Quote:
Originally Posted by Sands
HI Rocky, do you think they will have an walkthrough next month?
|
Hi Sands
From what I can see, they are now installing drywall on the 11th and progressing at approximately 1 floor per week.
With that, it seems unlikely to me that owners of the top half to top third of the building will get a walk through anytime in June. Seems more realistic mid to late July. Just guessing, but I would think it is possible that those on the lower floors could get a chance to walk through by mid to late June.