Quote:
Originally Posted by lightrail
I agree with avoiding having passengers using two platforms for trains serving the same stations when possible. Or at least have it cross-platform.
I saw this happen in New York. I was at 50th Street Station on the Seventh Avenue Subway. This station has four platforms, two on the top level and two on the lower level. Heading southbound the C local trains use the upper platforms with the A Express passing through on the express track non-stop, and the E local trains use the lower platforms. This is operation as the E trains cannot access the upper tracks from the 59th Street subway that is uses to get to Queens. But it does mean I have to pick which platform to wait on with no-idea of how long I have to wait for the trains. After midnight the trains run every 20 minutes, so that's quite a gap if you miss one.
|
Even with trains interlining to Production Way - University, you could keep the station platforms assigned to how they were assigned. Both the "Expo" line and "Millennium" line heading towards Production Way would have passed through Lougheed (westbound) on the Center Track. So one westbound platform. Plus the Platforms for Westbound travel, and travel towards Braid would be the same platforms as they are now (so keeping change at a minimum). The new Platform would be for travel to the new destination.
However, in the document posted, at Lougheed there is no sign for "Platform 3". So does that mean they are going to 2 platform operation?
With the switches set up the way they are, it looks like they have to use the far North Platform for trains to or from Coquitlam. So if they are going with 2 platform operation, then all transfers between Coquitlam and New Westminster will be up and down stairs? And backwards. To keep all trains heading east and west on their respective platforms, The North Platform would be East Bound and the South Platform would be Westbound.
To me it sounds like they are throwing the plan out the window just to accommodate some SFU students.
Wouldn't it be much easier to just
change the way the bus works? Have the SFU bus change operation to operating a one way loop.
Have the bus leave Lougheed station, head to Production Way, pick up people there, go to SFU. From SFU you head to Burquitlam station, then to Lougheed. Not only then do you not need to make a transfer if you arrive from the Expo line, but you don't need to transfer to Skytrain for one stop if you arrive on a bus at Lougheed (like the Rapid Bus). Then you can chose what to do. If you want to make a single transfer, get on the bus at Lougheed, if you want to ride the bus for as little as possible get on at Production Way, get off at Burquitlam. And if you did do the latter, all your Skytrain Transfers at Lougheed would be Cross Platform (assuming they go with the original platform Config).
The bus would also work as a very frequent local service along North Road. Yes, to get home you would have to get off Skytrain at Burquitlam, but the bus would be twice as frequent with the same number of drivers than if it were two direction.