Quote:
Originally Posted by Aylmer
To be fair to Ottawa, the only project we did cancel was the NS LRT project with a downtown tram as the backbone of our transit system, which was ridiculous to begin with. As much as it did put us back (a little less than a decade ― NS LRT was to be completed in 2009), in retrospect, Phase 1 and Phase 2 really justify cancelling NSLRT.
Now we've got to hope that a future Phase 3 will concentrate less on the suburbs and more on improving the often dismal inner-city travel (mostly on Bank St. And Rideau St.).
|
I will always disagree with this. Ottawa was a small city until World War II and therefore it is today largely a post-war suburban community that requires a transit system that reflects this. Focusing on the small pre-war urban core is simply not reasonable or realistic.
The 2006 cancellation has permanently set Ottawa's plans back and directly resulted in the underfunding of the current plan by the federal and provincial governments. There was a cost to pay for wasting millions of taxpayers money by the neophyte mayor at the time. And if you look at the current plans, you will note that only one route will ever serve the downtown area. This is a fundamental flaw. No other major Canadian city will have only one rapid transit route serving their downtown area.
Now, don't get me wrong. The subway currently being built is absolutely necessary but it will not effectively serve the entire city.
The direct result of Ottawa's fumbling, has been the cutting of the urban routes (Carling Avenue and Rideau Street routes) that the poster has so much desire for.
As much as there is also a desire (and possible need) for a Bank Street subway, it is at best wishful thinking. The Confederation Line will soak up almost all capital transit funding for the next generation.
Although, Ottawa is finally moving forward with its plans, it will likely have the least impact in delivering faster service and in the end, will produce the least spike in ridership.
The most creative transit plans were tossed out in 2006 as a result of political interference. It was not just the cancelled N-S route but the whole city transit plan that was thrown out and made politically impossible to resurrect in whole or in part. This was a permanent loss. Now, so many ideas cannot even be discussed.
And the end result, we get politically safe projects such as Rapidbus that has actually delivered worse service at a price tag of hundreds of millions of dollars.
I look forward to the 2018 opening of the Confederation Line with mixed feelings. It is exciting because I agree it is a city changer but I also know, that transit service in my part of Ottawa will end up worse.