  #461  
Old Posted Jan 18, 2015, 7:08 AM
Highrise_Mike's Avatar
Highrise_Mike Highrise_Mike is offline
Registered User
 
Join Date: Jan 2009
Location: SoJo, UT
Posts: 232
Thanks for the picture update! It looks like the 111 core is already making its way past the UPAC roof. Its moving along nicely considering it is all concrete work.
Reply With Quote
     
     
  #462  
Old Posted Jan 18, 2015, 11:30 PM
SLC Projects's Avatar
SLC Projects SLC Projects is offline
Bring out the cranes...
 
Join Date: Dec 2006
Location: Salt Lake City
Posts: 6,108
The speed of the Theater going up compare to 111 South Main is night and day.
__________________
1. "Wells Fargo Building" 24-stories 422 FT 1998
2. "LDS Church Office Building" 28-stories 420 FT 1973
3. "111 South Main" 24-stories 387 FT 2016
4. "99 West" 30-stories 375 FT 2011
5. "Key Bank Tower" 27-stories 351 FT 1976
Reply With Quote
     
     
  #463  
Old Posted Jan 20, 2015, 4:07 PM
Dallas Snob Dallas Snob is offline
Verticle
 
Join Date: Jun 2006
Location: West Palm Beach, Florida
Posts: 319
Quote:
Originally Posted by SLC Projects View Post
The speed of the Theater going up compare to 111 South Main is night and day.
That's because 111 Main isn't "going up". Come on, let's be serious. It's painfully obvious that this building is in trouble. Either it is being redesigned so is on hold until the blueprints are ready, or, Goldman has decided not to expand, or it just isn't going to happen. But the reality is, it is not currently "going up". It makes me sad to say it, but if it IS under construction, it's the strangest way of constructing a tower I've ever seen. Nothing...and I mean 'NOTHING" about this construction site says to me that this building is under construction.
Reply With Quote
     
     
  #464  
Old Posted Jan 20, 2015, 4:19 PM
jubguy3's Avatar
jubguy3 jubguy3 is offline
Registered User
 
Join Date: May 2014
Location: SL,UT
Posts: 984
Do you pass by it every day? It is most obviously under construction... You can't expect a consistent construction speed. It will take a little, but the building is most definitely not in trouble.
Reply With Quote
     
     
  #465  
Old Posted Jan 20, 2015, 4:23 PM
UTPlanner's Avatar
UTPlanner UTPlanner is offline
Registered User
 
Join Date: Dec 2007
Posts: 941
The office building is under construction. There have been 5 city building inspections recorded just since January began. If a building was not under construction, there would not be any changes proceeding and thus inspections would not be necessary. It may be difficult to see the construction from Dallas but I can tell you that it is happening.

Also, the future tenants have already been meeting with city officials about their tenant improvement plans. I won't mention names right now but they are all tenants that you have heard a great deal about.
Reply With Quote
     
     
  #466  
Old Posted Jan 20, 2015, 11:25 PM
utenation's Avatar
utenation utenation is offline
Registered User
 
Join Date: Apr 2008
Location: Sandy, Utah
Posts: 265
Quote:
Originally Posted by Dallas Snob View Post
That's because 111 Main isn't "going up". Come on, let's be serious. It's painfully obvious that this building is in trouble. Either it is being redesigned so is on hold until the blueprints are ready, or, Goldman has decided not to expand, or it just isn't going to happen. But the reality is, it is not currently "going up". It makes me sad to say it, but if it IS under construction, it's the strangest way of constructing a tower I've ever seen. Nothing...and I mean 'NOTHING" about this construction site says to me that this building is under construction.

You keep saying this over and over despite all the evidence proving otherwise. Looks like it's moving just fine to me.. I work downtown and have watched the progress since day 1...
Reply With Quote
     
     
  #467  
Old Posted Jan 20, 2015, 11:49 PM
jubguy3's Avatar
jubguy3 jubguy3 is offline
Registered User
 
Join Date: May 2014
Location: SL,UT
Posts: 984
All of the work is happening inside the plastic in UPAC. Walk by some day...
Reply With Quote
     
     
  #468  
Old Posted Jan 21, 2015, 12:07 AM
UTPlanner's Avatar
UTPlanner UTPlanner is offline
Registered User
 
Join Date: Dec 2007
Posts: 941
I walked by today and there were lots of people working all over the site including the area of the office tower. It may not look as if it is progressing because it has mostly only been concrete work completed thus far. The footings and foundation work for this building is far more complex then what was required for the adjacent theater. Because of that the steel was able to rise on the theater site already. The concrete work on the office tower section has reached about street level from what I saw this afternoon. I would think that steel will be coming along shortly.

This office project is being built by the Property Reserve Inc. aka the LDS Church which means that financing is not an issue. Further, they already have high profile tenants ready to occupy space. There is no reason to think that this building is not already moving forward and will continue to do so.
Reply With Quote
     
     
  #469  
Old Posted Jan 21, 2015, 12:27 AM
SLC Projects's Avatar
SLC Projects SLC Projects is offline
Bring out the cranes...
 
Join Date: Dec 2006
Location: Salt Lake City
Posts: 6,108
Quote:
Originally Posted by UTPlanner View Post

This office project is being built by the Property Reserve Inc. aka the LDS Church which means that financing is not an issue. Further, they already have high profile tenants ready to occupy space. There is no reason to think that this building is not already moving forward and will continue to do so.
Can you share with us on the % of space leased so far at 111? Hopefully there's enough office demand right now to fill up 111, with even more to help push 151 forward.
__________________
1. "Wells Fargo Building" 24-stories 422 FT 1998
2. "LDS Church Office Building" 28-stories 420 FT 1973
3. "111 South Main" 24-stories 387 FT 2016
4. "99 West" 30-stories 375 FT 2011
5. "Key Bank Tower" 27-stories 351 FT 1976
Reply With Quote
     
     
  #470  
Old Posted Jan 21, 2015, 4:09 AM
airhero airhero is offline
Registered User
 
Join Date: Dec 2006
Posts: 968
Quote:
Originally Posted by Dallas Snob View Post
That's because 111 Main isn't "going up". Come on, let's be serious. It's painfully obvious that this building is in trouble. Either it is being redesigned so is on hold until the blueprints are ready, or, Goldman has decided not to expand, or it just isn't going to happen. But the reality is, it is not currently "going up". It makes me sad to say it, but if it IS under construction, it's the strangest way of constructing a tower I've ever seen. Nothing...and I mean 'NOTHING" about this construction site says to me that this building is under construction.
You'd have to see it in person to be able to properly gauge how much work is happening. Like UTPlanner said, mostly foundation work. When I saw the site just before Christmas, the whole perimeter of the tower around the core was still a 30-40 foot hole. When I saw it over this last weekend (slightly less than 4 weeks later) it was built up to ground level. That's significant progress, especially considering the holidays that happened during that timeframe.
Reply With Quote
     
     
  #471  
Old Posted Jan 21, 2015, 5:41 PM
UTPlanner's Avatar
UTPlanner UTPlanner is offline
Registered User
 
Join Date: Dec 2007
Posts: 941
I have no idea what the percentage is at the moment. I have only seen the names of 2 different well known companies meeting with different city divisions about their plans. Until they submit their plans I will not know just how much space they are developing.
Reply With Quote
     
     
  #472  
Old Posted Jan 22, 2015, 3:26 AM
Future Mayor's Avatar
Future Mayor Future Mayor is offline
Vote for me in 2019!
 
Join Date: Jun 2007
Location: Salt Lake City, UT
Posts: 4,803
Yeah, I'm not sure how an ever increasingly tall elevator core signifies that the building isn't rising.
Reply With Quote
     
     
  #473  
Old Posted Jan 22, 2015, 4:42 AM
jubguy3's Avatar
jubguy3 jubguy3 is offline
Registered User
 
Join Date: May 2014
Location: SL,UT
Posts: 984
Most of the work right now is happening inside the UPAC though... If someone can get a pic from Reagent street that would be nice

EDIT: oops, what about detergent street?
Reply With Quote
     
     
  #474  
Old Posted Jan 22, 2015, 6:35 AM
SLC Projects's Avatar
SLC Projects SLC Projects is offline
Bring out the cranes...
 
Join Date: Dec 2006
Location: Salt Lake City
Posts: 6,108
Too bad there isn't a live cam like what 222 south main had as it went up.
__________________
1. "Wells Fargo Building" 24-stories 422 FT 1998
2. "LDS Church Office Building" 28-stories 420 FT 1973
3. "111 South Main" 24-stories 387 FT 2016
4. "99 West" 30-stories 375 FT 2011
5. "Key Bank Tower" 27-stories 351 FT 1976
Reply With Quote
     
     
  #475  
Old Posted Jan 22, 2015, 3:49 PM
jedikermit's Avatar
jedikermit jedikermit is offline
Registered User
 
Join Date: Aug 2006
Location: Salt Lake City, UT
Posts: 2,259
Here's a view from the Regent Street parking terrace from the Downtown Alliance and Jesse Dean's Instagram/Twitter feeds:

__________________
Loving Salt Lake City. Despite everything, and because of everything.
Reply With Quote
     
     
  #476  
Old Posted Jan 22, 2015, 5:45 PM
eagleye1144 eagleye1144 is offline
Registered User
 
Join Date: Jul 2011
Location: Springville, UT
Posts: 12
If you go to http://111mainslc.com/ you will find a new picture of the tower on the home page
Reply With Quote
     
     
  #477  
Old Posted Jan 22, 2015, 6:00 PM
Old&New's Avatar
Old&New Old&New is offline
Registered User
 
Join Date: Jun 2011
Posts: 1,537


Definitely an improvement. I like the all glass foyer. Judging by the looks of it, the tower will in-fact hang from the roof, and there will be no steel rising below the third floor.









Last edited by Old&New; Jan 22, 2015 at 6:17 PM.
Reply With Quote
     
     
  #478  
Old Posted Jan 22, 2015, 6:51 PM
LumberJack LumberJack is offline
BANNED
 
Join Date: Jan 2015
Posts: 90
I like how the tower comes right up next to the sidewalk and how it gives a close feel to the street level. I also like the sharp clean corners of the tower, and also the clear glass lobby look makes it feel welcoming.
Reply With Quote
     
     
  #479  
Old Posted Jan 22, 2015, 7:10 PM
Makid Makid is offline
Registered User
 
Join Date: Jun 2006
Posts: 2,107
I love the column free floor plate design. It does help make the floors feel more open.

Also, with the look of the lobby, I do agree that the floors will be hanging from the roof and supported by the core which is currently rising.

The lobby look with just straight glass along 1st South and Main is just a very great look and does help this building to stand out.
Reply With Quote
     
     
  #480  
Old Posted Jan 23, 2015, 1:24 AM
Future Mayor's Avatar
Future Mayor Future Mayor is offline
Vote for me in 2019!
 
Join Date: Jun 2007
Location: Salt Lake City, UT
Posts: 4,803
While it's nothing overly flashy, I really do like the design. Crisp and clean with nice lines. I really like the engagement that the lobby has with the sidewalk.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West
Forum Jump



Forum Jump


All times are GMT. The time now is 7:14 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.