Quote:
Originally Posted by outoftheice
Speaking of the Greenway, I thought the plan for that was to extend it to the west as far as 8th Street W so that it would link with the busiest pedestrian corridor?? Am I just incorrectly remembering things or was the scope of the project cut back at some point?
|
If I recall there was talk of extending all the way to Sunalta at one point. I believe they never secured funding past 4th Street SW though. Doubt we will ever see it.
I am happy with the sections they completed, as it has the most room and required the most design-love compared to other stretches, but I wish we could complete these pedestrian projects faster, they seem to take forever to complete for being so small projects. So many narrow - but high-trafficked - areas on inner-city sidewalks that will take decades to get to at this pace.
17th Ave (essentially from Macleod all the way to 14th), 4th Street, 5th Street could all use some serious love for a good proportion of their length. Even if it is not very fancy, just some wider sidewalks and a few trees would do wonders.