Old Posted Dec 10, 2014, 8:38 AM
troublemaker troublemaker is offline
Registered User
 
Join Date: Aug 2011
Posts: 83
Quote:
Originally Posted by Rico View Post
The original Expo stations are starting to look tired...I am looking forward to the completed renovations.
They look tired because they were designed to look no different than a fast food restaurant or a convenience store. Quality design doesn't age so fast. The CPR station has served as a transportation hub for a century. I've never heard anyone say it looked "tired." I rode the Seabus every day for years, and walking through the CPR station was always a pleasure.

Quote:
I think the new Main street platforms are 86 or 87m, the original stations were 80m so it is a little longer (I assume to better accommodate the 5 car trains).
I'm glad the platforms will be a bit longer, though I imagine that for a small additional amount, they could have been built to accommodate 6-car trains, as envisioned in the 2008 Provincial Transit Plan. That way the structure might be good for 50 years instead of 25.
     
     
  #12842  
Old Posted Dec 11, 2014, 12:37 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,740
Quote:
Originally Posted by queetz@home View Post
Wasn't the whole point of the Translink HQ in New West to consolidate their operations in one big facility?
While the consolidation was an interesting after-effect, AFAIK the reason for the move to New Westminster was because it would save taxpayers money (the lease cost at Sapperton is lower than the previous lease cost at Metrotower).
     
     
  #12843  
Old Posted Dec 11, 2014, 12:52 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
Coat Mountain Bus was based out of the Gateway Tower in Surrey.
     
     
  #12844  
Old Posted Dec 11, 2014, 2:21 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
What would happen if a lightning bolt hit the Sytrain (either the rails or the cars directly).

Random thought I had last night listening to the pouring rain.
     
     
  #12845  
Old Posted Dec 11, 2014, 2:30 AM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,175
Quote:
Originally Posted by Mac Write View Post
What would happen if a lightning bolt hit the Sytrain (either the rails or the cars directly).

Random thought I had last night listening to the pouring rain.
The Skytrain cars would accelerate to 88 miles per hour, then travel back to 1955. Great Scott!
     
     
  #12846  
Old Posted Dec 11, 2014, 3:50 AM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by Mac Write View Post
What would happen if a lightning bolt hit the Sytrain (either the rails or the cars directly).

Random thought I had last night listening to the pouring rain.
It... probably can't. The entire thing is grounded, so there's likely nothing that would be damaged.

There's a paper on this for Light Rail with overhead catenary though:
http://grouper.ieee.org/groups/railtransit/ocs/1627_wg/OCSLIGHTNING%20Article%20by%20Dev%20Paul.pdf

Which apparently in the UK is highly prone to lightning strikes ( http://www.telegraph.co.uk/news/weather/...used-by-lightning-strikes-overnight.html .) Perhaps a better question would be to ask the Coast Mountain Bus guys how often lightning strikes the trolley wires here.

What does happen is lightning takes out signalling equipment on heavy rail. I was on an Amtrak train out in the middle of nowhere towards Chicago last year and they lost the signaling during a lightning storm, so they ran the train at 20mph.
     
     
  #12847  
Old Posted Dec 11, 2014, 4:40 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
Playing with Trolley buses to get them to spark is a lot of fun with Trams BC.
     
     
  #12848  
Old Posted Dec 11, 2014, 5:34 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is online now
Registered User
 
Join Date: May 2010
Posts: 4,793
Quote:
Originally Posted by Mac Write View Post
Playing with Trolley buses to get them to spark is a lot of fun with Trams BC.
For a nice light show, get up early on a nice cold clear morning to watch the first trolleys scraping the frost off the overhead.
     
     
  #12849  
Old Posted Dec 11, 2014, 4:54 PM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,098
Quote:
Originally Posted by logan5 View Post
The Skytrain cars would accelerate to 88 miles per hour, then travel back to 1955. Great Scott!
Track to the future.

I believe that on the assumption of a direct hit to the train you'll blow out the computer and probably the inverters. Just because something is grounded doesn't mean anything in proximity is still safe. The last time an inverter blew up from a surge was back in 85 or something at the Millhaven yard. Shrapnel went up through the floor and into the cabin. I'm pretty sure they had to fortify the floors after that incident.
Assuming the lightning directly struck the power rails you would probably blow out the closest rectifier and nuke the primary regulators on the nearest train.
Grasping straws, if the signalling system got hit you would probably kill the closest loop transmitters and the VCC's would shut the system down. The horror of being trapped in a winter storm halfway across the SkyBridge. Nobody can reach you and you are not going anywhere.
     
     
  #12850  
Old Posted Dec 11, 2014, 7:16 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,682
Looks like it will be 0.5% PST increase.

Of note: on the list of improvements is a "tunneled expansion of the Millenium Line in Vancouver". So, no end point per say, but a tunnel.
     
     
  #12851  
Old Posted Dec 11, 2014, 7:34 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Quote:
Originally Posted by aberdeen5698 View Post
For a nice light show, get up early on a nice cold clear morning to watch the first trolleys scraping the frost off the overhead.
Lol it was an absolute light show being on the first #5 bus in Edmonton at -30. Too bad they scrapped their trolleys.
     
     
  #12852  
Old Posted Dec 11, 2014, 9:15 PM
Denscity Denscity is offline
Registered User
 
Join Date: Jun 2008
Location: Laramidia
Posts: 12,782
Quote:
Originally Posted by WarrenC12 View Post
Looks like it will be 0.5% PST increase.

Of note: on the list of improvements is a "tunneled expansion of the Millenium Line in Vancouver". So, no end point per say, but a tunnel.
Details??
__________________
Peak SSP:

28C is hotter than 42C
Vancouver is not on the ocean but Quebec City is.
     
     
  #12853  
Old Posted Dec 11, 2014, 9:19 PM
WBC WBC is offline
Transit User
 
Join Date: Aug 2007
Location: Metrotown/Downtown
Posts: 810
Quote:
Originally Posted by Denscity View Post
Details??
Tunnel all the way to Main Street!!!
     
     
  #12854  
Old Posted Dec 11, 2014, 11:55 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,682
Quote:
Originally Posted by WBC View Post
Tunnel all the way to Main Street!!!
Arbutus if you believe the diagrams. Completed within 10 years though, which means ~5 more years of dickering before any shovels hit the ground.
     
     
  #12855  
Old Posted Dec 12, 2014, 12:06 AM
Gordon Gordon is offline
Registered User
 
Join Date: Jul 2008
Posts: 1,065
Arbutus is the end of the line which is ok but this just moves the congestion further down the line, hopefully they could build the rest of the line later.
     
     
  #12856  
Old Posted Dec 12, 2014, 12:15 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by Gordon View Post
Arbutus is the end of the line which is ok but this just moves the congestion further down the line, hopefully they could build the rest of the line later.
I'd rather they build it straight to UBC too. But this will still have an immense reduction in 99 traffic. Lots of people work along the corridor to Arbutus. There will be many more people getting off before then than people that need to continue on the 99. I just hope when they do extend it in the future it's an extension of the Millennium Line and not a separate light rail line as has been suggested.
     
     
  #12857  
Old Posted Dec 16, 2014, 8:50 PM
lightrail lightrail is offline
Registered User
 
Join Date: Oct 2007
Posts: 809
Quote:
Originally Posted by GlassCity View Post
I'd rather they build it straight to UBC too. But this will still have an immense reduction in 99 traffic. Lots of people work along the corridor to Arbutus. There will be many more people getting off before then than people that need to continue on the 99. I just hope when they do extend it in the future it's an extension of the Millennium Line and not a separate light rail line as has been suggested.
The referendum has to be the dumbest move our Liberal government has made yet. It is short-sighted and without the Province pushing to support it, it is doomed to fail. The problem is there are no clear consequences for voting no and there is no plan B. It does not treat this as infrastructure that has huge returns on investment (such economic growth). And to make it worse the Province goes ahead and builds other infrastructure without referendums ($3 billion on the Port Mann Bridge and South Fraser Freeway, and untold billions on the Deas Island tunnel replacement).

But having said that, I am impressed with the improvements planned and the funding source seems reasonable. Now we just Tod Stone and the government to get behind it and help the region explain the benefits to everybody.

The below links detail the proposed improvements.
http://mayorscouncil.ca/wp-content/uploa...ct-Sheets-SouthofFraser_June-12-2014.pdf

http://mayorscouncil.ca/wp-content/uploa...l_Fact-Sheets-Vancouver_June-12-2014.pdf

http://mayorscouncil.ca/wp-content/uploa..._Fact-Sheets-NorthShore_June-12-2014.pdf

http://mayorscouncil.ca/wp-content/uploa...Sheets-Northeast-Sector_June-12-2014.pdf

http://mayorscouncil.ca/wp-content/uploa...il_Fact-Sheets-Richmond_June-12-2014.pdf

http://mayorscouncil.ca/wp-content/uploa...t-Sheets-BurnabyNewWest_June-12-2014.pdf
     
     
  #12858  
Old Posted Dec 16, 2014, 8:58 PM
Pinion Pinion is offline
See ya down under, mates
 
Join Date: Jul 2007
Posts: 5,167
Wait, the supposed "broadway line" will stop at Arbutus? That's bunk.

I wonder what they would do to the Lonsdale Quay bus loop.
     
     
  #12859  
Old Posted Dec 17, 2014, 9:14 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
TransLink hemorrhages riders since fare hike 5

Link

Quote:
TransLink had expected an additional 11.9 million more boardings on its bus and rail networks for the first nine months of the year — potentially increasing its revenue by $13.6 million — but riders have been shying away ever since the service hiked its fares in early 2013.

Initially, according to the service’s quarter-three financials, TransLink had expected rider numbers to increase from last year — but the reverse has occurred.

Current rider levels are actually below what they were last year and even further below projections.

TransLink communications vice-president Colleen Brennan said on Monday the service would not be seeking a fare hike for January 2015 — and there are no current plans for additional fare increases later in the year, though that could change.

“Any time you have a fare increase, you do expect there will be some impact to your ridership,” she said.

“In this case, it appears that impact lasted probably a little longer than we would’ve thought.”

Brennan pointed to unpublished October figures and said the authority, as of Oct. 31, only had 0.6% fewer riders compared to the same time last year, saying it’s a sign of recovery.

“What we’re seeing now is if you look at it over a longer period of time, it’s actually starting to level off.”

According to the numbers, TransLink’s bus fleet especially took heavy ridership losses. The company had 10.1 million fewer bus boardings than projected in the first nine months of 2014, a 5.7% decline in bus ridership.

Meanwhile, there were 1.79 million fewer rail boardings — including SkyTrain, Canada Line and West Coast Express — representing a 2% loss.

The bus network has more total overall passengers, but a breakdown reveals buses are taking losses 2.8 times more intensely than rail operations.

Brennan said this discrepancy isn’t something TransLink has examined yet.

More...
     
     
  #12860  
Old Posted Dec 17, 2014, 9:48 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
Big Bend bus route changes:

More bus stops for Burnaby's Big Bend

http://www.burnabynewsleader.com/news/285977211.html
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:49 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.