  #741  
Old Posted May 13, 2015, 2:41 AM
Design-mind's Avatar
Design-mind Design-mind is offline
Registered User
 
Join Date: Oct 2012
Posts: 4,652
Reply With Quote
     
     
  #742  
Old Posted May 25, 2015, 8:17 PM
The Fisher Account's Avatar
The Fisher Account The Fisher Account is offline
Registered User
 
Join Date: Oct 2009
Location: Bridgeland - Calgary, AB
Posts: 1,023
Reply With Quote
     
     
  #743  
Old Posted May 25, 2015, 11:38 PM
The Fisher Account's Avatar
The Fisher Account The Fisher Account is offline
Registered User
 
Join Date: Oct 2009
Location: Bridgeland - Calgary, AB
Posts: 1,023
Library crane being assembled:

Reply With Quote
     
     
  #744  
Old Posted May 25, 2015, 11:42 PM
AaronMak AaronMak is offline
Registered User
 
Join Date: May 2015
Posts: 43
Is it just me or does the pace of this build seem to be very very slow? Im sure there is some added complications with straddling the LRT line and the small proximity of an awkwardly shaped site in a highly congested location; but I'm curious to know what it ACTUALLY is that is slowing it down.

Also, does anyone know which trade companies got hired on to do this building? (IE/ the sparkys, envelope, plumbers, concrete, ironworkers, glazers ect.) And if not, does anyone know where i should look to find this out?
Reply With Quote
     
     
  #745  
Old Posted May 26, 2015, 1:40 AM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Quote:
Originally Posted by AaronMak View Post
Is it just me or does the pace of this build seem to be very very slow? Im sure there is some added complications with straddling the LRT line and the small proximity of an awkwardly shaped site in a highly congested location; but I'm curious to know what it ACTUALLY is that is slowing it down.

Also, does anyone know which trade companies got hired on to do this building? (IE/ the sparkys, envelope, plumbers, concrete, ironworkers, glazers ect.) And if not, does anyone know where i should look to find this out?
All they are doing this year is the cover over the LRT track, they can't start the building construction until that is done, for safety reasons.
Reply With Quote
     
     
  #746  
Old Posted May 29, 2015, 12:48 AM
outoftheice outoftheice is offline
Registered User
 
Join Date: Jan 2009
Posts: 914
Quote:
Originally Posted by The Fisher Account View Post
Library crane being assembled:
I walked by the site this afternoon and this second crane was actually being used to work on the Hilton Hotel site. I was actually surprised as I didn't think that the hotel required a second crane. Looks like we'll have to wait a little longer for the official library crane.
Reply With Quote
     
     
  #747  
Old Posted May 29, 2015, 1:38 AM
lineman's Avatar
lineman lineman is offline
power to the people!
 
Join Date: Oct 2008
Location: Crescent Heights, Calgary
Posts: 864
Quote:
Originally Posted by AaronMak View Post
Is it just me or does the pace of this build seem to be very very slow? Im sure there is some added complications with straddling the LRT line and the small proximity of an awkwardly shaped site in a highly congested location; but I'm curious to know what it ACTUALLY is that is slowing it down.

Also, does anyone know which trade companies got hired on to do this building? (IE/ the sparkys, envelope, plumbers, concrete, ironworkers, glazers ect.) And if not, does anyone know where i should look to find this out?
A good chunk of the work has to be done on long weekends or weekends where much isn't happening in terms of events, sports or otherwise. Crews have 3-5 days per month to get a good chunk of the prep work required to make the encapsulation possible. This includes things like rerouting kms of traction power positive, negative and signal cables and ensuring everything after each and every stage is properly operational by Monday rush.
Reply With Quote
     
     
  #748  
Old Posted May 29, 2015, 2:21 AM
lineman's Avatar
lineman lineman is offline
power to the people!
 
Join Date: Oct 2008
Location: Crescent Heights, Calgary
Posts: 864
And no, this cannot be done at night. Switching, potential testing grounding and issuing a guarantee of isolation (obtaining and returning) burns up three of the four hours trains are not running nightly during the week.

Not to be terse, but this is as far as I'll go explaining as to what goes on, which is really just one work package of a pretty big project. Cheers.

Last edited by lineman; May 29, 2015 at 3:28 AM.
Reply With Quote
     
     
  #749  
Old Posted May 29, 2015, 2:24 AM
Surrealplaces's Avatar
Surrealplaces Surrealplaces is offline
Editor
 
Join Date: Feb 2006
Location: Cowtropolis
Posts: 20,247
Reply With Quote
     
     
  #750  
Old Posted May 29, 2015, 12:29 PM
Blue_Cypress's Avatar
Blue_Cypress Blue_Cypress is offline
Snarkotron
 
Join Date: Sep 2006
Location: Mount Pleasant, Calgary
Posts: 2,580
Quote:
Originally Posted by outoftheice View Post
I walked by the site this afternoon and this second crane was actually being used to work on the Hilton Hotel site. I was actually surprised as I didn't think that the hotel required a second crane. Looks like we'll have to wait a little longer for the official library crane.
Next year. Contractor is Stuart Olsen IIRC, tunnel encapsulation is Armtec I think.
__________________
"The ice is near, the solitude is terrible! But how peacefully all things lie in the light..."
Reply With Quote
     
     
  #751  
Old Posted May 30, 2015, 4:49 PM
The Fisher Account's Avatar
The Fisher Account The Fisher Account is offline
Registered User
 
Join Date: Oct 2009
Location: Bridgeland - Calgary, AB
Posts: 1,023
Wrong thread

Last edited by The Fisher Account; May 30, 2015 at 6:27 PM.
Reply With Quote
     
     
  #752  
Old Posted May 31, 2015, 7:54 PM
AaronMak AaronMak is offline
Registered User
 
Join Date: May 2015
Posts: 43
Quote:
Originally Posted by The Fisher Account View Post
Wrong thread
What is? all those comments were project related
Reply With Quote
     
     
  #753  
Old Posted May 31, 2015, 9:09 PM
lineman's Avatar
lineman lineman is offline
power to the people!
 
Join Date: Oct 2008
Location: Crescent Heights, Calgary
Posts: 864
Quote:
Originally Posted by AaronMak View Post
What is? all those comments were project related
The picture of St. Patrick's Island that Fisher originally posted.
Reply With Quote
     
     
  #754  
Old Posted Aug 6, 2015, 2:45 PM
The Fisher Account's Avatar
The Fisher Account The Fisher Account is offline
Registered User
 
Join Date: Oct 2009
Location: Bridgeland - Calgary, AB
Posts: 1,023
Reply With Quote
     
     
  #755  
Old Posted Aug 6, 2015, 2:56 PM
H.E.Pennypacker's Avatar
H.E.Pennypacker H.E.Pennypacker is offline
Registered User
 
Join Date: May 2013
Posts: 1,941
Will construction kick into gear once the tunnel is encapsulated?
Reply With Quote
     
     
  #756  
Old Posted Aug 6, 2015, 3:22 PM
The Fisher Account's Avatar
The Fisher Account The Fisher Account is offline
Registered User
 
Join Date: Oct 2009
Location: Bridgeland - Calgary, AB
Posts: 1,023
Quote:
Originally Posted by H.E.Pennypacker View Post
Will construction kick into gear once the tunnel is encapsulated?
Would that not be fairly obvious?
Reply With Quote
     
     
  #757  
Old Posted Aug 6, 2015, 3:26 PM
UofC.engineer's Avatar
UofC.engineer UofC.engineer is offline
Laura Palmer
 
Join Date: Nov 2010
Location: Twin Peaks, Calgary, AB
Posts: 1,033
Quote:
Originally Posted by The Fisher Account View Post
Would that not be fairly obvious?
No, not really. Many buildings in Calgary are destroyed and then the lots sits fallow for many years with no signs of construction.
Reply With Quote
     
     
  #758  
Old Posted Aug 6, 2015, 4:27 PM
jstarr jstarr is offline
Registered User
 
Join Date: Apr 2015
Posts: 76
I wonder if the tunnel roof will be all precast sections or if will be precast beams with a cast in place deck.
Reply With Quote
     
     
  #759  
Old Posted Aug 6, 2015, 4:32 PM
Calgarian's Avatar
Calgarian Calgarian is offline
Registered User
 
Join Date: Jun 2006
Location: Calgary, AB
Posts: 25,121
Quote:
Originally Posted by jstarr View Post
I wonder if the tunnel roof will be all precast sections or if will be precast beams with a cast in place deck.
Pretty sure they will be precast.
__________________
Git'er done!
Reply With Quote
     
     
  #760  
Old Posted Aug 6, 2015, 6:32 PM
H.E.Pennypacker's Avatar
H.E.Pennypacker H.E.Pennypacker is offline
Registered User
 
Join Date: May 2013
Posts: 1,941
Quote:
Originally Posted by The Fisher Account View Post
Would that not be fairly obvious?
I'm missing the sensible portion of my brain because of work and me leaving for vacation tomorrow.

.. I really need that vacation.

Will be nice to get the Central Library going. EV needs more new projects under construction
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 9:42 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.