HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    FMC Tower at Cira Centre South in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Philadelphia Skyscraper Diagram

Map Location
Philadelphia Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
  #1821  
Old Posted Feb 5, 2015, 6:57 PM
RWSMADCONC RWSMADCONC is offline
Registered User
 
Join Date: Feb 2013
Posts: 54
Quote:
Originally Posted by Flyers2001 View Post
I thought it was LF Driscoll, I could be wrong.
Turner Construction Company
     
     
  #1822  
Old Posted Feb 5, 2015, 6:58 PM
RWSMADCONC RWSMADCONC is offline
Registered User
 
Join Date: Feb 2013
Posts: 54
Quote:
Originally Posted by TallCoolOne View Post
^^Great pics, thanks! That thing is flying now.
Third lift of core concrete being placed today
     
     
  #1823  
Old Posted Feb 5, 2015, 7:04 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,524
Quote:
Originally Posted by RWSMADCONC View Post
Third lift of core concrete being placed today
So how many lifts of core concrete per week or per month do you think this will be averaging for the foreseeable future?
     
     
  #1824  
Old Posted Feb 5, 2015, 7:35 PM
domodeez domodeez is offline
Registered User
 
Join Date: Apr 2014
Posts: 518
From today at 2pm:







     
     
  #1825  
Old Posted Feb 5, 2015, 7:36 PM
domodeez domodeez is offline
Registered User
 
Join Date: Apr 2014
Posts: 518
Significant progress beyond the core in the last few days.
     
     
  #1826  
Old Posted Feb 5, 2015, 7:38 PM
kraggman's Avatar
kraggman kraggman is offline
Always Lookin' Up
 
Join Date: Jan 2007
Location: Right Coast
Posts: 477
WOW !! Fast isn't the word for this progress.
Nice pics dom !!
     
     
  #1827  
Old Posted Feb 6, 2015, 2:46 PM
RWSMADCONC RWSMADCONC is offline
Registered User
 
Join Date: Feb 2013
Posts: 54
Quote:
Originally Posted by Philly Fan View Post
So how many lifts of core concrete per week or per month do you think this will be averaging for the foreseeable future?
Forms are being jacked to next lift basically right now. It takes about 45 minutes to raise this deal--it has to rise 14 ft 4 in each time--each lift is a floor. Reinforcing will be set starting right away.

Won't comment on pace until the whole system is in place (there is a lot yet to assemble, including the pump line and placing boom) and running as it should. Will let everyone know more in a couple of weeks.

And Dom's photos are great!!!!
     
     
  #1828  
Old Posted Feb 6, 2015, 2:54 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,524
Quote:
Originally Posted by RWSMADCONC View Post
Forms are being jacked to next lift basically right now. It takes about 45 minutes to raise this deal--it has to rise 14 ft 4 in each time--each lift is a floor. Reinforcing will be set starting right away.

Won't comment on pace until the whole system is in place (there is a lot yet to assemble, including the pump line and placing boom) and running as it should. Will let everyone know more in a couple of weeks.

And Dom's photos are great!!!!
Thanks very much! Your insights are fascinating, and greatly appreciated!
     
     
  #1829  
Old Posted Feb 6, 2015, 3:04 PM
japmes japmes is offline
Registered User
 
Join Date: Jul 2006
Posts: 227
I wish I was in the concrete business these days.
     
     
  #1830  
Old Posted Feb 7, 2015, 12:36 AM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,469
Update from Phillyliving Blog. Looks like they're outdated on their height information.

http://www.phillyliving.com/blog/fmc-tower-begins-to-climb-out-of-its-hole-at-30th-and-walnut.html
     
     
  #1831  
Old Posted Feb 7, 2015, 2:28 PM
alasi alasi is offline
Registered User
 
Join Date: Mar 2008
Posts: 202
Here's to hoping they do at least a floor a week. Means they will top off in the middle of next January.
     
     
  #1832  
Old Posted Feb 7, 2015, 9:05 PM
domodeez domodeez is offline
Registered User
 
Join Date: Apr 2014
Posts: 518
From today at 2pm:














     
     
  #1833  
Old Posted Feb 8, 2015, 5:07 AM
Philly-Drew's Avatar
Philly-Drew Philly-Drew is offline
Φιλαδέλφεια
 
Join Date: Feb 2005
Location: NoLibs
Posts: 1,395
Thanks for the pics. Good stuff!
__________________
"Imagine all the people, living life in peace." :Lennon
     
     
  #1834  
Old Posted Feb 9, 2015, 1:40 PM
1487 1487 is offline
BANNED
 
Join Date: Jun 2014
Posts: 3,401
This is already very visible from I-76. I went past this site and 33rd and chestnut over weekend- so much going on in that vicinity in terms of construction. This will really fill in a huge gap west of the river.
     
     
  #1835  
Old Posted Feb 12, 2015, 1:24 AM
domodeez domodeez is offline
Registered User
 
Join Date: Apr 2014
Posts: 518
More foundational work continuing beyond the core this week (from 3:30 today):




     
     
  #1836  
Old Posted Feb 12, 2015, 1:38 AM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,469
Update from Building Philly



https://www.facebook.com/BuildingPhilly
     
     
  #1837  
Old Posted Feb 13, 2015, 5:22 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,469
Update from Building Philly



https://www.facebook.com/BuildingPhilly
     
     
  #1838  
Old Posted Feb 14, 2015, 2:01 PM
GarCastle GarCastle is offline
Registered User
 
Join Date: Feb 2006
Posts: 469
I'm still wondering what that awkward ramp is going to do, on top of the garage. Is that going to interface into the FMC tower and let folks drive in or something? Deliveries for the 2nd company of FMC? /shrug

Cheers,
G.
__________________
"I don't need the city, it never cared for me." - Neuroticfish.
     
     
  #1839  
Old Posted Feb 14, 2015, 3:29 PM
Philly Fan Philly Fan is offline
Registered User
 
Join Date: Feb 2013
Posts: 2,524
Quote:
Originally Posted by GarCastle View Post
I'm still wondering what that awkward ramp is going to do, on top of the garage. Is that going to interface into the FMC tower and let folks drive in or something? Deliveries for the 2nd company of FMC? /shrug

Cheers,
G.
That's going to be a sloped area of Cira Green, the park that will be on top of the garage (and there actually will be a gap between the garage and the FMC Tower--they won't be connected above grade):



http://ciracentresouth.com/images/cira-green.jpg
     
     
  #1840  
Old Posted Feb 14, 2015, 4:40 PM
mPhilly mPhilly is offline
Registered User
 
Join Date: Jun 2012
Posts: 119
Quote:
Originally Posted by Philly Fan View Post
That's going to be a sloped area of Cira Green, the park that will be on top of the garage (and there actually will be a gap between the garage and the FMC Tower--they won't be connected above grade):
Sooo can't wait for this! 2400 Chestnut is a serious bummer in this view isn't it?

Is there really no small ped bridge to the park from FMC? Seems like a waste.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 7:09 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.