Quote:
Originally Posted by waterloowarrior
|
I love this one:
1.10
The plan should incorporate a single line serving the Airport, then running underneath the Airport to serve Riverside South. This would eliminate branching/transfers and bring the line closer to the population it is intended to serve.
5
This option was considered as part of the N-S LRT EA and not carried forward due to
security and cost issues associated with tunnelling underneath the Airport.
Did they forget a road alread passes under a taxi way? And there dont seem to be cost issues anywhere else on the line (RE SJAM Parkway alignment). Basically I am saying what I have said before, align to where the people live, or align to a TOD. Dont align to a cornfield that will have a parking lot in it because thats just f**king stupid.