Quote:
Originally Posted by jstarr
Could very well be mech clearance or access.
|
Likely clearance for mechanical (substation, backup generator, switch gear, etc.) given the floodplain here there is a Building Code requirement to have it above the 1:100 (IIRC) year flood level. Making floors 3-4 a good choice to leave the main floor and atrium open.