HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > General Development


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Mar 12, 2015, 2:22 AM
timbad timbad is offline
heavy user of walkability
 
Join Date: May 2008
Location: Mission Bay, San Francisco
Posts: 3,148
Berry activity

it looks like they're (finally) getting ready to break ground at 360 Berry St - putting finishing touches on fencing off the site today.

looking east, with bonus of some Rincon Hill construction in distance:



and back the other way in better light. in both pics you get a good sense of the proximity of the freeway off-ramp to this parcel




let's hope they've tweaked - no, completely started over on - the design of this

Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Global Projects & Construction > General Development
Forum Jump



Forum Jump


All times are GMT. The time now is 7:19 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.