Posted Mar 13, 2015, 4:09 PM
|
 |
What could go wrong?
|
|
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,934
|
|
As far as I know the original Architect (Verne Reimer) was dropped and Mistecture has come in and assumed the drawings that already exist. If they don't get contracts out within the next month (April) the project may be scrapped.
|