The 417 overpass of the Trillium Line is scheduled for rapid replacement by the MTO sometime between 2016 and 2018. That's one less structure standing in the way of a double-track Trillium Line

Over the next 20 years or so there's probably going to be lots more life-expired structures being replaced.
Reply With Quote
     
     
  #722  
Old Posted Jan 16, 2015, 1:45 PM
eemy's Avatar
eemy eemy is offline
Closed account
 
Join Date: Aug 2006
Posts: 4,425
If they use rapid replacement, I don't see how they can make it wider at the same time.
Reply With Quote
     
     
  #723  
Old Posted Jan 16, 2015, 1:52 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by jeremy_haak View Post
If they use rapid replacement, I don't see how they can make it wider at the same time.
I have no idea about the engineering specifics but I can definitely guarantee you that it will protect for the second track. This is the MTO we're talking about, the kings of future-proofing. They deliberately left room under the Kanata Av. overpass for a Transitway even though the EA for it was still ongoing at the time, for example. The fact there is a double track LRT on the books for that site means the MTO will protect not just for a second track but for electrification infrastructure as well.
Reply With Quote
     
     
  #724  
Old Posted Jan 16, 2015, 2:20 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,702
Isn't it already wide enough under there? There's even room for the pathway that runs through. It's the trench that's too narrow in some sections for double tracking and the city will have to widen it. In their wisdom, they'll probably close down the Trillium line for 2 years just to do that.

Are the standards for trench width clearance different for LRT and heavy rail?
Reply With Quote
     
     
  #725  
Old Posted Jan 16, 2015, 3:42 PM
Radster Radster is offline
Registered User
 
Join Date: Oct 2007
Location: Chelsea
Posts: 997
I walk my dog on that path a few times a week, and that 417 overpass is definitely wide enough for double tracking, I always wonder why there is so much wasted space under there when I walk by...
Reply With Quote
     
     
  #726  
Old Posted Jan 16, 2015, 4:07 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Well then, it was never an obstacle to begin with
Reply With Quote
     
     
  #727  
Old Posted Jan 16, 2015, 4:08 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by Radster View Post
I walk my dog on that path a few times a week, and that 417 overpass is definitely wide enough for double tracking, I always wonder why there is so much wasted space under there when I walk by...
Way back there was a plan to build a freeway on what is now the Trillium Line corridor. Perhaps they left space for it under the 417 overpass.
Reply With Quote
     
     
  #728  
Old Posted Jan 16, 2015, 6:10 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,813
Quote:
Originally Posted by acottawa View Post
I don't have much knowledge of Ottawa in that era, but I understand key decisions were taken in the 1980s when the Calgary and Edmonton systems were both up and running, the Vancouver system was under construction. It is also after Vancouver, Montreal and Toronto also had established commuter rail systems. At that time the province was paying 75% of transit costs (before adopting the Harris policy of paying nothing or the Mcguinty policy of paying 100% in Toronto and much less in Ottawa) and municipalities had a lot of cash for things like new city halls so it would seem to me there would have been options available.

The fact that so much of the transitway follows existing or former rail corridors and the o-train was created at very minimal cost but was still successful to me is an indication a poor choice was made.

But even if BRT was for some reason the only option, I think it was implemented poorly with huge infrastructure expenditures in the inner suburbs, no infrastructure downtown (and a poorly thought out plan to build a bus tunnel) and little outside the greenbelt. Much of the transitway could have been implemented with bus lanes on existing roads and highways and certainly many of the stations could been much less elaborate.
I think you are expecting far too much from people planning rapid transit 35 years ago.

Ottawa's transit system was regionalized in the early 1970s. The first step that they did was extend transit routes into Gloucester and Nepean. There was really no service out there although suburbs were expanding rapidly. There were a few private routes but we were building totally car oriented suburbs and likewise for retail which was spilling outside city boundaries because Gloucester and Nepean had much less restrictive retail hours. In those days, stores only opened after 6 pm on Thursday and Friday night within the city proper. Things needed to change.

Soon after Ottawa began the express bus system based on the private Beacon Hill Bullet model that was highly successful. Prior to that time, the intention was to offer only a transfer service to the suburbs using trunk line routes that ran very slowly into downtown. This would have generated very little ridership. The express bus system took off across the city. At the same time, bus lanes were set up on certain streets such as Montreal Road.

These measures brought about a major increase in ridership (that had previously been declining). This brought about discussion for rapid transit in the late 1970s. This was about the time Edmonton opened their LRT route but as I pointed out, it had disappointing ridership for a long time. It was also very expensive as it tunneled under downtown and really didn't go where the majority of Edmonton residents needed the service. Calgary's system didn't come until our initial Transitway planning was close to finished.

Really, Edmonton's system was not a glowing example to follow and it was beyond our affordability for the forsseable future. Yes, City council knew about it and there was a debate amongst the public about LRT at the time but the city did take a safer route by choosing transitways, which were also untested at the time. I don't think commuter rail was ever considered because Ottawa was not big enough and the Go-Train model was only designed for pretty long distance travel and very limited service. It really was not a good option especially since the downtown railway station had been closed since 1966. It would have never worked in Ottawa successfully. We don't have a Oshawa or Burlington, 50 km away from downtown.

The choice was made with the idea of eventual conversion to LRT when ridership warranted it. This was not short-term thinking as the first leg of the Transitway opened in 1983, 32 years ago. It was the next logical move beyond bus lanes that had been created in the mid 1970s. We would have been much further behind if we had stuck with only bus lanes. Although the convertability of the Transitways was far from perfect, at least we ended up with a mostly grade separated system.

Downtown was always going to be a problem because of the cost. Yes, we could have built it first, but the end result would have been that the Transitways would not have been built or not built to the extent that they have been. There would have been little benefit from a downtown tunnel alone as there would have been little time savings for those travelling from either the outer or inner suburbs. The end result of congestion downtown is a good thing because it has demonstrated the success of the Transitways.

As I pointed out earlier, it was part of the original plan to build a downtown tunnel and to convert to LRT. So our planners from the late 1970s and early 1980s were not off track at all, although their plan did not get implemented in a perfect way. It never does when politics are involved.

I don't think Ottawa was that far off course back in those days. However, things changed with Mike Harris in the 1990s and with other Conservatives that sent our plans off course and caused considerable delays in improving our transit network.
Reply With Quote
     
     
  #729  
Old Posted Jan 16, 2015, 6:46 PM
silvergate's Avatar
silvergate silvergate is offline
Registered User
 
Join Date: Apr 2014
Location: Ottawa
Posts: 629
I talked to one of the project members at the open house last night and he pointed out that the biggest issue for double tracking is the hundreds of millions of dollars to tunnel under Dow's lake. Until they can clear that hurdle, apparently 8 minute service is the best we're going to get.
Reply With Quote
     
     
  #730  
Old Posted Jan 16, 2015, 9:29 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,813
Quote:
Originally Posted by silvergate View Post
I talked to one of the project members at the open house last night and he pointed out that the biggest issue for double tracking is the hundreds of millions of dollars to tunnel under Dow's lake. Until they can clear that hurdle, apparently 8 minute service is the best we're going to get.
That makes sense. We can't do much between Carleton and Gladstone because of the tunnel and deep rock cut leading into the tunnel. If we can't put in another passing track there, frequency cannot be improved and it is pointless putting in more passing tracks elsewhere.
Reply With Quote
     
     
  #731  
Old Posted Jan 16, 2015, 9:55 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
how could that short tunnel cost hundreds of millions? the whole NSLRT only cost hundreds of millions, and included all kinds of other pricey components in it. Yes, NSLRT was priced a decade ago, but that's just ridiculous, it's a simple cut and cover while the lake is drained.

Neat: apparently in 1961, the tunnel cost was estimated at $3.6M: http://www.oldottawasouth.ca/oos/history...rchives-railway-tracks-going-under-canal
Reply With Quote
     
     
  #732  
Old Posted Jan 16, 2015, 10:18 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
Quote:
Originally Posted by Kitchissippi View Post
Isn't it already wide enough under there? There's even room for the pathway that runs through. It's the trench that's too narrow in some sections for double tracking and the city will have to widen it. In their wisdom, they'll probably close down the Trillium line for 2 years just to do that.

Are the standards for trench width clearance different for LRT and heavy rail?
Most likely they would have to close the Trillium Line for 2 consecutive summers (May to August) to blast through the tunnel and widen it - the earliest realistically it could be done is the summer of 2019 and 2020. It would be too disruptive during the school year for a full closure so it would need to be scheduled to ensure it can operate fully during the school year. The tunnel is 620 metres in length, so two boring machines could each handle 310 metres of tunneling.

The first summer they could tunnel it out, stabilize it and reinstall the tracks (likely with a speed restriction) and the second summer they could construct the twin tunnels and then with that space they could build the twinned tracks. Unless a switching is done, they would have to build on the west side of the tunnel for the twinning, to line up with the trench which could be blasted easily during that time frame.

A second bridge (or new bridge) over the Rideau River can be done with relatively minimal impact to operations, since most of the work would be off the bridge - in the river or on the new bridge. They could use those 2 summer closures to do the heavy work.
Reply With Quote
     
     
  #733  
Old Posted Jan 16, 2015, 10:48 PM
ACmodels's Avatar
ACmodels ACmodels is offline
Registered User
 
Join Date: Nov 2014
Location: NCR
Posts: 123
Quote:
Originally Posted by eternallyme View Post
The tunnel is 620 metres in length, so two boring machines could each handle 310 metres of tunneling.
To be cheep the city may use just 1 boring machine for the whole 620 meters...
Reply With Quote
     
     
  #734  
Old Posted Jan 17, 2015, 8:05 AM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by jeremy_haak View Post
If they use rapid replacement, I don't see how they can make it wider at the same time.
You can make a bridge wider during rapid replacement, but longer isn't possible. Either way, this is a difficult site to execute rapid replacement on singe there isn't a level road underneath to carry the bridge on. A system like the Rideau River bridge replacement is using may make more sense.

Quote:
Originally Posted by Kitchissippi View Post
Isn't it already wide enough under there? There's even room for the pathway that runs through. It's the trench that's too narrow in some sections for double tracking and the city will have to widen it. In their wisdom, they'll probably close down the Trillium line for 2 years just to do that.

Are the standards for trench width clearance different for LRT and heavy rail?
Heavy rail has a higher height requirement than LRT, but similar in width. The trench would have to be widened to accommodate double tracking with either mode. Although the 417 bridge is long, the issue may be the height of the bridge and it's centre support columns getting in the way of the trench widening.

Trench widening is also one of the few good reasons I can think of that full closure of the O-Train may actually be needed. It's hard to blast rock and clean it up in the course of 6 hours, and that's if you end service at 10pm like they currently are. Tracks would also likely need to be realigned after widening, since the width would likely not be taken entirely off one side for the length of the trench.

Quote:
Originally Posted by ACmodels View Post
To be cheep the city may use just 1 boring machine for the whole 620 meters...
The tunnel under Dow's lake isn't a good candidate for a tunnel boring machine in the first place. The approaches are probably best dug by Roadheaders or other traditional methods, and under the lake itself is probably best completed by cut and cover since the canal can be easily drained. TBMs are expensive, and the existing tunnel is square and not terribly old, so widening it out would probably be the best option.
Reply With Quote
     
     
  #735  
Old Posted Jan 17, 2015, 9:45 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,102
Quote:
Originally Posted by Catenary View Post
The tunnel under Dow's lake isn't a good candidate for a tunnel boring machine in the first place. The approaches are probably best dug by Roadheaders or other traditional methods, and under the lake itself is probably best completed by cut and cover since the canal can be easily drained. TBMs are expensive, and the existing tunnel is square and not terribly old, so widening it out would probably be the best option.
Was the original tunnel a cut-and-cover job?
Reply With Quote
     
     
  #736  
Old Posted Jan 18, 2015, 12:27 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
Reply With Quote
     
     
  #737  
Old Posted Jan 18, 2015, 1:34 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,102
!!!!!!!!!!!!

Muchas gracias!
Reply With Quote
     
     
  #738  
Old Posted Jan 18, 2015, 2:53 AM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
Quote:
Originally Posted by Kitchissippi View Post
Isn't it already wide enough under there? There's even room for the pathway that runs through. It's the trench that's too narrow in some sections for double tracking and the city will have to widen it. In their wisdom, they'll probably close down the Trillium line for 2 years just to do that.

Are the standards for trench width clearance different for LRT and heavy rail?
They are different. For heavy rail (as in freight) the width requirement is 16'. For light rail it's in the 10'-12' range.

Interestingly, the always anti-rail NCC constructed the Carling overpass with 28' of clearance, 4' shy of being double trackable for heavy rail. But it is enough for light rail. Indeed, it's enough for one track to be heavy-compatible and the other for light.


Quote:
Originally Posted by lrt's friend View Post
I think you are expecting far too much from people planning rapid transit 35 years ago.
No, the problem was *who* those people we had doing rapid transit planning back then. Calgary's chief transit planner was a Dutchman well-versed in the tramways-cum-light railways of northwest Europe (i.e. Straßbahn systems becoming Stadtbahn systems in Germany and the equivalent in the Netherlands) whereas our chief transit planner was a bowtie-wearing Brit with a love buses. We also had the misfortune to hire the same consultants who had proposed a 17 lane trench and collector lane system in the Laurier-Gloucester blocks.

That's the difference. On the face of it, Calgary was actually the more probable place for experimenting with BRT: it was a new concept ("pioneering" as they like to say), Calgary was car-crazy and an oil town, oil being what buses run on and what their running ways are built of. And yet Calgary went with the "old world" solution of light rail, thanks to its Dutch chief transit planner.

Quote:
As I pointed out earlier, it was part of the original plan to build a downtown tunnel and to convert to LRT. So our planners from the late 1970s and early 1980s were not off track at all, although their plan did not get implemented in a perfect way. It never does when politics are involved.
Afraid that's just not so. The Transitway was "sold" to the public and their politicians on the notion that it could be converted, but there was never any serious intention to do so on the part of our transit planners, even as late 2007. The idea was rejected outright in the 2003 TMP - not in "not yet, not now but maybe someday" way but in an outright it will never happen way. The Transitway design documents bear this out, as do the attitudes of its designers. Station design, for instance, has absolutely no consideration of rail requirements nor any provision for easy conversion of those stations. To this day, there are persistent rumours that the overpasses (all north/east of Confederation Heights) of the SE Transitway (which is not slated for conversion in current plans) are not suitable for LRT and would require considerable reworking.

They couldn't even bring themselves to convert the SE Transitway south of Confederation Heights (all underpasses, except at Hunt Club) to LRT for the N-S LRT so as to avoid building new overpasses of the railways, so wedded were they to BRT and preserving BRT. The aforementioned bowtie-wearing Brit even showed up to a Transit Committee meeting to argue against LRT in the 2008 TMP and presented a plan for a pair of narrow single lane downtown bus tunnels instead of the pair of lane+shoulder tunnels proposed in the late 1980s.

"Conversion" was a basically a dupe. The fact it's finally happening is more a triumph of politicians over planner-engineers, and the fact that any kind of linear transportation infrastructure has a degree of inherent convertibility.
Reply With Quote
     
     
  #739  
Old Posted Jan 18, 2015, 7:59 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,813
Quote:
Originally Posted by Dado View Post
They are different. For heavy rail (as in freight) the width requirement is 16'. For light rail it's in the 10'-12' range.

Interestingly, the always anti-rail NCC constructed the Carling overpass with 28' of clearance, 4' shy of being double trackable for heavy rail. But it is enough for light rail. Indeed, it's enough for one track to be heavy-compatible and the other for light.




No, the problem was *who* those people we had doing rapid transit planning back then. Calgary's chief transit planner was a Dutchman well-versed in the tramways-—-light railways of northwest Europe (i.e. Straßbahn systems becoming Stadtbahn systems in Germany and the equivalent in the Netherlands) whereas our chief transit planner was a bowtie-wearing Brit with a love buses. We also had the misfortune to hire the same consultants who had proposed a 17 lane trench and collector lane system in the Laurier-Gloucester blocks.

That's the difference. On the face of it, Calgary was actually the more probable place for experimenting with BRT: it was a new concept ("pioneering" as they like to say), Calgary was car-crazy and an oil town, oil being what buses run on and what their running ways are built of. And yet Calgary went with the "old world" solution of light rail, thanks to its Dutch chief transit planner.



Afraid that's just not so. The Transitway was "sold" to the public and their politicians on the notion that it could be converted, but there was never any serious intention to do so on the part of our transit planners, even as late 2007. The idea was rejected outright in the 2003 TMP - not in "not yet, not now but maybe someday" way but in an outright it will never happen way. The Transitway design documents bear this out, as do the attitudes of its designers. Station design, for instance, has absolutely no consideration of rail requirements nor any provision for easy conversion of those stations. To this day, there are persistent rumours that the overpasses (all north/east of Confederation Heights) of the SE Transitway (which is not slated for conversion in current plans) are not suitable for LRT and would require considerable reworking.

They couldn't even bring themselves to convert the SE Transitway south of Confederation Heights (all underpasses, except at Hunt Club) to LRT for the N-S LRT so as to avoid building new overpasses of the railways, so wedded were they to BRT and preserving BRT. The aforementioned bowtie-wearing Brit even showed up to a Transit Committee meeting to argue against LRT in the 2008 TMP and presented a plan for a pair of narrow single lane downtown bus tunnels instead of the pair of lane+shoulder tunnels proposed in the late 1980s.

"Conversion" was a basically a dupe. The fact it's finally happening is more a triumph of politicians over planner-engineers, and the fact that any kind of linear transportation infrastructure has a degree of inherent convertibility.
Thank you. This is all great information and I fully understand what you are saying. I learn a lot from you, even when we don't agree.

I lived through this period of our city history and I was a regular transit user at the time so I took a great interest. You know I am not an railway expert and I admit it. I have said that before.

I look at what happened as a layman. I believe that is still very relevant. It is just a different perspective. I still believe what I said was quite accurate without getting into the behind the scenes details.

I know that there was a debate at the time of whether we should be adopting a rail solution. I believe those who were pushing a rail solution at that time were mostly rail advocates and that was fair enough.

Yes, we can talk about the people involved but still Calgary's and Edmonton's LRT projects were funded by oil boom money, something that we did not have. You cannot also deny that Edmonton's project was not an overwhelming success and it's underwhelming ridership results delayed expansion for a generation. Edmonton's LRT line opened 3 years before Calgary's.

Even if we had built LRT from day one, we could not have built as an extensive network as we have today and we would still be faced with an expensive tunneling project. We would have built surface rail, which would have the same congestion problem as buses. The transitways also allowed us to delay building difficult sections such as at Westboro and along Woodroffe that would have overwhelmed our budgets. With LRT, we cannot skip those difficult and expensive sections. And we still would have ended up with a hybrid system with rail only reaching part of the way to the suburbs. The end result would have almost certainly been lower ridership. Our city is not built the same way as Calgary where more jobs are focused downtown. I think our geography would not have allowed it without destroying some centretown neighbourhoods.

I know that planners compromised convertibility. Those decisions were not made up front. That came over the years. Without some of those compromises, costs would have certainly escalated. Money that we didn't have. As I pointed out, politics were always involved which is unavoidable.

I fully agree that many did not believe that conversion would ever take place and they made decisions based on that.

But I have always questioned the advisability of doing so. We are spending billions on these conversions and I continue to question whether we are going to get value for money. I am not the only who is skeptical of the end results. I have always said that this money should be spent towards real transit expansion on new routes within the urban part of the city and to new growth areas. Yes, to reintroduce a modernized version of streetcar suburbs where people don't need two cars to live there.

Yes, a tunnel is a necessity. Yes, I know the issue of operating costs of buses but we are also spending a ton on capital costs which is being funded by debt. It all comes from the same taxpayer. But it is also true that real transit expansion will generate more new ridership, and with that new revenue.

Regarding the Southeast Transitway, I live in that part of the city and after years of building ridership from the south to Billings Bridge, Hurdman and onward, it would have been foolish to build track on the route south of Confederation Heights. The clientele market on the Southeast Transitway and the O-Train have always been substantially different. We need to face realities that this would have been unacceptable. This is not about what is operationally the best for trains but what is best for those who use the system.

In the end, we should agree to disagree.
Reply With Quote
     
     
  #740  
Old Posted Jan 18, 2015, 4:14 PM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
With respect to the SE Transitway south of Confederation, converting it for the N-S LRT was proposed by Councillor Gord Hunter.

He actually had two options in mind and I came up with one more.

The first was outright conversion, which he figured was the cheapest but also, as you point out, left anyone who wanted to go up Riverside requiring an additional transfer or a routing via the street network.

His second and preferred option was track-in-road. He would do exactly what was being proposed for downtown and for parts of Riverside South and Barrhaven in the same project.

The option I came up with was to widen it to four lanes, which it pretty much is anyway with the shoulders. This would make it easier to maintain traffic during conversion and avoid the expense of track-in-road, though the rail underpasses near Greenboro would still have to be track-in-road. Given the layout of Walkley, Greenboro and South Keys Stations, it would work easiest with buses in the centre and tracks on the outside but it could work the other way around as well with some "—" at the stations.

All of these options would have seen one new railway underpass built at Confederation Heights in place of a railway overpass there and another at Walkley Yard as well as a widened underpass at Walkley Rd. It would likely have lopped $100M off the project cost - enough to pay for an extension to Hurdman. And that may well be why it elicited no interest on the part of our transit planners.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:27 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.