HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Urban, Urban Design & Heritage Issues


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Mar 5, 2015, 8:00 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,645
Wow, this could be quite significant.

The idea of an official Plan update every 10 years instead of every five years will, I hope, come with a defined minimum planning horizon. I think that the City of Ottawa has coasted with the current 2031 limit (which is essentially the 2021 horizon pushed back 10 years as they realized that their growth projections were way out of whack) for far too long. A long-range vision of only 15 years isn't very long range at all.

I wonder if the clarification of ‘Minor Variances’ on zoning will prevent episodes like the EY Centre? As I have heard it, the property was zoned for a hotel with an integrated meeting space – with a ‘minor variance’ eliminating the need for the hotel portion. A blatant abuse of the process.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Urban, Urban Design & Heritage Issues
Forum Jump



Forum Jump


All times are GMT. The time now is 6:50 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.