Let's discuss this (
http://agendaminutes.calgary.ca/sirepub/...0csoi3lw3fle/31010812152014084114572.PDF).
It looks like they broke out the evaluation into three chunks- downtown to 20th avenue, 20th avenue to Beddington Blvd and Beddington blvd north to Beddington trail (a really short segment).
The 3 options for downtown to 20th are basically as follows and are determined primarily how they cross the river:
1. New bridge over the river.
- Underground from 10th avenue to 3rd avenue. Bridge over the river to a tunnel portal in the bluff. Underground until 20th avenue
- 7th avenue station underground
- 2nd ave station (Eau Claire) at grade
- 9th avenue station underground, about 7m from surface.
- $770M capital cost
2. Centre Street Bridge (preferred option)
- Underground from 10th avenue to 3rd avenue. Turns onto 3rd avenue to get to grade, then uses centre street at grade for the rest of the way, except for an underground station at 16th avenue
- 7th avenue station underground
- 3rd avenue station at grade
- 9th avenue station at grade
- $660M capital cost
3. Fully underground.
- underground from 10th avenue to 20th avenue
- tunnelled under the river
- 9th avenue station is ~40M deep (wow!)
- $1.3B capital cost
From 20th to Beddington, there are two options, one being a wider right of way (two lanes of traffic each way), the other narrower (single lane of traffic each way).
- Tunnel under McKnight
- Stations at 28th, 40th, McKnight (doesn't show on the alignment sections, but does show on the map), 60th,
- Full turns intersections at 28th, 32nd, 40th, Laycock Dr., McKnight, 64th, 68th, 72nd and Beddington Blvd.