Quote:
Originally Posted by Orlando
Tmac, welcome back!
Stenar, how do you know that?
|
To me it makes a whole lot more sense that EPAC isn't supporting 111. If EPAC were supporting 111 in anyway, I would think that the elevator shaft would be placed more to the north to balance out the weight that it is ultimately supporting via the roof. By putting the elevator shaft directly in the center of the tower (accounting to the dimensions above the ceiling of EPAC, not those simply at ground level) it makes the building symmetrical as it relates to the elevator shaft and thus puts equal weight around rather than having unequal weight which, to me as a non-architect, would seem to weaken the structure rather than strengthen it.
Thus ultimately, the placement of where the shaft is now makes me believe that 111 will be cantilevered over EPAC but won't be physically supported by it.