  #7701  
Old Posted Jan 16, 2015, 5:00 AM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 766
Video from this morning showing a bit of Lougheed side platform and where the outbound guideway joins the existing inbound guideway.

It's probably very hard to see, but where the guideways join there's some silver bolts in the centre for the LIM rail. They've also installed some more platform-level glass for the side platform.
     
     
  #7702  
Old Posted Jan 17, 2015, 12:56 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by officedweller View Post
Maybe the frequency currently allows reversing on the M-Line mainline, and in future, when M-Line frequency increases to Expo Line levels, they'll extend it to that pocket track near Holdem - or truncate it at Lougheed.



For the left turn lanes. That wouldn't have happened if they had accepted a "side-of-road" alignment.
The problem with a "side-of-road" alignment during the planning stages was letting either Burnaby or Coquitlam have jurisdiction of the tracks on North Road - and be responsible for the extra costs of repairing the roads during construction.

Since they wouldn't let each other 'win' owning the tracks, the province decreed a line down the middle of North Road - which is also the boundary line between the cities. The Skytrain construction also required widening North Road and relocating the road one lane westwards into Burnaby, so that city had to pay for the extra roadwork costs on the southbound side, and Coquitlam had to pay for extra Northbound roadwork on their side of North Road.
Persnikity people will say that one track is in Burnaby, the other in Coquitlam until it turns onto Clarke, at which time it becomes all-Coquitlam.

A similar Burnaby vs. Coquitlam pissing match helps explain why there isn't (and likely won't be) a Cameron Station on the line.

Last edited by jsbertram; Jan 19, 2015 at 2:17 AM.
     
     
  #7703  
Old Posted Jan 20, 2015, 10:07 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,578
Agreed - if they could have agreed to a side, it would have turned out better.

*************

More Webcam pics at Lincoln Station - 8:15 am this morning
- starting to lay guideway section within the station.
This is why it's cheap to build a side platform station.


http://wcs.pbaeng.com/projects/R1_Transit


http://wcs.pbaeng.com/projects/R1_Transit


http://wcs.pbaeng.com/projects/R1_Transit


http://wcs.pbaeng.com/projects/R1_Transit
     
     
  #7704  
Old Posted Jan 21, 2015, 2:56 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,076
I keep invisioning someone travelling the guideway end to end in a bicycle.
     
     
  #7705  
Old Posted Jan 21, 2015, 5:28 PM
Large Cat's Avatar
Large Cat Large Cat is offline
Vancouver Bus Driver
 
Join Date: Oct 2014
Location: Vancouver, BC
Posts: 396
Quote:
Originally Posted by MIPS View Post
I keep invisioning someone travelling the guideway end to end in a bicycle.
That would be fun

If only they would tack a cycle track on to the side of all above-ground guideway
     
     
  #7706  
Old Posted Jan 21, 2015, 6:55 PM
TransitJack TransitJack is offline
Registered User
 
Join Date: Jul 2009
Posts: 443
Forgive me for being a bit confused...

So, the Truncated M-Line service is possibly planned to terminate at Production Way (I assume to accommodate the SFU traffic ex Expo Line Branch)? If so, then is the extra platform at Lougheed TC even required anymore?

Sorry, I've tried to follow along... maybe I missed this discussion already.
     
     
  #7707  
Old Posted Jan 21, 2015, 7:02 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,782
(deleted)
     
     
  #7708  
Old Posted Jan 21, 2015, 8:17 PM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by TransitJack View Post
Forgive me for being a bit confused...

So, the Truncated M-Line service is possibly planned to terminate at Production Way (I assume to accommodate the SFU traffic ex Expo Line Branch)? If so, then is the extra platform at Lougheed TC even required anymore?

Sorry, I've tried to follow along... maybe I missed this discussion already.
How this works is explained here http://skyscraperpage.com/forum/showpost.php?p=4758619&postcount=1495

Though even then, the "third platform" would have only been used for trains terminating or starting there, presumably because there was no guarantee that the skytrain induction rail was going to be used as part of whatever may have continued from that point. So while there was certainly thinking ahead in having the platform, it may still not get used for much. The Stadium station's third platform is used for events/training, but not much else.

     
     
  #7709  
Old Posted Jan 21, 2015, 10:43 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by MIPS View Post
I keep invisioning someone travelling the guideway end to end in a bicycle.
I'd rather be ON a bicycle.

or an old vespa:
     
     
  #7710  
Old Posted Jan 21, 2015, 10:47 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Large Cat View Post
That would be fun

If only they would tack a cycle track on to the side of all above-ground guideway
or attach a bicycle storage car to the train:
     
     
  #7711  
Old Posted Jan 21, 2015, 11:04 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by TransitJack View Post
Forgive me for being a bit confused...

So, the Truncated M-Line service is possibly planned to terminate at Production Way (I assume to accommodate the SFU traffic ex Expo Line Branch)? If so, then is the extra platform at Lougheed TC even required anymore?

Sorry, I've tried to follow along... maybe I missed this discussion already.
If the RFEOI is correct, Expo line trains will run between Waterfront and King George (as they always have) or Waterfront and Production/SFU, with the split happening at Columbia.

Millennium line trains will run between VCC / Clarke and Lafarge /Doug College using today's VCC to Lougheed segment and the new Evergreen extension from Lougheed to Doug College.


To switch between Expo trains and Millennium trains, you would need to change at Broadway/Commercial or Lougheed.

It appears there won't be an 'evergreen line' nor 'evergreen line trains' when the Evergreen extension opens next year.
     
     
  #7712  
Old Posted Jan 23, 2015, 1:19 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,578
Quote:
Originally Posted by TransitJack View Post
Forgive me for being a bit confused...

So, the Truncated M-Line service is possibly planned to terminate at Production Way (I assume to accommodate the SFU traffic ex Expo Line Branch)? If so, then is the extra platform at Lougheed TC even required anymore?

Sorry, I've tried to follow along... maybe I missed this discussion already.
Not at the moment but in future it would be.

It would not be necessary if the configuration was just a single centre platform like at Bridgeport - but a configuration like that would get overcrowded in future (think Metrotown Station)

With the platforms, as built, the wrong-railing is necessary to get trains from Coquitlam and trains from Braid to the same "Vancouver-bound" platform, for the convenience of passengers headed to Vancouver

This is the operational plan.
The only changes that will result is that the blue line will continue through the middle to Production Way Station (instead of switching to the south platform to reverse), and the yellow line will originate from the west from Production Way Station.

     
     
  #7713  
Old Posted Jan 24, 2015, 12:15 AM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,677
Quote:
Originally Posted by Kisai View Post
The photographer missed an apostrophe in the "Photographers (sic) identity not given by request." watermark. This should read: "Photographer's identity not given by request.", though that's still an awkward sentence.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
     
     
  #7714  
Old Posted Jan 24, 2015, 5:06 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
Looking again at that switching diagram, I'm still concerned that it's going to compromise the ability to run trains at high frequency.
     
     
  #7715  
Old Posted Jan 24, 2015, 7:12 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,782
Quote:
Originally Posted by red-paladin View Post
Looking again at that switching diagram, I'm still concerned that it's going to compromise the ability to run trains at high frequency.
You have to remember that it's station dwell time that constrains capacity. Once you get away from the stations there's actually a lot of room between trains.
     
     
  #7716  
Old Posted Jan 24, 2015, 7:48 AM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
They'll probably have to slow way down to make that tight curve anyways.
     
     
  #7717  
Old Posted Jan 24, 2015, 8:14 AM
Meraki Meraki is offline
Registered User
 
Join Date: Mar 2012
Posts: 473
Quote:
Originally Posted by red-paladin View Post
Looking again at that switching diagram, I'm still concerned that it's going to compromise the ability to run trains at high frequency.
Entering Lougheed is already arguably the slowest station approach on the Millennium Line due to the switches, particularly inbound from Braid. I assume once the Evergreen Line is up all trains will be just as slow around Lougheed, regardless of direction. It won't be an impact on frequency, but passing through Lougheed will take noticeably longer than other stations on the line.
     
     
  #7718  
Old Posted Jan 24, 2015, 9:11 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,076
Quote:
Originally Posted by GeeCee View Post
They'll probably have to slow way down to make that tight curve anyways.
That's nothing for a SkyTrain thanks to the articulating bogies. It can make that doing 50.
Methinks that once that section of the line is completed they'll running trains through the switches in a number of combinations to fine tune the new signalling pattern.
     
     
  #7719  
Old Posted Jan 24, 2015, 6:34 PM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 766
Quote:
Originally Posted by MIPS View Post
That's nothing for a SkyTrain thanks to the articulating bogies. It can make that doing 50.
Methinks that once that section of the line is completed they'll running trains through the switches in a number of combinations to fine tune the new signalling pattern.
Also keep in mind there's another set of switches just before Burquitlam station to get trains back to their correct routing. Normally that wouldn't slow things down, but these switches will be being used by all trains.
     
     
  #7720  
Old Posted Jan 24, 2015, 6:37 PM
SOSS SOSS is offline
Registered User
 
Join Date: Jan 2014
Posts: 661
Another week with no tunnel boring. They are active on snake hill.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:59 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.