HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Buildings & Architecture, Urban Design & Heritage Issues


Reply

 
Thread Tools Display Modes
     
     
  #181  
Old Posted Mar 4, 2015, 5:11 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Yeah that's celebration square! It's been in the plans for ages Had no idea they were that far along though, great news!
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #182  
Old Posted Mar 5, 2015, 1:27 AM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
Quote:
Originally Posted by RyLucky View Post


We aren't going to remove existing trees, right?
Along the sidewalks? Doubt it.

What's up with the new park in Vic park? Is that house getting moved and restored? How come the wasn't a public art installation? Looks pretty basic right now.
Reply With Quote
     
     
  #183  
Old Posted Mar 5, 2015, 6:04 AM
stophs stophs is offline
Registered User
 
Join Date: Jul 2009
Posts: 237
It doesn't look like much to celebrate there. I'd like to see more angles, but at first glance it looks pretty disappointing. Public spaces like this should fit and integrate well with the surroundings and the design should consider how people will be move through and what they will do in the space. This looks pretty generic.
Reply With Quote
     
     
  #184  
Old Posted Mar 5, 2015, 6:49 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
I just really don't like the idea of walling off the square from the other side of the street. Even if it's just those fins, it will still create a psychological separation. Why not design the park to sort of (safely) integrate with the tracks, to make it welcoming from all angles?
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #185  
Old Posted Mar 5, 2015, 3:09 PM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by stophs View Post
It doesn't look like much to celebrate there. I'd like to see more angles, but at first glance it looks pretty disappointing. Public spaces like this should fit and integrate well with the surroundings and the design should consider how people will be move through and what they will do in the space. This looks pretty generic.
Quote:
Originally Posted by Chadillaccc View Post
I just really don't like the idea of walling off the square from the other side of the street. Even if it's just those fins, it will still create a psychological separation. Why not design the park to sort of (safely) integrate with the tracks, to make it welcoming from all angles?
This is the problem with our LRT currently there is the perceived need for it to be isolated from all other users by large fences. The same perception prevents us from fully implementing shared spaces.
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
Reply With Quote
     
     
  #186  
Old Posted Mar 5, 2015, 4:04 PM
CalgaryAlex's Avatar
CalgaryAlex CalgaryAlex is offline
Registered User
 
Join Date: Sep 2014
Location: Calgary
Posts: 617
Quote:
Originally Posted by Full Mountain View Post
This is the problem with our LRT currently there is the perceived need for it to be isolated from all other users by large fences. The same perception prevents us from fully implementing shared spaces.
I think that feeling is changing in some areas. In public surveys for design of the Bow to Bluff green strip, one of the points I saw was a desire for the green fence along the tracks to be torn down.

Would improve visibility and the overall aesthetics of the area drastically.
Reply With Quote
     
     
  #187  
Old Posted Mar 5, 2015, 5:20 PM
Surrealplaces's Avatar
Surrealplaces Surrealplaces is offline
Editor
 
Join Date: Feb 2006
Location: Cowtropolis
Posts: 20,265
Quote:
Originally Posted by *Stardust* View Post
Druh Farrell confirmed on her Facebook page under the 1st street underpass comments that the 8th street corridor upgrade will start in May
That's really good news. Especially with all these new projects in the area (WAM, Mark, 6th and 10th and the Aura towers) 8th street is only going to get busier as a corridor.
Reply With Quote
     
     
  #188  
Old Posted Mar 5, 2015, 5:24 PM
Fuzz's Avatar
Fuzz Fuzz is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,421
Awesome news on 8th. It will probably be a disaster to get through during construction but will be worth it. Does that mean they figured out how to handle the lane issues with the proposed bike lanes? I haven't seen the final design on that.
Reply With Quote
     
     
  #189  
Old Posted Mar 5, 2015, 7:12 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
Sounds like this is more of a unusable site that CMLC wanted to pretty up. Prob not big enough to be a real performance type space, it's ok though River Walk performs that function well. I'd like to see more detailed renders though. Only one they have looks generic.

Quote:
Originally Posted by stophs View Post
It doesn't look like much to celebrate there. I'd like to see more angles, but at first glance it looks pretty disappointing. Public spaces like this should fit and integrate well with the surroundings and the design should consider how people will be move through and what they will do in the space. This looks pretty generic.
Reply With Quote
     
     
  #190  
Old Posted Mar 19, 2015, 3:17 AM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
It's the yr of the pedestrian. Beltline's having its first pedestrian strategy open house tom:

https://mobile.twitter.com/beltline_pres/status/578312411427389440
Reply With Quote
     
     
  #191  
Old Posted Mar 19, 2015, 10:08 PM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 601
Quote:
Originally Posted by CalgaryAlex View Post
I think that feeling is changing in some areas. In public surveys for design of the Bow to Bluff green strip, one of the points I saw was a desire for the green fence along the tracks to be torn down.

Would improve visibility and the overall aesthetics of the area drastically.
TLDR: grade seperation is good

Removing the fences, and running the NW LRT or the green line like a tram in traffic will also reduce speed, reliability, and frequency of the public transit. It will make it lower quality for its users. Removing elements that essentially make sections of the LRT system grade seperated will kill or seriously injure people and is a safety issue unless the train is limited to slow speed - 30km/h in that area.

Forgive me, begin rant/
We are not building complete communities in Calgary yet and one of the results is the LRT in Sunnyside and the upcoming redesign of Crowchild Trail over the Bow River. I think it's terrible and local communities shouldn't have to have big, noisy, dangerous transportation elements slashing through and dividing neighbourhoods - a dispersed grid network of multiple transportation options emphasizing active transportation where everyone can work, live, and play is the ideal. Calgary builds suburban sprawl and freeways that other transportation choices need to compete with.

Think of how much harder it would now be to make the Sunnyside LRT station elevated, elevate the line from the Bow/Memorial bridge to the bridge up the escarpment and over 10th St NW, and throw in something like a multi-use pathway with trees like along the Bow River with the LRT's heavy daily usage and Kensington continuing to build up around the Sunnyside station, so there's even less space than there was in 1983.

This is the absolute same false idea some are selling with the green line LRT - selling the benefits of our current LRT, that over large portions is essentially grade seperated and can run every three minutes, at 80km/h, and is not affected by traffic congestion or accidents, with a relatively inexpensive, new low-floor at grade version running in traffic lanes either interacting with vehicles or not seperated in any way except at skeletal roads. This will have to compete with a six lane freeway in Deerfoot Trail, door-to-door service where you can control the temperature and play music while not having to interact with people different than you are.

More frequent BRT, since the LRT won't originally run at 3min headways - the 3min frequency of buses becomes 15 minute headways is a worse option than a bus - BRT with queue jumpers is better than some of the ideas for LRT out there. As sexy as rail is right now in 2015, the jump should be from BRT to a system as grade seperated as possible. Calgary will get what it pays for, and people will make the decision between car, bike, walking, or transit. Why not make all the options as high quality as possible even if we can't build it as quickly? Do it in phases with buses dropping people off. The TOD argument is a red herring, TOD is a result of zoning, public transit enables it, but that public transit can just as easily be something cheaper like buses with identical public amenities and public realm investments to LRT stations. There's studies out there that claim seperated bike paths raise house prices.

This urban utopia with trams running down the street is bunk. There are very good reasons street trolleys were removed in Calgary and replaced with buses despite the romance and nostalgia of rail. Buses are cheaper and better. If we can agree to spend an estimated $5 billion on 25% of a ring road... Given how this city is laid out, people will be less likely to use a slow, less reliable, and less frequent service, because they need to get from point A to point B and yes the communities in between will be negatively impacted. Let's minimize the impact by grade seperating the transportation infrastructure and investing in the public realm.

Efforts like that $45,000 could very well be the future for greenline communities. I'd much rather invest public realm monies into wider sidewalks trees, flower beds, and seperated bike lanes while seeing negative examples of public realm impacts like this:

wally gobetz
thor christofer
jag9889
Reply With Quote
     
     
  #192  
Old Posted Mar 20, 2015, 2:23 PM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by ClaytonA View Post
TLDR: grade seperation is good

Removing the fences, and running the NW LRT or the green line like a tram in traffic will also reduce speed, reliability, and frequency of the public transit. It will make it lower quality for its users. Removing elements that essentially make sections of the LRT system grade seperated will kill or seriously injure people and is a safety issue unless the train is limited to slow speed - 30km/h in that area.

Forgive me, begin rant/
We are not building complete communities in Calgary yet and one of the results is the LRT in Sunnyside and the upcoming redesign of Crowchild Trail over the Bow River. I think it's terrible and local communities shouldn't have to have big, noisy, dangerous transportation elements slashing through and dividing neighbourhoods - a dispersed grid network of multiple transportation options emphasizing active transportation where everyone can work, live, and play is the ideal. Calgary builds suburban sprawl and freeways that other transportation choices need to compete with.

Think of how much harder it would now be to make the Sunnyside LRT station elevated, elevate the line from the Bow/Memorial bridge to the bridge up the escarpment and over 10th St NW, and throw in something like a multi-use pathway with trees like along the Bow River with the LRT's heavy daily usage and Kensington continuing to build up around the Sunnyside station, so there's even less space than there was in 1983.

This is the absolute same false idea some are selling with the green line LRT - selling the benefits of our current LRT, that over large portions is essentially grade seperated and can run every three minutes, at 80km/h, and is not affected by traffic congestion or accidents, with a relatively inexpensive, new low-floor at grade version running in traffic lanes either interacting with vehicles or not seperated in any way except at skeletal roads. This will have to compete with a six lane freeway in Deerfoot Trail, door-to-door service where you can control the temperature and play music while not having to interact with people different than you are.

More frequent BRT, since the LRT won't originally run at 3min headways - the 3min frequency of buses becomes 15 minute headways is a worse option than a bus - BRT with queue jumpers is better than some of the ideas for LRT out there. As sexy as rail is right now in 2015, the jump should be from BRT to a system as grade seperated as possible. Calgary will get what it pays for, and people will make the decision between car, bike, walking, or transit. Why not make all the options as high quality as possible even if we can't build it as quickly? Do it in phases with buses dropping people off. The TOD argument is a red herring, TOD is a result of zoning, public transit enables it, but that public transit can just as easily be something cheaper like buses with identical public amenities and public realm investments to LRT stations. There's studies out there that claim seperated bike paths raise house prices.

This urban utopia with trams running down the street is bunk. There are very good reasons street trolleys were removed in Calgary and replaced with buses despite the romance and nostalgia of rail. Buses are cheaper and better. If we can agree to spend an estimated $5 billion on 25% of a ring road... Given how this city is laid out, people will be less likely to use a slow, less reliable, and less frequent service, because they need to get from point A to point B and yes the communities in between will be negatively impacted. Let's minimize the impact by grade seperating the transportation infrastructure and investing in the public realm.

Efforts like that $45,000 could very well be the future for greenline communities. I'd much rather invest public realm monies into wider sidewalks trees, flower beds, and seperated bike lanes while seeing negative examples of public realm impacts like this:
As an FYI none of the options proposed at grade for the green line run in traffic all have dedicated infrastructure throughout their length.
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
Reply With Quote
     
     
  #193  
Old Posted Mar 24, 2015, 2:49 AM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
Part to the new Beltline pedestrian strategy involves better linkages with downtown and stampede. the 4th underpass is currently in design phase too.

as-way-to-weld-beltline-downtown-and-stampede/
Reply With Quote
     
     
  #194  
Old Posted Mar 24, 2015, 7:31 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Sounds good, but the link you posted was only a small snippet of a link and didn't work.

Was this the link you were looking for? http://metronews.ca/news/calgary/1320144...-to-weld-beltline-downtown-and-stampede/
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #195  
Old Posted Mar 25, 2015, 4:37 AM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
Yeah that's the one thanks
Reply With Quote
     
     
  #196  
Old Posted Mar 28, 2015, 1:21 AM
Jimby's Avatar
Jimby Jimby is offline
not a NIMBY
 
Join Date: May 2007
Location: Calgary
Posts: 8,796
Not sure which thread this belongs to, but Slide the City has sold out their first day already. Looks like a lot of fun.
Reply With Quote
     
     
  #197  
Old Posted Apr 6, 2015, 7:26 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
The final report for West Eau Claire Park looks absolutely amazing... wow. Possibly the best urban park in the country. Looks like it included a Cafe near the cove too!

http://www.calgary.ca/PDA/pd/Documents/Publications/west-eau-claire-final-report.pdf
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #198  
Old Posted Apr 6, 2015, 12:29 PM
Fuzz's Avatar
Fuzz Fuzz is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,421
Looks great. Really like the River Deck, though flooding might be a concern there...
I like that they maintained nice straight pathways for commuters around the Peace Bridge and don't look to be clogging sight lines with tall objects. That area is already congested at commuter hours so it is good some thought went into that. The whole area is gonig to look totally different with this and Disco Stu's Shoes.
Reply With Quote
     
     
  #199  
Old Posted Apr 6, 2015, 4:28 PM
MasterG's Avatar
MasterG MasterG is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 1,820
Quote:
Originally Posted by Fuzz View Post
Looks great. Really like the River Deck, though flooding might be a concern there...
I like that they maintained nice straight pathways for commuters around the Peace Bridge and don't look to be clogging sight lines with tall objects. That area is already congested at commuter hours so it is good some thought went into that. The whole area is gonig to look totally different with this and Disco Stu's Shoes.
I wonder how susceptible the River deck would be to flooding, it is just a pathway after all. Surely it could be submerged in the event of extreme high-water (not to mention the water level of the lagoon is controlled at the causeway, so flooding would probably only be an issue in rare mega-events).

It looks like there is substantial effort put into expanding and connecting the pathways in the area to relieve some of that congestion. Great to see.

Is there any plans to tie this work into the 8th Street Corridor plan? That project has been suspiciously quiet but went through the rigour and public consultation over a year ago.

I hope it wasn't quietly shelved, it is the best public realm project we have that isn't a park.
__________________
From the right side of the wrong side of the tracks.
Reply With Quote
     
     
  #200  
Old Posted Apr 6, 2015, 5:49 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
So awesome, this was the weak point of the network. The riverwalk expansion down the Elbow to Mission should be starting soon too, which will further solidify the pathway system. The Stampede is building a big new park out there right now as well.

I'd like to see more public art down along the Eau-Claire side too. Will be a great draw for the city.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Buildings & Architecture, Urban Design & Heritage Issues
Forum Jump



Forum Jump


All times are GMT. The time now is 11:25 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.