Quote:
Originally Posted by jsbertram View Post
Reading the RFP docs suggests it will be awarded in January, and the work should be completed by the end of summer.
This is just for the initial technical services to create the reference case and do the initial planning and engineering for the Broadway extension to Arbutus.

This is just the first round of technical planning for the new subway line.
Where are the stations going to be?
Where are the tunnels going to be?
How does it connect to VCC station?
How does Arbutus get built so a future extension can be done?
How much will this cost (ballpark educated guess)?


Future RFPs in 2016 will delve into the gritty details of engineering the tunnels. stations, portals, elevated tracks, more detailed (and presumably accurate) costs and financial planning.
Thanks for the information! This is the first mass transit line in Vancouver that I'll be following from the very beginning so I'm excited to see it all progress.
__________________
Build transit and stuff around it.
     
     
  #12922  
Old Posted Dec 30, 2014, 12:19 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Dump the bad news during the xmas - new years break when everyone's not looking

Quel Suprise?

Expect another year without fully working fare gates and Compass cards on transit
http://www.theprovince.com/news/Expect+a...ompass+cards+transit/10679177/story.html

After $200 million, it seems they are too far into this project to bail & start again.
     
     
  #12923  
Old Posted Dec 30, 2014, 3:22 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,112
This is humiliating.
We can build, maintain and extend the "perfect"**** urban transit system but we can't even setup a modern faregate system.

Give it up TransLink. The contractor failed. Now rip them apart for the screwup.

**** This statement will vary by region.
     
     
  #12924  
Old Posted Dec 30, 2014, 4:19 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,024
Yeah, how hard is it to install a system that has been done countless times around the world. I hope Translink nails the contractor against the wall. Then, just go to Japan, ask whoever installs their fair gate systems and transplant that system in Vancouver. Works without a hitch here.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #12925  
Old Posted Dec 30, 2014, 4:41 AM
Spork's Avatar
Spork Spork is offline
Shoebox Dweller
 
Join Date: Sep 2008
Location: Vancouver
Posts: 1,784
Does anybody know if the contract details are public? I would imagine that they would not be as they involve a private 3rd party, but it would be interesting to see what penalty or "drop dead" clauses there are, if any.
     
     
  #12926  
Old Posted Dec 30, 2014, 5:41 AM
SOSS SOSS is offline
Registered User
 
Join Date: Jan 2014
Posts: 661
Quote:
Originally Posted by Metro-One View Post
Yeah, how hard is it to install a system that has been done countless times around the world. I hope Translink nails the contractor against the wall. Then, just go to Japan, ask whoever installs their fair gate systems and transplant that system in Vancouver. Works without a hitch here.
What system(s) specifically were introduced on-time, on-budget, to the full specs of the contract?

I personally think that its good to delay until proper testing is in place but any cost overruns should be carried by the contractor. Unless there are some unforeseen circumstances... but I can't think of any. Unless translink changed the terms...?
     
     
  #12927  
Old Posted Dec 30, 2014, 5:50 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,803
Quote:
Originally Posted by Metro-One View Post
Yeah, how hard is it to install a system that has been done countless times around the world.
A system which records riders getting on and off such a huge bus fleet certainly hasn't been done "countless times". Yes, there are countless faregate installations in rapid transit systems, but tap/on, tap/off systems on buses are a much different story. That's the functionality that's causing all the problems for Translink's faregate vendor.

And to add insult to injury, once they figure it out then other fleets will start implementing it too, and by virtue of our trailblazing their installations will go a lot more smoothly. Then everyone will point to those other installations as proof that Translink could have done it better.
     
     
  #12928  
Old Posted Dec 30, 2014, 5:54 AM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,983
On second thought, the Canada Line stations were built much too large, they bought far too many trains, and I think even when Vancouver hits 10 million capacity will never be an issue.
Clearly I am wrong and all my concerns were ridiculous and there are simply no issues with the line. I will be sure not comment further on any Vancouver forums on SSP and will ignore the Vancouver forum section as nearly everyone outside of Vancouver on SSP does although why I can't imagine.
     
     
  #12929  
Old Posted Dec 30, 2014, 5:56 AM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,711
Ya the bus tap on/off is obviously the issue. Whether or not the contractor is on the hook will be in the details of the contract.

People are up in arms about the timeline, but IMO the cost is more important. It's not like the system isn't operating today, or is even negatively impacted.
     
     
  #12930  
Old Posted Dec 30, 2014, 6:37 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,803
Quote:
Originally Posted by ssiguy View Post
Clearly I am wrong and all my concerns were ridiculous and there are simply no issues with the line. I will be sure not comment further on any Vancouver forums on SSP and will ignore the Vancouver forum section as nearly everyone outside of Vancouver on SSP does although why I can't imagine.
Hey, I'm disappointed in the station sizes as well. Actually, my biggest gripe about the stations is that virtually all of them have only a single entrance, which often means you have to cross two streets to get into a station which was directly below you to start with. I guess when I was a kid living in Toronto I got used to their subway stations, which typically have entrances from each quadrant of an intersection.

Nonetheless, trying to claim that the system is already at it's ultimate capacity with respect to station sizes is simply untrue.
     
     
  #12931  
Old Posted Dec 30, 2014, 5:23 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,711
Quote:
Originally Posted by ssiguy View Post
On second thought, the Canada Line stations were built much too large, they bought far too many trains, and I think even when Vancouver hits 10 million capacity will never be an issue.
Clearly I am wrong and all my concerns were ridiculous and there are simply no issues with the line. I will be sure not comment further on any Vancouver forums on SSP and will ignore the Vancouver forum section as nearly everyone outside of Vancouver on SSP does although why I can't imagine.
     
     
  #12932  
Old Posted Dec 30, 2014, 11:19 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,782
More time for me to use up my Faresavers!

Quote:
Originally Posted by aberdeen5698 View Post
A system which records riders getting on and off such a huge bus fleet certainly hasn't been done "countless times". Yes, there are countless faregate installations in rapid transit systems, but tap/on, tap/off systems on buses are a much different story. That's the functionality that's causing all the problems for Translink's faregate vendor.
Also add the multiple zones as an issue as well.

From the Compass Card thread:

Quote:
Surprisingly - a researched story from the Vancouver Sun:

http://www.vancouversun.com/news/metro/M...buses+TransLink+says/10336549/story.html

Quote:
Metro Vancouver may go to a single fare zone for buses, TransLink says
Changes to three-zone system pondered after problems meshing Compass Cards with distance-based pricing

By Lori Culbert and Kelly Sinoski, Vancouver Sun October 30, 2014

The day after The Vancouver Sun revealed TransLink’s planned Compass Card system still won’t work on bus routes through multiple fare zones, the transportation authority was unable to point to another city in North America where it does.

TransLink cited Singapore as having a functional system where riders swipe a card on the way onto a bus and tap it on the way out, so they can be charged for the distance travelled. But the transportation authority acknowledged Metro Vancouver will look at following the lead of other cities and scrap the tap-out step.

A Sun survey of several American cities with transit smart cards revealed they do not have tap-in, tap-out systems in multiple fare zones.

...

In San Diego, commuters have been tapping smart cards to enter buses and light rail since 2009, but they don’t have to tap-out — it is one price to ride anywhere in the city.

That city’s transit authority, however, also has a commuter rail line with three zones from the suburbs to downtown but, despite years of discussion, cannot figure out how to make the smart card work on that line.

“The way you guys are using it, implementing that component of the Compass Card down here is still in process because we haven’t quite figured out how to do that yet,” said transit spokesman Rob Schupp.

The situation is similar in Chicago and Boston.

The Chicago Transit Authority uses Cubic-built Ventra smart cards for the city’s one-zone buses and light rail, but its sister agency METRA did not adopt smart cards for its 12-zone commuter rail system.

...

Instead, the METRA rail system is using a Ventra app on smart phones, which allows customers to prepay for multi-zone fares either before or during their trip.

Boston has Charlie smart cards for one-zone travel on buses and the subway, but has a mobile app to pay for tickets on its 10-zone commuter rail system.

...
     
     
  #12933  
Old Posted Dec 30, 2014, 11:36 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,711
London uses Cubic for the tube with several zones pretty easily.

I believe the buses are also "tap on" only. Sounds like a reasonable solution. You can also change the fee structure of buses vs. trains as well. So many people connect to a skytrain anyway, buses can reasonably be $1.50 to get on, whereas Skytrain would be $2 + $0.20/station, or whatever.

To sound cliche, it seems like Translink hasn't "thought outside the box" enough.

Last edited by WarrenC12; Dec 30, 2014 at 11:36 PM. Reason: money
     
     
  #12934  
Old Posted Dec 31, 2014, 12:38 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,782
It's probably also a situation where you want to introduce changes gradually
- rather than compounding the confusion on how to use the fare card with a new fare structure.

But it sounds like they'll have to jump in with fare structure changes too.
     
     
  #12935  
Old Posted Dec 31, 2014, 1:52 AM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,711
You can bury yourself trying to deal with every scenario and 🞵🞵🞵🞵🞵 out there. Sometimes you just gotta jump in and deal with the consequences as they come up. Throw a ton of attendants at every station and you'll be fine.
     
     
  #12936  
Old Posted Dec 31, 2014, 2:40 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,024
Quote:
Originally Posted by aberdeen5698 View Post
A system which records riders getting on and off such a huge bus fleet certainly hasn't been done "countless times". Yes, there are countless faregate installations in rapid transit systems, but tap/on, tap/off systems on buses are a much different story. That's the functionality that's causing all the problems for Translink's faregate vendor.

And to add insult to injury, once they figure it out then other fleets will start implementing it too, and by virtue of our trailblazing their installations will go a lot more smoothly. Then everyone will point to those other installations as proof that Translink could have done it better.
Well for the time being could they not activate the rail portion of the project? Also forget the fair zone set up and install distance based fairs. As for buses...a creative slution obviously needs to be found. Single fair for local buses? Higher fair for B-Lines? Fair gate stations (same card as skytrain) for Rapid Buses such as the 555?
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #12937  
Old Posted Dec 31, 2014, 6:27 AM
Spork's Avatar
Spork Spork is offline
Shoebox Dweller
 
Join Date: Sep 2008
Location: Vancouver
Posts: 1,784
I think the issue with going all in right now and figuring out the tap out later down the line is due to the very size of our bus network. Sure, they could just say $1.50pp for the bus and $2 + $0.20/station for train, but how fair would it be for a 1.5 hour bus ride from White Rock to cost $1.50 when a 15 minute ride from Davie+Denman to Robson Square costs the same? While the current fare zones aren't entirely fair, they at least have some resemblance of an effort towards "fairness". Further, I don't know how much or how accurate Translink's data is, but I could see them going all-in with a temporary change like this and royally screwing it up, and magically falling $300m short of revenue expectations due to poor research and planning.

The advantage that cities like London have over us is fewer long-haul bus routes and more hop-on hop-off use. Their larger metro system and greater density lends to the fairness of a flat rate bus service.

I don't disagree that Translink has bungled this thing from Day 1 (think: RFP drafting), but I don't think there is a quick fix at this stage.

My 2 cents.
     
     
  #12938  
Old Posted Dec 31, 2014, 7:06 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,803
Quote:
Originally Posted by Spork View Post
I don't disagree that Translink has bungled this thing from Day 1 (think: RFP drafting)...
The best RFP in the world isn't going to save you from unexpected problems. The very best it can do is to impose penalties or reduce costs if those problems occur. And I'm not sure that we know that those kinds of clauses weren't in the contract that was signed.
     
     
  #12939  
Old Posted Dec 31, 2014, 8:13 AM
Meraki Meraki is offline
Registered User
 
Join Date: Mar 2012
Posts: 473
TransLink signed with Cubic, who aren't exactly nobodies in the business (having done London Oyster, TransLink's magnetic media, and others around the world)

Clueless comments such as "Yeah, how hard is it to install a system that has been done countless times around the world." are dumb because TransLink went with one of (if not the largest) gate/card companies around who have a long record of implementations larger than Vancouver.

TransLink requested functionality of tap-on tap-off on buses, which is something new to the industry. New functionality paired with poor Rogers cellular service (required for the bus to communicate with the Compass back end) is causing the myriad of delays we're seeing today.

The gates could have been activated for SkyTrain a long time ago, but the requirement that buses perform both real time tap-in and tap-out is gumming up everything. The bus mounted Compass readers having to communicate over cellular causes an unacceptable latency per tap as even at the best of times there's at least 40ms delay, and it's jittery so one tap may be 40ms, the next will be 400ms. Perhaps this is a notable reason why no other authority has implemented the tap-off on buses.

Without knowing the inner negotiations the fault lies shared between Cubic and TransLink. Cubic either did or should have told them tap-out over cellular isn't achievable with today's technology. TransLink should have accepted that and changed the implementation, not spend more time, money and effort demanding they "make it work!" leading Cubic to shuffle their feet for a few months and say "We told you it can't be done then, it can't be done now."
     
     
  #12940  
Old Posted Dec 31, 2014, 10:33 AM
dpogue dpogue is online now
Registered User
 
Join Date: Aug 2013
Posts: 769
There are some details from a Vancouver Sun article dating back to July 2014:

http://www.vancouversun.com/Rollout+Translink+Compass+Card+system+delayed+again/10011230/story.html
Quote:
...

Kelsey said field testing has shown the bus card readers -- or mobile validators -- on buses are taking longer than anticipated to scan the Compass cards, up from the target of 0.3 seconds to several seconds. There are also problems with the tapping in and out of the cards on buses, with Translink estimating an eight per cent to 10 per cent error rate on the mobile validators.

...

But Kelsey argues the "rail, marine and the rest of the system is working quite robustly" and expects Cubic will be able to fix the problems by this fall. Another update on the system is expected in October, but Kelsey said no timeline has been set as to when the cards will be rolled out to West Coast Express passengers and then the mass public. Kelsey insists the project's budget, which rose from $171.3 million to $194 million, will not increase as Cubic is responsible for the cost of fixing the problems. TransLink will not pay Cubic, he added, until the program is working efficiently.

...
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:02 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.