Quote:
Originally Posted by airhero
I'm glad you responded Makid because I was just spewing out nonfacts. You have a good grasp of what's going on. I do wonder though how large the cch's are in cities with convention centers similar in size to the Salt Palace.
|
No worries Airhero, looking around at CCHs at similar sized convention centers they range from 900 to 1200 rooms.
One thing that should be noted, if the CCH is built with a direct connection to the Convention Center (not across the street), the meeting space should be considered as expansion space for the Convention Center as it will be controlled by the County and booked through SMG (County authorized manager).
An additional 80,000 sq ft (800 rooms) to 100,000 sq ft (1,000 rooms) would move the SPCC up a couple of levels in space, passing Denver and San Diego in total space (Exhibit space + Meeting space only) but still behind them for exhibit space (50,000 sq ft behind Denver and 100,000 sq ft behind San Diego). We currently have more meeting space than either Denver and San Diego (their Ballrooms are larger but even counting Ballrooms the SPCC still has more meeting space than either Denver or San Diego).
The reason for the meeting space is that there are a lot of conventions that have smaller trade shows but have many break out sessions. These conventions currently pass SLC by due to the lack of a large scale CCH. SLC has also been told that if they get a large CCH, they will also receive larger conventions from the group that owns Outdoor Retailer, as they love the location of SLC.
They would move these conventions from Las Vegas and bring them here.
Now, regarding the boom...As Comrade stated, Utah as a whole is booming in birth rates. These won't have an affect on anything on than homes for 15 to 20 years. The only way we would be able to have a more visible construction boom in commercial and housing is with migration to SLC. For this to happen, we would need major corporate expansions or relocations. Currently we are seeing smaller corporate expansions (few hundred at a time or a couple of thousand over 5 years). We would need the highest values in a shorter time frame.
I think we are getting there but without a larger push, it will still be a few years (5-7) before it will be visible on a large scale. We will see if we are increasing faster once 111 is complete. If 151 starts either before 111 is complete or right after, it will signal that we are on the next phase of the boom. If there is even a 3 year gap between the completion of 111 and the start of 151, this shows we are getting there but haven't yet hit the growth threshold for it to be classified as a boom as it could just be natural growth.