  #2021  
Old Posted Mar 5, 2015, 7:41 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
Quote:
Originally Posted by Kitchissippi View Post
I hope the floors will have heating defrosters because salting them will just accelerate wear and tear on the stations and trains.
Darwin has said that there won't be on his blog, and not in a pessimistic "there probably won't be..." but in an aggrieved "city staff types told me..."
     
     
  #2022  
Old Posted Mar 5, 2015, 7:42 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Probably due to soil contamination in the area. Elevating Hurdman minimizes the amount of ground that is displaced for construction, which in turn minimizes cleanup requirements.
     
     
  #2023  
Old Posted Mar 5, 2015, 8:21 PM
eemy's Avatar
eemy eemy is offline
Closed account
 
Join Date: Aug 2006
Posts: 4,425
With heavy transfer traffic here, though, this configuration is far superior. Clearly they don't cheap out on absolutely everything!
     
     
  #2024  
Old Posted Mar 5, 2015, 9:40 PM
DarkArconio DarkArconio is offline
Registered User
 
Join Date: Mar 2010
Posts: 182
Quote:
Originally Posted by 1overcosc View Post
Probably due to soil contamination in the area. Elevating Hurdman minimizes the amount of ground that is displaced for construction, which in turn minimizes cleanup requirements.
I believe that's exactly the case. Cheaper to dump a bunch of earth on top than decontaminate the surface.
     
     
  #2025  
Old Posted Mar 5, 2015, 9:55 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,684
In the Request for Proposals, the stations were specified as covered. If that was what was asked for, that should have been a minimum deliverable.



     
     
  #2026  
Old Posted Mar 5, 2015, 10:03 PM
Mikeed Mikeed is offline
Registered User
 
Join Date: Jun 2013
Posts: 377
Quote:
Originally Posted by MoreTrains View Post
I still dont fully understand the reasoning for an elevated Hurdman... It seems like more money than necessary. They could have put it at grade, with a centre platform, and put an underpass with two sets of stairs and an elevator... would be cheaper than the lead upto, the entire station and the egress from being elevated.
A number of reasons come to mind:

- the land use to be a landfill so you really don't want to dig into the earth or costs will sky rocket for remediation
- the land to the north of the station is classified by the NCC as slated for development of national significance and TOD by the city
> the design plans leave a significant gap in the above grade ROW to the right of the station to thread an road to this future property
- the line has to grade up anyways to go over riverside dr. this smoothes out the grades from the Lees trench to the above grade overpass of riverside drive while still allowing for 120 meter (eventually) station between

- I also wonder, as I've noticed the plan calls for a massive gap that punches straight through the station, directly centre after the station is extended to 120m. A gap wide enough for say, an LRT platform to be built at grade connecting the south east by rail. Future proofing??



__________________
Long time reader.
Seldom post.
     
     
  #2027  
Old Posted Mar 5, 2015, 10:10 PM
nredding nredding is offline
Registered User
 
Join Date: Nov 2009
Posts: 188
Quote:
Originally Posted by MoreTrains View Post
I still dont fully understand the reasoning for an elevated Hurdman... It seems like more money than necessary. They could have put it at grade, with a centre platform, and put an underpass with two sets of stairs and an elevator... would be cheaper than the lead upto, the entire station and the egress from being elevated.
I believe it is to transfer LRT-bus transfer. The bus platforms will be beneath the LRT platforms.
     
     
  #2028  
Old Posted Mar 5, 2015, 10:42 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,684
Quote:
Originally Posted by Mikeed View Post
- I also wonder, as I've noticed the plan calls for a massive gap that punches straight through the station, directly centre after the station is extended to 120m. A gap wide enough for say, an LRT platform to be built at grade connecting the south east by rail. Future proofing??
How is that future proofing when a train has nowhere to go if one ever went through there. This city can't even envision a train going across to Gatineau and plan for it at Bayview, what makes you think it would be somehow enlightened here?
     
     
  #2029  
Old Posted Mar 6, 2015, 12:08 AM
Mikeed Mikeed is offline
Registered User
 
Join Date: Jun 2013
Posts: 377
Quote:
Originally Posted by Kitchissippi View Post
How is that future proofing when a train has nowhere to go if one ever went through there. This city can't even envision a train going across to Gatineau and plan for it at Bayview, what makes you think it would be somehow enlightened here?
Yeah, I've also considered that. That's a good point- the city has not adequately planned for how the Trillium Line would access the yard & maintenance shed or what will happen to the southeast transit way. I went pouring over the reports on the confederation line website to see if there are any hints about why such a large gap exists there when the pedestrian flows will be highest to the left of this entrance but found little hints except for one diagram that marks it with a triangle, seemingly alluding to it's evolving purpose. (or maybe public art location) But the large gap seems intriguing as it appears to be a 'defined envelope' for something more then what is needed.




The city planning requires that Hurdman be built so that any development at the NCC lands to the north is able to built right up and interconnected to the station.

See also the large temporary plaza at Tunney's Pasture that will eventually be TOD'd.





It just seems to be another place holder plaza.

Edit:

I also think there is almost zero likely hood that the Prince of Wales bridge will be used for LRT. If it is used for transit it will be a BRT connection to Bayview by STO. The question is, are going to have an maintenance shed for every single line we build?
__________________
Long time reader.
Seldom post.
     
     
  #2030  
Old Posted Mar 6, 2015, 12:37 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,586
Construction Update
Week of March 2




Albert Street Civic Works

Trenching and shoring installation continue, and sanitary sewer pipe installation begins for the construction of the LeBreton Flats Diversion Chamber and other associated sewer works. Lane and multi-use pathway closures are ongoing through summer on Albert Street. For more information on the Cyclist Detour Map: www.ottawa.ca/confederationline.


Reinforcement and waterproofing works progress in the Lyon Station cavern

Lyon Station Cavern


Lyon Station cavern reinforcement and construction continues with pouring of foundation slab and removal of L-wall formwork. Work for final lining is ongoing with tunnel draining and waterproofing. East entrance preliminary works within Place de Ville include hoarding and way finding installation.


Parliament Station tunnel

Parliament Station Cavern

Crews are working on a 24 hour basis in Parliament Station cavern as Chewrocka continues to excavate upper drifts and begins to excavate the central pillar. Station cavern support is also underway and includes tension ties, shotcrete and lattice girder installation.


Crocodile Rouge in Rideau Station cavern drift

Rideau Station Cavern


Crocodile Rouge excavates the Rideau Station cavern as Jawbreaker mines the running tunnel bench. Tunnel reinforcement continues and includes shotcrete, wire mesh and bolt installation, as well as rebar and grouting.


Scotiabank demolition debris removal

Rideau Station East Entrance


Demolition and debris removal continues at the future Rideau Station east entrance.


Curtain wall installation on the Administration and Maintenance building

Belfast Yard Administration and Maintenance Building/Vehicle Storage Shed


Pouring of concrete slabs, plumbing, electrical, drywall and framing continue. Exterior work includes glazing and outer curtain wall installations. On the shed, crews are nearing completion of the sprinkler system and continue roofing.


Works progress at the Belfast Yard connector

Belfast Yard Connector


Works on the connector are ongoing north of the VIA Rail tracks, including excavation, lagging and grouting of rock bolts. Additional formwork is expected to begin in early March. Utility relocation work has started along Tremblay Road at Belfast.


Forming of Variable Messaging Signs footings in Highway 417 median lane

Highway 417 Roadworks


Ongoing work in the median includes backfilling, electrical trenching, light pole bases and conduit installations. Work continues for two new Variable Messaging Signs (VMS) to be located near Vanier Parkway (eastbound lanes) and St. Laurent Boulevard (westbound lanes).


Hurdman Bridge deck formwork continues

Hurdman Bridge (Highway 417 over Rideau River)


Crews continue reconstructing the median span of the bridge. Formwork currently underway is scheduled to be followed by rebar and deck work in the spring.
Intermittent flagging will continue at the Rideau River east and west multi-use pathways through to the spring.


Concrete removal at Vanier Parkway staging area

Vanier Parkway Overpass


Final bridge work will resume in the spring. Crews continue to remove concrete from the staging area, as weather permits.


Upcoming Construction Activities

In the coming weeks, the following construction activities will occur:
• Lyon Station east entrance excavation is anticipated to begin in late winter.
• Parliament Station utilities relocation work is scheduled to occur in late winter.
• Street lights along Scott Street are scheduled for relocation the beginning of March.

Additional construction activities scheduled for the spring include:
• Blair Station and St-Laurent Station utilities work are scheduled to occur in April.
• Hurdman Station substructure and foundation work is scheduled to resume in March.
• The St-Laurent Station temporary ramp to Highway 417 westbound construction will begin in April.
• Paving and final intersection reconfiguration works at Lemieux Street and St. Laurent Boulevard will resume in the spring.
• Final bridge works will occur in spring at the Lees Avenue overpass, Vanier Parkway overpass and Belfast Bridge.
• Trackwork is scheduled to begin in the Belfast Yard Administrative and Maintenance building in the spring.

http://www.ligneconfederationline.ca/construction/construction-update-12/
     
     
  #2031  
Old Posted Mar 6, 2015, 4:23 AM
HighwayStar's Avatar
HighwayStar HighwayStar is offline
Registered User
 
Join Date: Jul 2014
Location: PHX (by way of YOW)
Posts: 1,200
^^^ Is it my imagination or does Lyon Station look a lot "narrower" than Parliament or Rideau ???
     
     
  #2032  
Old Posted Mar 6, 2015, 5:10 AM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,402
Quote:
Originally Posted by HighwayStar View Post
^^^ Is it my imagination or does Lyon Station look a lot "narrower" than Parliament or Rideau ???
You're not crazy, that photo shows one of the "drifts" that the station is excavated in. Basically they make five separate cuts, one each for the top of each side of the arch, one down the middle of the arch, and then two across the bottom, deepening it out. There was a diagram of this a while back. What you're looking at in the picture is the top right cut of the overall shape, which is why it is more curved on the right side of the picture. If you look, the Rideau cavern doesn't look very tall, this is because the bottom two drifts remain to be cut out. In addition, the upper left drift remains in front of the roadheader.
     
     
  #2033  
Old Posted Mar 6, 2015, 10:56 AM
Buggys Buggys is offline
Registered User
 
Join Date: Dec 2012
Location: Ottawa
Posts: 659
Quote:
Originally Posted by 1overcosc View Post
Those are just renders. We have yet to see detailed station designs.

That said, the Confederation Line stations as currently rendered are either comparable to, or better than, stations in Edmonton (which has harsher winter weather than us), Calgary (ditto), and Vancouver (where it rains a lot). They're also better than our current Transitway stations.
I've visited AB in winter, and don't think Calgary and Edmonton uses as much salt as we do. It's either so cold that salted snow/ice doesn't melt, or the warm Chinook winds melts some. I also remember seeing human road crews chipping at ice on the pavement in Calgary!
     
     
  #2034  
Old Posted Mar 6, 2015, 12:58 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,684
Quote:
Originally Posted by HighwayStar View Post
^^^ Is it my imagination or does Lyon Station look a lot "narrower" than Parliament or Rideau ???
The photo of Parliament station is a tunnel section, the station caverns are wider and taller and get excavated in "drifts" since the roadheaders have limited reach. Depending on the geology of the station location, they do it in different order. Here's an example diagram, the photo for Lyon seems to reflect the top shape of drift #1, so it should be more than twice as wide in the end.

     
     
  #2035  
Old Posted Mar 6, 2015, 1:22 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
"I still don't get the reason why a lot of the stations are not roofed over."

The're not even properly walled around.
Typical of current OC-Transpo stations, like Hurdman, St-Laurent, Blair, Billings Bridge, ...
     
     
  #2036  
Old Posted Mar 6, 2015, 4:18 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by Buggys View Post
I've visited AB in winter, and don't think Calgary and Edmonton uses as much salt as we do. It's either so cold that salted snow/ice doesn't melt, or the warm Chinook winds melts some. I also remember seeing human road crews chipping at ice on the pavement in Calgary!
That would apply to Calgary, but not to Edmonton. Edmonton doesn't get chinooks.

Both cities, while they are very cold (Edmonton colder than Ottawa, Calgary would be if you left out the chinooks), are still above the minimum temperature for salting, which is -18C. In all three cities (Edmonton, Calgary, Ottawa), daytime temperatures very rarely fall below that and nighttime temperatures typically stay above it too.
     
     
  #2037  
Old Posted Mar 6, 2015, 5:00 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,684
Both Calgary and Edmonton have much drier winters. Average snowfall in January for Calgary is 15 cm, Edmonton is 25, and Ottawa is more than double at 54 cm. We salt because of precipitation, not the cold. I don't think they get much freezing rain out west either.

They're going to have to salt and grit the platforms if they don't have defrosters on them. it will get into the trains, the escalators and pit the flooring. It will be a matter of years for the stations to look like s#!t just like the Transitway stations
     
     
  #2038  
Old Posted Mar 6, 2015, 5:11 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by Kitchissippi View Post
Both Calgary and Edmonton have much drier winters. Average snowfall in January for Calgary is 15 cm, Edmonton is 25, and Ottawa is more than double at 54 cm. We salt because of precipitation, not the cold. I don't think they get much freezing rain out west either.

They're going to have to salt and grit the platforms if they don't have defrosters on them. it will get into the trains, the escalators and pit the flooring. It will be a matter of years for the stations to look like s#!t just like the Transitway stations
Do any rapid transit stations ever look nice? I mean, Montreal's metro has some great art on the walls but the platforms are still really grimy. Toronto, ditto just without the great art on the walls! I got the same experience in the London Underground.

Keeping all the stations pristine is probably a lost cause.
     
     
  #2039  
Old Posted Mar 6, 2015, 5:14 PM
Jamaican-Phoenix's Avatar
Jamaican-Phoenix Jamaican-Phoenix is offline
R2-D2's army of death
 
Join Date: Jun 2007
Location: Downtown Ottawa
Posts: 3,561
Quote:
Originally Posted by eltodesukane View Post
"I still don't get the reason why a lot of the stations are not roofed over."

The're not even properly walled around.
Typical of current OC-Transpo stations, like Hurdman, St-Laurent, Blair, Billings Bridge, ...
I guess they think we're suckers for punishment in winter.
__________________
Franky: Ajldub, name calling is what they do when good arguments can't be found - don't sink to their level. Claiming the thread is "boring" is also a way to try to discredit a thread that doesn't match their particular bias.
     
     
  #2040  
Old Posted Mar 6, 2015, 5:35 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,047
Quote:
Originally Posted by Buggys View Post
I've visited AB in winter, and don't think Calgary and Edmonton uses as much salt as we do.
Does anyone use as much friggin' road salt as Ottawa?
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 3:13 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.