  #441  
Old Posted Jan 1, 2015, 5:47 PM
jubguy3's Avatar
jubguy3 jubguy3 is offline
Registered User
 
Join Date: May 2014
Location: SL,UT
Posts: 984
Quote:
Originally Posted by justiny View Post
I'll take anything over a local commercial sponser... I don't even know if that is possible, but if the PAC turns into the up-Chuck-a-Rama Theater, I will set a random car on fire.
What about stericycle performing arts center?

Don't get me started on Energy Solutions...
Reply With Quote
     
     
  #442  
Old Posted Jan 1, 2015, 10:33 PM
bflatflat9 bflatflat9 is offline
Registered User
 
Join Date: Feb 2014
Location: Salt Lake City
Posts: 308
Quote:
Originally Posted by jubguy3 View Post
What about stericycle performing arts center?

Don't get me started on Energy Solutions...
Or....
IPECAC----Institute for Performing Endearing Cults and Crafts.
(Subsidiary of Hale's).
Reply With Quote
     
     
  #443  
Old Posted Jan 1, 2015, 11:42 PM
jubguy3's Avatar
jubguy3 jubguy3 is offline
Registered User
 
Join Date: May 2014
Location: SL,UT
Posts: 984
Quote:
Originally Posted by bflatflat9 View Post
Or....
IPECAC----Institute for Performing Endearing Cults and Crafts.
(Subsidiary of Hale's).
Coincidentally, ipecac syrup makes you throw up
Reply With Quote
     
     
  #444  
Old Posted Jan 2, 2015, 1:05 AM
bflatflat9 bflatflat9 is offline
Registered User
 
Join Date: Feb 2014
Location: Salt Lake City
Posts: 308
Quote:
Originally Posted by jubguy3 View Post
Coincidentally, ipecac syrup makes you throw up
Well done.
Reply With Quote
     
     
  #445  
Old Posted Jan 3, 2015, 7:07 AM
bflatflat9 bflatflat9 is offline
Registered User
 
Join Date: Feb 2014
Location: Salt Lake City
Posts: 308
Have they been working on this thing the past week, or did they take it off like a lot of other folks?
Reply With Quote
     
     
  #446  
Old Posted Jan 3, 2015, 6:18 PM
Dallas Snob Dallas Snob is offline
Verticle
 
Join Date: Jun 2006
Location: West Palm Beach, Florida
Posts: 319
Huh. That is one slooooow moving high rise you got there. It's so slow that Layton Construction doesn't even list it as a current project on their website. For such a huge project you'd think they would. From the looks of it, absolutely nothing has changed at 111site for several weeks.
Reply With Quote
     
     
  #447  
Old Posted Jan 3, 2015, 6:48 PM
bflatflat9 bflatflat9 is offline
Registered User
 
Join Date: Feb 2014
Location: Salt Lake City
Posts: 308
Quote:
Originally Posted by Dallas Snob View Post
Huh. That is one slooooow moving high rise you got there. It's so slow that Layton Construction doesn't even list it as a current project on their website. For such a huge project you'd think they would. From the looks of it, absolutely nothing has changed at 111site for several weeks.
That's one way to nudge the pics out of em'.
Reply With Quote
     
     
  #448  
Old Posted Jan 3, 2015, 7:18 PM
StevenF's Avatar
StevenF StevenF is offline
The Drifter
 
Join Date: Oct 2006
Location: Omaha, NE
Posts: 1,172
Quote:
Originally Posted by Dallas Snob View Post
Huh. That is one slooooow moving high rise you got there. It's so slow that Layton Construction doesn't even list it as a current project on their website. For such a huge project you'd think they would. From the looks of it, absolutely nothing has changed at 111site for several weeks.
Holidays, and a few snow storms the past couple weeks has slowed this project down. When it snows or has a chance of freezing rain construction on Steel and concrete shuts down till the weather is better. Before all that happened the work on the town and EPAC was moving quickly. Not as quick for the tower but I have noticed one level higher in concrete work on the elevator core just haven't seen the rebar get any higher. January and February will be hit and miss since they tend to be our highest snow and coldest weather months. As the weather improves we will start to see a lot of work going again.

Last edited by StevenF; Jan 3, 2015 at 7:21 PM. Reason: Fixed iphone auto corrects
Reply With Quote
     
     
  #449  
Old Posted Jan 3, 2015, 8:57 PM
Stenar's Avatar
Stenar Stenar is offline
Registered User
 
Join Date: Jul 2008
Location: Salt Lake City
Posts: 3,234
Quote:
Originally Posted by Dallas Snob View Post
Huh. That is one slooooow moving high rise you got there. It's so slow that Layton Construction doesn't even list it as a current project on their website. For such a huge project you'd think they would. From the looks of it, absolutely nothing has changed at 111site for several weeks.
I don't even see anywhere that Layton Construction lists current projects on their website.
Reply With Quote
     
     
  #450  
Old Posted Jan 4, 2015, 6:44 PM
Dallas Snob Dallas Snob is offline
Verticle
 
Join Date: Jun 2006
Location: West Palm Beach, Florida
Posts: 319
Experience/Office/NewConstruction. Also look through their extensive press releases. Layton is a great company.I've always been impressed with their quality. They've definitely grown over the years as well.

HKS Architects is based here in Downtown Dallas and have been a client of the firm I work for. I see they do a lot of work in SLC as well.

Quote:
Originally Posted by Stenar View Post
I don't even see anywhere that Layton Construction lists current projects on their website.
Reply With Quote
     
     
  #451  
Old Posted Jan 4, 2015, 11:20 PM
gusam26's Avatar
gusam26 gusam26 is offline
Registered User
 
Join Date: Sep 2010
Location: Salt Lake City/Los Angeles
Posts: 223
Quote:
Originally Posted by Dallas Snob View Post
Experience/Office/NewConstruction. Also look through their extensive press releases. Layton is a great company.I've always been impressed with their quality. They've definitely grown over the years as well.

HKS Architects is based here in Downtown Dallas and have been a client of the firm I work for. I see they do a lot of work in SLC as well.
Layton construction is not building 111 Main, they are building the EPAC. Okland Construction is building the tower and they seem to only list finished projects.
Reply With Quote
     
     
  #452  
Old Posted Jan 5, 2015, 1:12 PM
Stenar's Avatar
Stenar Stenar is offline
Registered User
 
Join Date: Jul 2008
Location: Salt Lake City
Posts: 3,234
Quote:
Originally Posted by Dallas Snob View Post
Experience/Office/NewConstruction. Also look through their extensive press releases. Layton is a great company.I've always been impressed with their quality. They've definitely grown over the years as well.

HKS Architects is based here in Downtown Dallas and have been a client of the firm I work for. I see they do a lot of work in SLC as well.
I previously went to Experience/Office/NewConstruction. There are only 3 featured links. The other categories listed under New Construction do not have links, but only list what types of projects they work on. Layton also doesn't seem to list the Eccles Performing Arts Center on its website.

Layton clearly doesn't list all projects. The project examples Layton posts appear to only be finished projects.
Reply With Quote
     
     
  #453  
Old Posted Jan 6, 2015, 1:58 AM
EPdesign EPdesign is offline
Registered User
 
Join Date: Sep 2013
Posts: 865
Wow. The rebar for another core jump is starting to be placed. Pretty soon the core will start peaking up and be visible. I will take pics tomorrow when I go to lunch.

Side news. The crane was up at La Porte but I didn't see anyone. Confused by this project. The renderings show the southern half facade will have to old (torn down ) facades but those are long gone and only three stories if they were redone. But there is four floors on the southern end
Reply With Quote
     
     
  #454  
Old Posted Jan 6, 2015, 3:17 AM
jubguy3's Avatar
jubguy3 jubguy3 is offline
Registered User
 
Join Date: May 2014
Location: SL,UT
Posts: 984
Quote:
Originally Posted by EPdesign View Post
Wow. The rebar for another core jump is starting to be placed. Pretty soon the core will start peaking up and be visible. I will take pics tomorrow when I go to lunch.

Side news. The crane was up at La Porte but I didn't see anyone. Confused by this project. The renderings show the southern half facade will have to old (torn down ) facades but those are long gone and only three stories if they were redone. But there is four floors on the southern end
The core already already about 35 feet tall...
Reply With Quote
     
     
  #455  
Old Posted Jan 12, 2015, 1:04 AM
Highrise_Mike's Avatar
Highrise_Mike Highrise_Mike is offline
Registered User
 
Join Date: Jan 2009
Location: SoJo, UT
Posts: 232
Does anyone have any recent pictures of the site, I haven't been downtown in a couple weeks to take any myself. I'm curious to see if there are any big changes!
Reply With Quote
     
     
  #456  
Old Posted Jan 15, 2015, 2:03 AM
bflatflat9 bflatflat9 is offline
Registered User
 
Join Date: Feb 2014
Location: Salt Lake City
Posts: 308
Quote:
Originally Posted by Highrise_Mike View Post
Does anyone have any recent pictures of the site, I haven't been downtown in a couple weeks to take any myself. I'm curious to see if there are any big changes!
I took two rookie pics with my phone today, and am still trying to figure out how to post them.
Technology leads to one snafu to the next.
Why can't the world remain with manual typewriters and Bosendorfer pianos?
OK, change is good...or bad.
Alright, it's ME.
Anyway, the core is still at the same spot vertically as it was since we last had pics, but work is well under way on the core and all around it.
The four story steel wall running east-west where the tower hangs over the EPAC looks to be about done, and I would guess that the EPAC is topped out on the NE side.
There was talk about why only the concrete core is rising, like the Wilshire Grand in L.A., instead of the usual steel beams rising from the ground at the outset.
Not sure.
I know that the Wilshire didn't start the steel until the concrete core was about 18 stories.
We'll soon see.
I may try to post these pics, and depending on the turmoil....I may not.
But either way, I'm going to figure it out and be able to post pics sooner or later.
And thanks to all those who post pics for the rest of us...you know who you are, and thanks to all those with the real dope ins that keep the scoop deep.
You know who you are.
Outie.
Reply With Quote
     
     
  #457  
Old Posted Jan 15, 2015, 2:12 AM
Future Mayor's Avatar
Future Mayor Future Mayor is offline
Vote for me in 2019!
 
Join Date: Jun 2007
Location: Salt Lake City, UT
Posts: 4,803
Thanks for the update.

One person, on the SLC thread, had speculated about why the steel might not be rising yet, was because it is being supported from the top. I just want to clarify a couple of things on that.

The steel above the EPAC will be supported from the top of the building, but the remainder of the building will be built just like any other highrise with steel rising from the ground and being supported from the ground and anchored to the core. The only difference is that the northern portion of the building will be stronger and designed differently than a normal building with the same shape, because the southern section will rely on the northern section to carry the weight of it.
Reply With Quote
     
     
  #458  
Old Posted Jan 16, 2015, 8:31 AM
Highrise_Mike's Avatar
Highrise_Mike Highrise_Mike is offline
Registered User
 
Join Date: Jan 2009
Location: SoJo, UT
Posts: 232
Thanks for the quick update! Pics are definitely a pain to post on here since you have to use an image hosting website. It makes sense as far as the steel goes since the load of the south side will be supported through the top and from the steel on the north side. It makes sense that the core may rise a ways before the steel follows, just like on the Wilshire project in LA.
Reply With Quote
     
     
  #459  
Old Posted Jan 16, 2015, 7:23 PM
LumberJack LumberJack is offline
BANNED
 
Join Date: Jan 2015
Posts: 90
Quote:
Originally Posted by Highrise_Mike View Post
Thanks for the quick update! Pics are definitely a pain to post on here since you have to use an image hosting website. It makes sense as far as the steel goes since the load of the south side will be supported through the top and from the steel on the north side. It makes sense that the core may rise a ways before the steel follows, just like on the Wilshire project in LA.
Also just like Park Avenue West in Portland. The core got really high before hardly any steel was added.
Reply With Quote
     
     
  #460  
Old Posted Jan 18, 2015, 6:02 AM
ToysNoiz's Avatar
ToysNoiz ToysNoiz is offline
Destroy 200 S. Carl's Jr.
 
Join Date: Jul 2013
Location: Salt Lake City, Utah
Posts: 745
From today





Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West
Forum Jump



Forum Jump


All times are GMT. The time now is 11:16 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.