  #341  
Old Posted Jun 9, 2015, 5:32 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,805
If you look at the map, the acceptable area is entirely based on the route of the Confederation Line rather than on the realities of people's lives who presently travel into the downtown core or live nearby. It is based on future development to the west of the area that I consider downtown and reduces the importance of serving areas where there is already extensive intensification to the east and south of the designated area.
Reply With Quote
     
     
  #342  
Old Posted Jun 9, 2015, 6:04 PM
MoreTrains MoreTrains is offline
Registered User
 
Join Date: Oct 2014
Posts: 858
Quote:
Originally Posted by lrt's friend View Post
If you look at the map, the acceptable area is entirely based on the route of the Confederation Line rather than on the realities of people's lives who presently travel into the downtown core or live nearby. It is based on future development to the west of the area that I consider downtown and reduces the importance of serving areas where there is already extensive intensification to the east and south of the designated area.
That is the cities version of the central core. However, given the theoretical intensity of development in Lebreton and Chaudiere the core will migrate west based on where people are living.

As has been previously stated by 1oversocs I believe that in the short term, the proposal is terrible; in the future this is a fantastic location. There really isnt a spot in the current core for a new library to be built and the only option would be a renovation. However, I believe that a renovation was ruled out as it wouldnt be economical.

If the city decided to tear down the current library and build a new one, there would not be a library for a few years, so the only real option is a relocation. Plus, this is only a proposal not the definite plan, so there will most likely be some public sessions before the plan is finalized.
Reply With Quote
     
     
  #343  
Old Posted Jun 9, 2015, 9:36 PM
silvergate's Avatar
silvergate silvergate is offline
Registered User
 
Join Date: Apr 2014
Location: Ottawa
Posts: 629
Seeing as how the current proposal is coming in a little small at 130k sqft for a central library, does anybody see the potential for a downtown east central library of comparable size being built down the line?
Reply With Quote
     
     
  #344  
Old Posted Jun 10, 2015, 2:19 AM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,878
Quote:
Originally Posted by MoreTrains View Post
That is the cities version of the central core. However, given the theoretical intensity of development in Lebreton and Chaudiere the core will migrate west based on where people are living.

As has been previously stated by 1oversocs I believe that in the short term, the proposal is terrible; in the future this is a fantastic location. There really isnt a spot in the current core for a new library to be built and the only option would be a renovation. However, I believe that a renovation was ruled out as it wouldnt be economical.

If the city decided to tear down the current library and build a new one, there would not be a library for a few years, so the only real option is a relocation. Plus, this is only a proposal not the definite plan, so there will most likely be some public sessions before the plan is finalized.
How far into the future? Even with a decade-long real estate boom, only a handful of condos have been built nearby. Yeah the area will be built out, but it will take a long time.

I think if the city wants access to the library to be primarily by lrt then they should consider options further along the line (say Hurdman) with a branch library downtown.
Reply With Quote
     
     
  #345  
Old Posted Jun 10, 2015, 12:02 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
Quote:
Originally Posted by lrt's friend View Post
..we want our NHL arena on Lebreton Flats..
Hurdman seems a much better place.
Reply With Quote
     
     
  #346  
Old Posted Jun 10, 2015, 2:08 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,805
Quote:
Originally Posted by eltodesukane View Post
Hurdman seems a much better place.
Hurdman will be great if our main interest is highway access but that location is likely to remain suburban in design forever. After all, look at the neighbouring Trainyards fiasco. What a missed opportunity. It is also completely cut off from the downtown area by the Queensway.

The great thing about Lebreton is that not only will it be urbanized but also the neighbouring Bayview and Windmill lands as well. In other words, there is potential to have a true 'Sens Mile' right next to the arena. It may take another 50 years, but it will happen.
Reply With Quote
     
     
  #347  
Old Posted Jun 10, 2015, 5:08 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,660
Board endorses plan for new central library but battle looms over where and how

Matthew Pearson, Ottawa Citizen
Published on: June 9, 2015, Last Updated: June 9, 2015 8:49 PM EDT


The campaign to build a new central library cleared another hurdle on Tuesday, but the fight over where to put it and how to build it continues.

Ottawa’s public library board endorsed a plan to construct a new $86 million central branch instead of renovating the current building on Metcalfe Street, which the board heard could cost the same amount.

Despite a consultant’s report that named a city-owned site west of Bronson as a preferred location, chair Tim Tierney reiterated several times during the meeting that there is, at this point, no actual preferred site.

There’s also no selected method for proceeding with the high-profile project, though the consultant’s report identified four other options for structuring the project, including the possibility of partnering with a private-sector consortium to design and build the new facility on land either owned by the city or by the developer.

Mayor Jim Watson has previously suggested he’s looking to partner with the private sector.

“We’re open to everything,” Tierney told reporters after the plan was unanimously approved. “We don’t have a money tree. If people come to us with clever ideas, we’ll definitely have to look at what they bring back to us.”

Just east of where the Pimisi light-rail station is to be located, the site at 557 Wellington St. is considered superior because it is on the edge of the downtown precinct, is close to commercial, residential and institutional facilities, and is easily accessible by public transit, walking, cycling and car.

But some say it’s a terrible spot because it’s not in the downtown core and easily accessible to patrons arriving on foot or by bicycle.

“We want a location where people live and work — a true downtown location in the heart of Ottawa,” Sarah Anson-Cartwright said on behalf of a citizens’ group called Bookmark the Core.

Danielle McDonald, the library’s chief executive, defended the Wellington site and said it will be used as the comparison for other sites that come forward.

“It’s got some potential. There’s a great vista. There’s a great view,” she said, adding the new building could potentially overlook the river and would be close to the Pimisi station.

Speaking on behalf of CUPE 503, which represents 600 members who work in Ottawa libraries, Susan Arab told the committee the report it was considering was based on a “flawed” business case that appeared to promote the public-private partnership option.

“You need to look more carefully at this document,” she told the board. “We need to do this right.”

Council will be asked to sign off on the plan at its July 8 meeting.

[email protected]
twitter.com/mpearson78

http://ottawacitizen.com/news/local-news...rary-but-battle-looms-over-where-and-how
Reply With Quote
     
     
  #348  
Old Posted Jun 11, 2015, 3:09 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,660
Keep partnership option on table, mayor says of new library plan

Matthew Pearson, Ottawa Citizen
Published on: June 10, 2015, Last Updated: June 10, 2015 2:48 PM EDT


Removing the option of a public-private partnership to build a new central library could make it more difficult to get the ambitious project off the ground, Mayor Jim Watson said Wednesday, a day after Ottawa’s public library board approved a plan to build a new building instead of renovating the current facility on Metcalfe Street.

“If we take that (P3) option off the table, it makes it more difficult for us to put together a financial package that makes sense,” Watson told reporters.

The board’s plan to build an $86-million, 132,000-square foot central branch suggests a city-owned site west of Bronson Avenue is the preferred location against which all others will be compared.

And though a consultant’s report identified four options for structuring the project — including the possibility of partnering with a private-sector consortium to design and build the new facility on land either owned by the city or by the developer — no method has been yet been chosen.

Still, the union that represents library workers and a citizen’s group called Bookmark the Core have both spoken out against the P3 option, calling it “a very unusual approach” for building central libraries in Canada and the U.S.

“While the P3 approach has worked for certain projects, these have tended to be more cookie-cutter sports or recreation complexes, or office buildings. They are not specialized buildings with very specific and complicated requirements like new central libraries,” Bookmark the Core’s spokeswoman Sarah Anson-Cartwright told the library board on Tuesday evening.

Watson said his idea of a P3 only includes land, bricks and mortar — not the operation of the new library. “The operation is fully going to be done by the library staff and the professionals that work at the library,” he said.

Approving the plan for the new library, which city council will be asked to do at its July 8 meeting, is the first step in a long journey, the mayor added.

“My goal is to get a shovel in the ground in this term of council for a new downtown library,” he said. “I think it would be a tremendous improvement on what we have now.”

As for the possible site at 557 Wellington St., just east of the future Pimisi LRT station, Watson said he hadn’t initially thought of it, but added it is near both transit and future developments on Lebreton Flats and islands on the Ottawa River.

But it’s just a basis of comparison, he said. “If other people have other sites they want to allow us to entertain then we’re happy do that,” Watson said.

Before the library board approved the plan on Tuesday, Somerset Coun. Catherine McKenney convinced trustees to support an amendment that made it clear the city is not tied to a specific location or funding model for the new library.

Meanwhile, Kanata North Coun. Marianne Wilkinson, who said she’s not a fan of the Wellington site, asked library staff to conduct a user survey to collect more information about where central library patrons are from and how they get to the library.

[email protected]
twitter.com/mpearson78

http://ottawacitizen.com/news/local-news...-on-table-mayor-says-of-new-library-plan
Reply With Quote
     
     
  #349  
Old Posted Jun 11, 2015, 9:26 PM
DarthVader_1961 DarthVader_1961 is online now
Registered User
 
Join Date: Jun 2009
Posts: 474
This whole debate about where and when to build a library, reminds me of the initial stumbling/debate to get downtown lrt going.
Reply With Quote
     
     
  #350  
Old Posted Jun 11, 2015, 11:41 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
^ As does the whole truck tunnel/bridge issue.

It's funny.. this city takes a while to get moving on anything but once it starts, it finishes.
Reply With Quote
     
     
  #351  
Old Posted Jun 12, 2015, 3:52 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,081
Quote:
Originally Posted by 1overcosc View Post
^ As does the whole truck tunnel/bridge issue.

It's funny.. this city takes a while to get moving on anything but once it starts, it finishes.
Well, the first subway proposal was, what, 1912?
Reply With Quote
     
     
  #352  
Old Posted Jun 12, 2015, 6:12 AM
mykl mykl is offline
Registered User
 
Join Date: Jan 2015
Location: Ottawa
Posts: 475
Maybe we should kill two birds with one stone: finally put Somerst House out of its friggin' misery and use that space and the parking lot behind it to build a library into the sky, right in the middle of downtown.
Reply With Quote
     
     
  #353  
Old Posted Jun 12, 2015, 5:16 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,660
‘Preferred location’ raises ire of library enthusiasts
Staff say 557 Wellington ‘just a placeholder,’ no site chosen for new central library

By Emma Jackson
Ottawa East News, Jun 10, 2015


Location, location, location: that was the theme of the Ottawa Public Library board’s meeting on June 9, which gave staff a mandate to officially start planning a new central branch.

The library board has approved the staff recommendation to build a new central library rather than renovate the 120 Metcalfe St. location, which consultants said is too small for a modern main branch. The board also approved $800,000 for 2015 to ramp up planning for the project, which is expected to break ground in 2018.

About 30 residents came out to the meeting to witness the momentous step, which is the first true approval in the path to a new central library. City council still has to confirm the project as one of 63 strategic initiatives on July 8, after which staff can begin to further nail down cost details, partnership opportunities and location options.

It was the issue of location that got most speakers riled up at the board meeting. Many were adamant the board’s “preferred location” at 557 Wellington St. is a poor choice for such an important civic landmark.

Residents – and some councillors, including Tobi Nussbaum, Catherine McKenney and Marianne Wilkinson – argued the site just east of LeBreton Flats is too far out of the downtown core and doesn’t take advantage of the benefits of a more centralized location, such as serving downtown employees and tourists. One resident said it’s incredibly inaccessible, being “on the wrong side of a steep escarpment.”

But, according to library staff, it’s all just a big misunderstanding: what staff meant by “preferred location” is actually a “public sector comparator” – a benchmark for future proposals.

“A public sector comparator allows governments to figure out if a partnership proposal is more cost effective,” said library chief executive Danielle McDonald. “This has yet to be determined.”

The door is still open to any and all sites in the central area, which stretches from Bayview Road to King Edward Avenue – including privately-owned sites that could be developed in partnership with a private builder, McDonald said.

While the city-owned site has not been officially selected, it will nevertheless be subjected to “additional environmental assessments, further detailed costings, looking at any legal restrictions,” McDonald said, so that accurate comparisons can be made down the road.

Most of those decisions won’t be made for at least another year, and will include public consultations beforehand, staff said.

That was a big concern for resident Mary Cavanagh, who argued the library did little to consult with residents before bringing the report forward.

In March, nearly 200 people took part in a visioning exercise at city hall, and another 1,000 provided input online. Staff also reached out to users at the Main branch itself to get ideas of what people want to see in a new central library.

While those actions led to a comprehensive program framework – which seemed to be well received by everyone in attendance – they failed to address other important factors like location, Cavanagh said.

“Those efforts represent far too little process for such big decisions as are being taken tonight,” said Cavanagh, who is an information studies professor at the University of Ottawa. “Effective public engagement cannot survive on one-time events and occasional focus groups.”

McDonald assured residents that more public consultation is planned for the future, when staff is ready to choose a location.

http://www.ottawacommunitynews.com/news-...ation-raises-ire-of-library-enthusiasts/
Reply With Quote
     
     
  #354  
Old Posted Sep 25, 2015, 1:30 PM
citydwlr citydwlr is offline
Registered User
 
Join Date: Mar 2013
Posts: 734
Maclean's Article:

No shushing, please
The new libraries aren't just “book temples,” but stunning spaces for designers, robot handlers–and tourists

September 24, 2015

* Ottawa's not mentioned in this article, but it was a decent read.
Reply With Quote
     
     
  #355  
Old Posted Oct 5, 2015, 1:14 PM
black cat black cat is offline
Registered User
 
Join Date: Mar 2010
Posts: 17
I would suggest that the City explore sharing the Library and Archives Building on Wellington with the federal government. The LAC building is emptying out and aside from the reading spaces, it is understood that by 2020 or so it will have all its functions and collections off site, mostly in Gatineau. Given that the LAC is central, this could be a great way to reuse the LAC with all its existing facilities and perhaps to add more. Morover, the LAC could retain its reading rooms within the building so that the public don't have to go into deepest Gatineau to do their research etc.
Reply With Quote
     
     
  #356  
Old Posted Oct 5, 2015, 2:13 PM
teej1984 teej1984 is offline
Registered User
 
Join Date: Aug 2011
Location: Sandy Hill, Ottawa
Posts: 310
That's a great idea!~
Reply With Quote
     
     
  #357  
Old Posted Oct 5, 2015, 2:36 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,878
Quote:
Originally Posted by black cat View Post
I would suggest that the City explore sharing the Library and Archives Building on Wellington with the federal government. The LAC building is emptying out and aside from the reading spaces, it is understood that by 2020 or so it will have all its functions and collections off site, mostly in Gatineau. Given that the LAC is central, this could be a great way to reuse the LAC with all its existing facilities and perhaps to add more. Morover, the LAC could retain its reading rooms within the building so that the public don't have to go into deepest Gatineau to do their research etc.
It was already a dated design when it opened in the late 60s (design from the early 50s). I'm not a big fan of fascist architecture, so wouldn't be at all sad to see it go.

Even beyond the architecture, the building is in poor condition not at all suitable for a library (which is why LAC is abandoning it asap) and would require an enormously expensive retrofit. Plus, it is really inaccessible for a municipal library.
Reply With Quote
     
     
  #358  
Old Posted Nov 11, 2015, 5:46 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,660
Library board seeks $3.8M to lay the groundwork for new central branch

Joanne Laucius, Ottawa Citizen
Published on: November 10, 2015 | Last Updated: November 10, 2015 7:30 PM EST


The Ottawa Public Library plans to spend $3.9 million to lay the groundwork for a new central library to replace the outdated Metcalfe Street branch.

A draft budget tabled Tuesday outlined plans to ask city council for $2.9 million of that money. The library system would add another $1 million from its own $46.3-million budget.

Building a new library to replace the central branch was approved as a strategic initiative in July after a report concluded that a new building would be a better option than renovating the Metcalfe branch.

The new central branch is to be larger, with flexible spaces and wireless services. The contract will be awarded in 2017, with construction slated to begin in 2018. If city council approves the $3.9 million, a request for expressions of interest would be issued early in the near year, with responses expected by the end of March.

So far, very little has been confirmed about the project, except that it will be a new build with easy access to the LRT station on the Confederation Line. Other parameters are still to be determined, including the cost — although $86 million is a ballpark figure — the site and who will pay.

“Everyone wants to know more, but we’re not at the part yet,” says library board chairman Coun. Tim Tierney.

A report released this summer identified four ways to structure the project, including partnering with a private sector consortium to design and construct the new branch on land owned by the city or a developer. Seven city-owned sites, including 557 Wellington St., just east of the new Pimisi LRT station, were identified as possibilities. However, the choices are not limited to those sites.

The $3.9 million requested by the library will be used for planning process expenses such as project management, public engagement, site environmental assessment and a financial analysis of the options.

Many expect Ottawa’s new central library will be an architectural showpiece like Halifax’s new library. It has generated more patron traffic and also become a magnet for tourists. But there’s a difference here, says Ottawa Public Library chief executive Danielle McDonald. Halifax had a site, an architect and federal and provincial funding. The Ottawa project has none of those yet.

Meanwhile, the Ottawa Public Library will get a 1.75 per cent increase to its budget next year, which adds up to just over $1 million. Much of the increase — $730,000 — will cover increases in employee contracts. The library had to dip into its $2.2 million in reserves this year to to cover a $1.6 million pay equity settlement.

The library is also fighting eroding revenues. There was a $150,000 drop in library fines collected this year — probably because patrons are reminded by email when their books are due. The shortfall in fines is expected to be $70,000 next year.

[email protected]

http://ottawacitizen.com/news/local-news...ay-the-groundwork-for-new-central-branch
Reply With Quote
     
     
  #359  
Old Posted Nov 12, 2015, 6:44 AM
movebyleap movebyleap is offline
Registered User
 
Join Date: Aug 2007
Posts: 317
Hmmm...The Halifax library is nothing when compared to the fantastic Calgary library currently under construction! (Or the Vancouver library for that matter...)
Reply With Quote
     
     
  #360  
Old Posted Jan 8, 2016, 2:57 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,660
City seeks 'advocate architect' for new central library

Joanne Laucius, Ottawa Citizen
Published on: January 7, 2016 | Last Updated: January 7, 2016 6:49 PM EST


The City of Ottawa is hiring an “advocate architect” to help guide the new central library project.

The city approved the strategic initiative to build a library downtown to replace the Metcalfe branch last July. The advocate architect is to offer advice on the possibilities for various sites and create 3D plans that would show what kind of building could fit into each site in terms of the number of storeys and massing. The firm hired for the advocate role won’t produce the final design.

The posting was listed on the electronic tendering site MERX this week. The deadline for applications is Jan. 26.

In November, library officials held confidential meetings with 14 firms that had expressed interest in the project. “There’s a high level of interest in this project,” said Ottawa Public Library CEO Danielle McDonald.

Library officials expect to release a request for qualifications in April or May, followed by a request for proposals late this fall. The contract will be awarded in 2017, with construction slated to begin in 2018.

However, many details about the project are still up in the air, including the location and budget. Although $86 million has been used as a ballpark figure, funding for the project has not yet been approved. City council approved $3.9 million in the 2016 budget to lay the groundwork for a the new central branch.

The new central branch will have easy access to the LRT station on the Confederation Line. Seven city-owned sites, including 557 Wellington St., just east of the new Pimisi LRT station, have been identified as possibilities. But there are other options. A report released last summer identified four ways to structure the project, including partnering with a private sector consortium to design and construct the new branch on land owned by the city or a developer.

Meanwhile, the city has released the results of a series of Nanos Research surveys of Metcalfe branch users, library cardholders and the general population, as well focus groups involving 94 library users and Ottawa residents.

A convenient location, access to public transit, good interior lighting and a safe and welcoming atmosphere were considered important, along with improved accessibility.

Unique architecture was less important, although some said they wanted a building that would fit into the aesthetic of Ottawa, would become a symbol of Ottawa and have an appealing interior. The views from the inside and distance from shops, restaurants, museums and other cultural institution were less of a priority.

A number of the focus group participants felt that the new branch should be within a block of the LRT station. Some were also wary that the vision for the project would not match the reality.

“The sub-text was one of cynicism — that proponents sometimes over-promised and under-delivered,” said the Nanos report.

http://ottawacitizen.com/news/local-news/city-seeks-advocate-architect-for-new-central-library
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 6:25 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.