Quote:
Originally Posted by Mappy
Its a map of how many jobs are within a certain point using walking/transit
Yeah the link is Here:
https://a.tiles.mapbox.com/v4/ctswebrequ...n0.muGg6tMDG4NOGrV4qQQ8yw#4/38.00/-99.76
Your rail line designs got me excited about a couple of things I hadnt thought of testing out yet. particularly the "Railyard/Zoo/River Link". I hadnt thought of connecting the City Line to the 25th St Viaduct.
This would be fantastic since it would connect all the wasted ROW that could be passenger rail into one very useful line, hitting all the tourist regions + 30th St Station, and several residential areas...
My only concern when trying to integrate that into my rails plan maps was the physical rail lines. The elevated line (currently CSX freight)going through U.City doesn't connect to any lines going over the Connecting Railway Bridge. they could build a switch as it curves around the Zoo, but then it would also need to cross all the way from the furthest North track, to the furthest South track in order to make the turn to the Pennsylvania Ave stretch of the City Line, and it would have to make these switches while ON the bridge. I'll keep working on it, but I dont know if this is possible.
Perhaps an alternative that would work is a new switch by Stewart Field that would send the new line through 30th St Station instead of the elevated CSX tracks.
Like the "City Line" here: https://drive.google.com/file/d/0B1M7ORw1X9nMTUJhS3JOQUt4a3c/view?usp=sharing
|
thanks for the link
My plan is really just not anything more than playing with maps and some basic knowledge and not an expert on the junctions etc.
I think in theory there would be a new bridge (or maybe a second below south) in my plan built for the crossing by the zoo
This would handle an retrofit HR Airport line (Airport through 30th, Zoo, Penny cut and terminate back at 15th and Locust), the BLVD line (from Neshaminy mall down BLVD to a BSL connection (well both Norristown and CH W would be retrofitted HR to trunk with BSL to Broad and Locust using the express tracks) along Lehigh (elevated) 33rd (elevated) accross the river and down to the Navy Yard via the viaduct. There would also be a loop from Louct and 15th around and down to the Navy yard
So the 15th and locust would be the terminus for a lopp line to the Navy Yard, the airport line and Patco
The Navy Yard would have the Blvd Terminus, Loop line terminus both via the viaduct and the current BSL terminus
North Philly would connect the BLVD, Norristown and CH West lines as well as the remaining RR lines that come through there
30th would link Trolleys, MFL, RR, Amtrak, the BLVD, Loop, and Airport Lines
8th would link Patco, MFL, Loop, and Airport lines
Just a though or way to leverage the exiting ROW somewhat meaningfully, I think in theory elevated ROW could somehow navigate the railyard, but smarter minds then mine would need to figure that out
I also thought the under side current road area of 30th from Market to Walnut could be the ROW for the new HR line, or some configuration of that
I also have some LRT lines to be added
Will check your map in more detail - thanks