Originally Posted by aberdeen5698
How come the TTC cars are "notoriously unreliable" while ours are seen as extremely reliable despite their much higher mileage and service hours?
|
I think it is a result of the SRT being the first trains after the prototypes were built, so Vancouver's cars were built after UTDC learned all the problems of ramping up the factory for production while making the SRT cars.
SRT was the orphan step-child of the Toronto transit system, since the original plan was for the SRT tracks to be an extension of the ALRV streetcar system. Ontario Premier had this as a 'make work project', so these MkI trains were ordered instead, and the stations and guideway was redesigned for the MkI cars. There are pictures on the web showing the stations built with low-level platforms for the ALRV low-floor cars, and the high-level platforms built over these to meet the UTDC car floor height.
SRT doesn't have a dedicated maintenance facility on the line, so the cars have to be trucked off-site for maintenance - resulting in excess costs and therefore minimal maintenance of the fleet.
Say what you want about Translink spending money on Skytrain, the trains are (mostly) properly maintained to have the original cars still running well after 30 years, and they are willing to refurb the original cars to keep them running for another 25+ years.
And TO has a bit harsher winter than Vancouver.