HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    FMC Tower at Cira Centre South in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Philadelphia Skyscraper Diagram

Map Location
Philadelphia Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
  #1841  
Old Posted Feb 14, 2015, 5:57 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,537
Quote:
Originally Posted by mPhilly View Post
Is there really no small ped bridge to the park from FMC? Seems like a waste.
There isn't one in any of the renderings:

http://ciracentresouth.com/
     
     
  #1842  
Old Posted Feb 14, 2015, 6:17 PM
Cro Burnham's Avatar
Cro Burnham Cro Burnham is offline
Registered User
 
Join Date: Jun 2005
Location: delco
Posts: 2,396
Quote:
Originally Posted by mPhilly View Post
Sooo can't wait for this! 2400 Chestnut is a serious bummer in this view isn't it?

Is there really no small ped bridge to the park from FMC? Seems like a waste.
2400: It's OK. Totally bland, but OK. I'd rather have it than not. What I don't get is this: with the riverwalk bustling, and the whole Penn/Center City nexus fusing, 2400 is a prime node. Instead of using that lot in front for cars, why not build a restaurant/retail pad with a river vista to capture the growing pedestrian/biking traffic going north/south and along Chestnut Street? They'd sacrifice maybe twenty parking spots for some very lucrative commercial space, plus increase the appeal of the base of their building; besides, they have a below grade garage under the building. That surface lot seems to me to be a total missed opportunity and misallocation of prime real estate.

FMC/Penn park access: I imagine that access will be granted at the basement level (at grade for the park) underneath Walnut St., rather than over Walnut via pedestrian bridge.
     
     
  #1843  
Old Posted Feb 14, 2015, 6:39 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,537
Quote:
Originally Posted by Cro Burnham View Post
FMC/Penn park access: I imagine that access will be granted at the basement level (at grade for the park) underneath Walnut St., rather than over Walnut via pedestrian bridge.
mPhilly was actually asking about a bridge between FMC and Cira Green atop the garage (and not Penn Park)--there won't be a pedestrian bridge connecting them (according to the renderings).
     
     
  #1844  
Old Posted Feb 14, 2015, 6:55 PM
mPhilly mPhilly is offline
Registered User
 
Join Date: Jun 2012
Posts: 119
Quote:
Originally Posted by Philly Fan View Post
mPhilly was actually asking about a bridge between FMC and Cira Green atop the garage (and not Penn Park)--there won't be a pedestrian bridge connecting them (according to the renderings).
Maybe its a security concern or something.

As for 2400, I think this has been discussed on the forum before, but usually river fronting buildings are elongated perpendicular to the river to reduce view obstruction. 2400 bothers me with its long structure parallel to the river.

Anyway, can't wait to catch some sun in the summer on top of this garage! Does anybody have any idea when the park itself will open? By this summer?
     
     
  #1845  
Old Posted Feb 14, 2015, 7:00 PM
tdawg's Avatar
tdawg tdawg is offline
Registered User
 
Join Date: Jan 2007
Location: Astoria, NY
Posts: 2,985
This is a beautiful tower. Philly's skyline growth is on fire.
__________________
From my head via my fingers.
     
     
  #1846  
Old Posted Feb 14, 2015, 7:05 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,537
Quote:
Originally Posted by mPhilly View Post
Maybe its a security concern or something.
I did find this in an October 2013 article on Naked Philly:

Quote:
This one-acre green space will be connected to the tower by a skybridge, and will host outdoor events in this park in the sky.
http://www.ocfrealty.com/naked-philly/west-philly/third-cira-tower-go

But given that it doesn't appear in any of the current renderings, I guess it was either scrapped or deferred.
     
     
  #1847  
Old Posted Feb 14, 2015, 7:34 PM
Cro Burnham's Avatar
Cro Burnham Cro Burnham is offline
Registered User
 
Join Date: Jun 2005
Location: delco
Posts: 2,396
Quote:
Originally Posted by mPhilly View Post
Anyway, can't wait to catch some sun in the summer on top of this garage! Does anybody have any idea when the park itself will open? By this summer?
Won't this be a private park for the users of the complex?

Anyhow, I can see why there may not be a skybridge . . . why spend the extra money and waste rentable space in whatever random floor of the building it would be at when people can just access the elevator to the park from the first floor lobby? Building the skybridge would only really add slightly more convenience to the building residents, but would cost quite I bit probably and unnecessarily use up space for additional common areas, hallways, etc.
     
     
  #1848  
Old Posted Feb 14, 2015, 8:30 PM
domodeez domodeez is offline
Registered User
 
Join Date: Apr 2014
Posts: 518
From today at 1:30pm:













     
     
  #1849  
Old Posted Feb 14, 2015, 8:38 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,537
Quote:
Originally Posted by Cro Burnham View Post
Won't this be a private park for the users of the complex?
"The one acre elevated park will be semi-accessible to the public and offer a green space that will hold events like outdoor movies and concerts."

http://philly.curbed.com/tags/cira-green-at-fmc-tower

Whatever "semi-accessible" means. Perhaps only at certain times?
     
     
  #1850  
Old Posted Feb 14, 2015, 8:41 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
^^ You are the man! Thanks for the update!
     
     
  #1851  
Old Posted Feb 14, 2015, 9:02 PM
mPhilly mPhilly is offline
Registered User
 
Join Date: Jun 2012
Posts: 119
Quote:
Originally Posted by Philly Fan View Post
Whatever "semi-accessible" means. Perhaps only at certain times?
Yeah I don't know. The bottom left certainly looks like a public access point to me:

Credit: http://philly.curbed.com/archives/2014/0...ra-centre-souths-elevated-park-space.php

Not sure how they would prevent the public from going up there but allow FMC residents/employees (maybe keycard access?).

Most of the early news articles referred to it as a "public space." Obviously it would be a privately owned public space, but it certainly seems the plan is to have it open to the public. I guess we'll find out soon enough. One thing is for sure, never going to get the foot traffic in the renderings without public access.
     
     
  #1852  
Old Posted Feb 14, 2015, 9:12 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,537
Quote:
Originally Posted by mPhilly View Post
Most of the early news articles referred to it as a "public space." Obviously it would be a privately owned public space, but it certainly seems the plan is to have it open to the public. I guess we'll find out soon enough. One thing is for sure, never going to get the foot traffic in the renderings without public access.
I'm with you--I hope it IS accessible to the public. It certainly will be a unique space, and could be quite an attraction.
     
     
  #1853  
Old Posted Feb 14, 2015, 11:56 PM
MikeNigh MikeNigh is offline
Registered User
 
Join Date: Aug 2013
Location: Philadelphia, PA
Posts: 597
I don't think it will get overly used unless they add more greenery or hold events there.
     
     
  #1854  
Old Posted Feb 15, 2015, 12:49 AM
jsbrook jsbrook is offline
Registered User
 
Join Date: Aug 2014
Location: Bala Cynwyd
Posts: 3,658
Quote:
Originally Posted by mPhilly View Post
Maybe its a security concern or something.

As for 2400, I think this has been discussed on the forum before, but usually river fronting buildings are elongated perpendicular to the river to reduce view obstruction. 2400 bothers me with its long structure parallel to the river.

Anyway, can't wait to catch some sun in the summer on top of this garage! Does anybody have any idea when the park itself will open? By this summer?
2400 Chestnut blocks the view of a lot of the skyline behind it that would otherwise be viewable from this green space. As will 2400 Market, albeit (hopefully) via a more aesthetic building:

http://forum.skyscraperpage.com/showthread.php?t=214804

I think 2400 Market will be shorter than 2400 Chestnut so more behind it will hopefully be visible.
     
     
  #1855  
Old Posted Feb 16, 2015, 2:07 AM
hammersklavier's Avatar
hammersklavier hammersklavier is offline
Philly -> Osaka -> Tokyo
 
Join Date: Apr 2008
Location: The biggest city on earth. Literally
Posts: 5,630
Quote:
Originally Posted by Cro Burnham View Post
2400: What I don't get is this: with the riverwalk bustling, and the whole Penn/Center City nexus fusing, 2400 is a prime node. Instead of using that lot in front for cars, why not build a restaurant/retail pad with a river vista to capture the growing pedestrian/biking traffic going north/south and along Chestnut Street? They'd sacrifice maybe twenty parking spots for some very lucrative commercial space, plus increase the appeal of the base of their building; besides, they have a below grade garage under the building. That surface lot seems to me to be a total missed opportunity and misallocation of prime real estate.
You know, I walked by that building the other day and was thinking the same thing. Total wasted opportunity along Chestnut, especially now. Then I realized that the garage's only entrance is from Chestnut. So you'd have to make a new entrance to the garage (i.e. from 24th). Which would probably require a thorough new renovation of at least the lobby levels and lower. Wasn't the building last renovated a little less than a decade ago?

ETA: I'm pretty sure the loading dock faces 24th Street. That would mean that a new parking entrance could feasibly be made one of two ways:

1. Wipe some (revenue-earning) ground-floor office space. Their willingness to do that would probably be a function of how occupied that space is, and how much more they can get from commercial space facing Chestnut. In other words: not very high. (Unless they landed like a big box tenant or something.)

2. Get an shared easement with the owner of the parking lot next door. The basic idea is that one would enter the garage from that lot, and that the parking structure doubtless required for any redevelopment of that parcel (wasn't the last proposal on it a Richard Meyer building?) would be required to share an entrance with 2400 Chestnut's. Easement law does exist (it was largely developed to construct canals and, later, railroads), so this isn't such a farfectched idea from a purely legal perspective. But I don't think I've ever seen multiple developments share a garage entrance.

And a third option: Liquidate the parking spaces. (For what?)
__________________
Urban Rambles | Hidden City

Who knows but that, on the lower levels, I speak for you?’ (Ralph Ellison, Invisible Man)

Last edited by hammersklavier; Feb 16, 2015 at 2:24 AM. Reason: I am apparently a drunk sober and a drunker drunk
     
     
  #1856  
Old Posted Feb 16, 2015, 3:33 AM
brenster brenster is offline
i heart philly
 
Join Date: Sep 2006
Location: Dillsburg,PA
Posts: 284
__________________
I heart Philly
     
     
  #1857  
Old Posted Feb 16, 2015, 6:23 PM
hammersklavier's Avatar
hammersklavier hammersklavier is offline
Philly -> Osaka -> Tokyo
 
Join Date: Apr 2008
Location: The biggest city on earth. Literally
Posts: 5,630
Quote:
Originally Posted by brenster View Post
Just as a heads-up, make sure you have the appropriate image file extension in the link when you post images.
__________________
Urban Rambles | Hidden City

Who knows but that, on the lower levels, I speak for you?’ (Ralph Ellison, Invisible Man)
     
     
  #1858  
Old Posted Feb 16, 2015, 7:02 PM
boxbot's Avatar
boxbot boxbot is offline
Registered User
 
Join Date: Feb 2014
Location: Delco., Pa.
Posts: 842
This thing is flying. Looking at the photo dates, it looks like the 2nd floor of the core started 1/24/15, the 3rd floor started 2/2/15, the 4th floor started 2/7/15 and now the 5th floor on 2/14 - averaging a week per floor or so.
     
     
  #1859  
Old Posted Feb 17, 2015, 7:37 PM
Cro Burnham's Avatar
Cro Burnham Cro Burnham is offline
Registered User
 
Join Date: Jun 2005
Location: delco
Posts: 2,396
Quote:
Originally Posted by hammersklavier View Post
You know, I walked by that building the other day and was thinking the same thing. Total wasted opportunity along Chestnut, especially now. Then I realized that the garage's only entrance is from Chestnut. So you'd have to make a new entrance to the garage (i.e. from 24th). Which would probably require a thorough new renovation of at least the lobby levels and lower. Wasn't the building last renovated a little less than a decade ago?

ETA: I'm pretty sure the loading dock faces 24th Street. That would mean that a new parking entrance could feasibly be made one of two ways:

1. Wipe some (revenue-earning) ground-floor office space. Their willingness to do that would probably be a function of how occupied that space is, and how much more they can get from commercial space facing Chestnut. In other words: not very high. (Unless they landed like a big box tenant or something.)

2. Get an shared easement with the owner of the parking lot next door. The basic idea is that one would enter the garage from that lot, and that the parking structure doubtless required for any redevelopment of that parcel (wasn't the last proposal on it a Richard Meyer building?) would be required to share an entrance with 2400 Chestnut's. Easement law does exist (it was largely developed to construct canals and, later, railroads), so this isn't such a farfectched idea from a purely legal perspective. But I don't think I've ever seen multiple developments share a garage entrance.

And a third option: Liquidate the parking spaces. (For what?)
You got to figure retail on chestnut would make more than basement office space on 24th.
     
     
  #1860  
Old Posted Feb 19, 2015, 9:35 PM
domodeez domodeez is offline
Registered User
 
Join Date: Apr 2014
Posts: 518
Nice update from today at 12:30pm:





     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 7:48 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.