Wind CEO Alek Krstajic said in an interview that his company negotiated the right to be the exclusive cellular provider for the TTC for one year. He added that other carriers could negotiate the right to roam on Wind’s network if they want to offer their customers service sooner.

“Rogers, Bell and Telus could have come on some time ago, but they chose not to. Full stop,” Mr. Krstajic said at the press conference.

He predicted that the competition from Wind would force the other three to make a move soon too.

BAI won a contract from the TTC in December, 2012, to implement cellphone and WiFi coverage in the subway system. The company is paying the transit authority $25-million for the 20-year deal and brings in revenue through ads displayed to users before they connect.

The contract with the TTC stipulated that BAI build a network that would allow for both WiFi and cellular coverage. Over the past few years, BAI has been deploying WiFi services at an increasing number of downtown subway stations, but it was unable to secure an agreement regarding wireless coverage with the Big Three cellular providers.

In April, BAI said it had activated free WiFi service at all subway stations in the “lower loop” of the Yonge-University-Spadina line, which is also known as Line 1, from Bloor to Union to St. George.

Riders still will not have either WiFi or cellular coverage throughout the subway tunnels, which will eventually be added as BAI expands its network over the next few years.

BAI is part of the Broadcast Australia group of companies but is 100 per cent owned by Canadian pension funds. BAI Canada’s sister companies have implemented wireless services for transit systems in cities such as Hong Kong, New York and Singapore.

In Montreal, the Big Three wireless providers along with Videotron Ltd. – which is the fourth largest carrier in Quebec – announced a partnership with the Societé de transport de Montréal (STM) in November, 2014, with plans to bring cellular service to the city’s underground subway line in five phases over five to seven years.

In that case, the four telecom players said they were equally sharing the cost of a $50-million investment to deploy the wireless network while Telus was responsible for the actual implementation.

Telus also launched a pilot project last summer testing free public WiFi on three Vancouver bus routes.

http://www.theglobeandmail.com/report-on...-torontos-subway-system/article24997517/
     
     
  #2230  
Old Posted Jun 18, 2015, 12:29 AM
MaxHeadroom's Avatar
MaxHeadroom MaxHeadroom is offline
Registered User
 
Join Date: Oct 2009
Posts: 189
Quote:
Originally Posted by GoTrans View Post
It is very difficult to find out who to talk to concerning jobs as I have found out.
Go pounding on the door at 1600 Carling, 4th floor. That is where the project office is located.
     
     
  #2231  
Old Posted Jun 18, 2015, 1:29 PM
GoTrans GoTrans is offline
Registered User
 
Join Date: Jan 2010
Posts: 695
Quote:
Originally Posted by MaxHeadroom View Post
Go pounding on the door at 1600 Carling, 4th floor. That is where the project office is located.
Already done that, to no avail.
     
     
  #2232  
Old Posted Jun 18, 2015, 1:38 PM
hwy418 hwy418 is offline
Registered User
 
Join Date: Jun 2013
Posts: 410
Quote:
Originally Posted by GoTrans View Post
Already done that, to no avail.
The Carling office is the Engineering / OLRT construction management location - you won't find any sub-contractors there.

I would approach local contractors such Tomlinson, Taggart, etc. since RTG is using these guys to carry out most of the construction work. There are specialist contractors doing the tunnelling, track and signaling work, but they usually bring in a relatively small group of workers and then hire/train local labour.
     
     
  #2233  
Old Posted Jun 19, 2015, 1:01 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,672
Construction Update
Week of June 15




Albert Street multi-use pathway reopens

Albert Street Civic Works


The Albert Street multi-use pathway reopens months ahead of schedule! Traffic ‘switch’ to the north-side of Albert between Preston and Booth allowing for utility and sewer works to continue. LeBreton Flats Diversion Chamber construction is progressing.



Booth Street Bridge pier construction

Booth Street Bridge


Abutment excavation is ongoing and concrete pouring occurs at the Booth Street Bridge piers.



Arch waterproofing in Lyon Station running tunnel

Lyon Station Cavern


In the station cavern Jawbreaker is excavating the central pillar and upper drift, and umbrella installation is ongoing. In the running tunnel, final lining works such as waterproofing and rebar, and formwork installation occur. Pouring of starter wall continues.



Place de Ville concourse demolition works

Lyon Station East Entrance


Structural demolition continues on the concourse level and begins in the Place de Ville parking garage.



Parliament Station reinforcement works

Parliament Station Cavern


Chewrocka continues to excavate in upper drifts and the central pillar. Umbrella installation occurs.



Rideau Station bench excavation

Rideau Station Cavern


Crocodile Rouge is excavating Rideau Station cavern. Rock bolt installation, and shotcreting occurs.



Guideway excavation at Hurdman Station

Hurdman Station


Crews continue construction of columns and piers for the elevated guideway. Other works include excavation, formwork and falsework. Intermittent closures and flagging of the pathway continue.



Granular placement at Blair Station bus loop

Blair Station


Construction of the bus loop is ongoing and includes electrical work, drainage and granular placement.



Sidewalk and road widening on Pickering Place detour

Tremblay Station


Road widening works such as excavation and sidewalk construction continue on Pickering Place. A detour via Pickering Place will be used during construction of the guideway and future Tremblay Station.



Rail support in sanding area at Belfast Yard

Belfast Yard Administration and Maintenance Building


Architectural, mechanical and electrical finishes continue on the second level. Commissioning activities have commenced and exterior cladding is being completed.



Yard works at Belfast Yard

Belfast Yard Vehicle Storage Shed and Yard Works


Crews advance fencing works in the yard and begin a section north of the shed. Panel installations are almost complete and track welding occurs in the yard. Duct bank installation from the yard to the connector begins this week, and landscaping works continue.



Belfast Yard connector

Belfast Yard Connector


Crews continue backfilling along the connector. Other works include concrete placement and electrical. Realignment works progress for the next phase of the road detour. Intermittent short-term flagging is ongoing on the pathway.



Preparations for paving median lane on Highway 417

Highway 417


Sewer and watermain relocations progress and include paving along Nicholas Street. Crews continue wiring, paving, backfilling, completing ground mounted sign installations, and removing quick moveable barriers and replacing them with barrels. In addition, site clean-up begins. Construction of the St Laurent Station temporary ramp to Highway 417 westbound will be completed this week.



Final works on Hurdman Bridge

Hurdman Bridge (Highway 417 over Rideau River)


Crews complete final bridge works this week. Intermittent flagging and short duration closures are ongoing along the Rideau River east and west multi-use pathways.



Bus lay-by mobilization at Vanier Parkway staging area

Vanier Parkway Overpass


Crews continue final works including paving, ramps and curbs. Mobilization, excavation and grading occur at the Vanier Parkway staging area, to allow conversion to a bus lay-by area, which will be used by OC Transpo buses.



Waterproofing and paving final works on Belfast Bridge

Belfast Bridge


Crews complete final site clean-ups; the bridge is scheduled to reopen to pedestrians and cyclists the week of June 22, 2015.



Upcoming Construction Activities

In the coming weeks, the following construction activities are scheduled:
  • Preparatory Scott Street widening works from Tunney’s Pasture to Bayview Road.
  • Lyon Station west entrance preparatory works, including watermain and sewer work on Queen Street.
  • Lyon Station east entrance excavation.
  • Utilities relocation for Rideau Station entrances along Rideau Street.

Additional construction activities scheduled this summer include:
  • Excavation and shoring at the future site of the Rideau Station east entrance.
  • Hurdman Station substructure and foundation work.
  • Hurdman Station temporary bus loop construction.
  • Station and guideway construction at Tremblay, St-Laurent, Cyrville and Blair stations.
  • Demolition of the building at 805 Belfast Road.

http://www.ligneconfederationline.ca/construction/construction-update-27/
     
     
  #2234  
Old Posted Jun 20, 2015, 1:05 AM
emannigol emannigol is offline
Registered User
 
Join Date: Jan 2014
Posts: 35
These updates are not so up-to-date.
They're much further along on the new elevated booth street than the update shows.

     
     
  #2235  
Old Posted Jun 20, 2015, 1:30 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
^ The updates have typically been several weeks behind the actual construction pretty consistently since the project began.

Perhaps the city staff who write these updates can't keep pace with the speed and efficiency of RTG crews, lol.
     
     
  #2236  
Old Posted Jun 20, 2015, 2:26 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,090
Quote:
Originally Posted by 1overcosc View Post
^ The updates have typically been several weeks behind the actual construction pretty consistently since the project began.

Perhaps the city staff who write these updates can't keep pace with the speed and efficiency of RTG crews, lol.
It probably takes the comms team that long to get "approvals".
     
     
  #2237  
Old Posted Jun 20, 2015, 3:17 AM
CanadaGoose CanadaGoose is offline
Registered User
 
Join Date: Sep 2014
Posts: 260
They have a large map now set up at Mackenzie King station showing the new Transitway . Maybe, thats not enough.

Will post a photo when I get a chance soon.
     
     
  #2238  
Old Posted Jun 20, 2015, 1:42 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,672
     
     
  #2239  
Old Posted Jun 20, 2015, 7:30 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
They're also changing the system map as well. This is a big break from precedent, as normally the system map is only redone with the fall service changes in September.
     
     
  #2240  
Old Posted Jun 21, 2015, 3:32 AM
Cre47's Avatar
Cre47 Cre47 is offline
Awesome!
 
Join Date: Mar 2006
Location: Orleans, ON
Posts: 1,971
Considering that this year, there might be far fewer changes in the Fall schedule so they've done it right away.
__________________
"However, the Leafs have not won the Cup since 1967, giving them the longest-active Cup drought in the NHL, and thus are the only Original Six team that has not won the Cup since the 1967 NHL expansion." Favorite phrase on the Toronto Maple Leafs Wikipedia page.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 8:00 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.