Quote:
Originally Posted by urbanlife
Trimet was lucky getting the two lines into Clackamas County before they voted opposition to light rail. The Green line doesn't need to be expanded any further, and the Orange line could be expanded, but the people that live along the 99E Corridor should be the ones pushing for it if they ever talk about extending it.
The Powell Division corridor is an important one, I would like to see it be a rail line or a rail/bus line system, but if it is a BRT it should be exclusive rather than a half assed idea.
|
I think the big issue is that the Powell/Division Corridor is mostly being sold as a way to connect East Portland to the Green Line. The Orange Line as designed will work well, and it creates a corridor from SE Milwaukie to PSU for buses. From there to 39th it'll be half-assed, but it'll still be a lot faster than the existing bus if it's built as Metro has pushed at the community workshops I've gone to.
It looks like it'll be exclusive lanes from about Foster/50th to SE 92nd, and on Division from SE 92nd to Gresham. Them it can continue to Mt Hood Community college, and connect MHCC to the Blue Line, as well as Division from Gresham to the Green Line.
It will serve as an express/feeder service to the two east side MAX lines, and along Powell will allow people to move faster than the current 9 which stops every 2-3 blocks. It's also overcrowded almost every time I use it, so having an express that serves the same corridor probably won't hurt anything.
For 27 or 38 blocks it will be in mixed traffic, but that's not really that bad if it's not frequently stopping, can jump the traffic in some parts (like from SE 17th to Milwaukie), and can use the TriMet bridge instead of the Ross Island.
In the long run a light rail line will be a nice, but for now (and from what they said at workshops, it'll open in 2020 instead of 2030 if they opt for the compromised BRT) preserving ROW along Powell east of Foster and along Division seems like a good incremental step.