^^ Yikes! You both talk like it's just a matter of which button to push.

Why don't the two of you lobby for Exxon, Chevron, Apple, Google, Facebook etc. to move their HQ to Denver and build an iconic building that you'd be happy with. While you're at it take a referendum to the voters so we can get the additional tax revenue needed for the 🞵🞵🞵🞵 trains, stations etc. that Denver deserves. You have my full support.
__________________
Cool... Denver has reached puberty.
Reply With Quote
     
     
  #7822  
Old Posted Dec 2, 2014, 6:08 AM
jubguy3's Avatar
jubguy3 jubguy3 is offline
Registered User
 
Join Date: May 2014
Location: SL,UT
Posts: 984
We have a no frills philosophy in SLC. What have we ended up with?
  • crossing delays between courthouse and 2100 south
  • boring, uninspired design
  • mediorce attempts at graphic design - i want to make a helvetica 🞵🞵🞵🞵🞵 and shove it down UTAs throat so they stop using the halloween font
  • very little grade seperation
  • no attempt at integrating stations with their surroundings
  • heavy crowing at the courthouse station

Appreciate your attempt at creating a nice looking system. We will stick with our microsoft word designed bus schedules here. Seriously, look at our website. IT 🞵🞵🞵🞵🞵!

🞵🞵🞵🞵 you, UTA
Reply With Quote
     
     
  #7823  
Old Posted Dec 2, 2014, 4:15 PM
wong21fr's Avatar
wong21fr wong21fr is offline
Reluctant Hobbesian
 
Join Date: Feb 2002
Location: Denver
Posts: 13,126
Quote:
Originally Posted by jubguy3 View Post
no, seriously, denver should order S70 train. I checked the Light Rail design criteria and our trains are supposed to be in service until 2026, but I think they may need repairs that are more costly than placing the order for new trains and distributing them to places like Denver, San Fransisco, Norfolk, Minneapolis, etc.
No thanks. We'll order additional S70's or S200's, aside from the 12 that will be ordered next year, in about 7-8 years. I understand UTA replacing some of the 🞵🞵🞵🞵 vehicles they purchased from Santa Clara with S70's as those were already old when they were purchased. But, any entity that can't keep a piece of equipment operating for it's manufacturer's recommended operational lifespan needs to check their O&M procedures and practices, because something isn't right.
__________________
"You don't strike, you just go to work everyday and do your job real half-ass. That's the American way!" -Homer Simpson

All of us who are concerned for peace and triumph of reason and justice must be keenly aware how small an influence reason and honest good will exert upon events in the political field. ~Albert Einstein

Reply With Quote
     
     
  #7824  
Old Posted Dec 2, 2014, 5:46 PM
Cirrus's Avatar
Cirrus Cirrus is offline
cities|transit|croissants
 
Join Date: Jul 2001
Location: Washington, DC
Posts: 18,718
Quote:
Originally Posted by LAM
do we really think it's that difficult to maintain a couple or a few different vehicles... If they are from the same manufacturer, they might probably each have certain mechanical similarities.
Right. And Denver's peer cities mix models successfully. When a single city is the only place doing something, it begs the question of why. I'm sure this is saving RTD a little money. But I doubt it's very much. That's why I still wonder if there's a better technical reason.

Quote:
Originally Posted by jubguy3
We have a no frills philosophy in SLC. What have we ended up with?
I think it's great that SLC has been able to use a bare bones philosophy to build a really impressive network. No other comparably small city in the US has anything like SLC's rail system. If bare bones is what SLC had to do to get it built, that's OK with me. Better than not having it.

But even putting aside the railcars SLC bought used from San Jose, SLC has still bought multiple models directly from Seimens. That's a clue that keeping the same model doesn't save very much money.


from martijn van exel on flickr
__________________
writing | twitter | bluesky | flickr | instagram | ssp photo threads
Reply With Quote
     
     
  #7825  
Old Posted Dec 2, 2014, 5:55 PM
bunt_q's Avatar
bunt_q bunt_q is offline
Provincial Bumpkin
 
Join Date: Aug 2002
Location: Denver, CO
Posts: 13,203
Quote:
Originally Posted by Cirrus View Post
Right. And Denver's peer cities mix models successfully. When a single city is the only place doing something, it begs the question of why. I'm sure this is saving RTD a little money. But I doubt it's very much. That's why I still wonder if there's a better technical reason.
There's no better technical reason. It's because RTD, and its forum spokespeople, think they're better and smarter than any of our peer cities, and they know what's best. Period, end of story.
Reply With Quote
     
     
  #7826  
Old Posted Dec 2, 2014, 6:03 PM
wong21fr's Avatar
wong21fr wong21fr is offline
Reluctant Hobbesian
 
Join Date: Feb 2002
Location: Denver
Posts: 13,126
Quote:
Originally Posted by bunt_q View Post
There's no better technical reason. It's because RTD, and its forum spokespeople, think they're better and smarter than any of our peer cities, and they know what's best. Period, end of story.
Oh, bite me.
__________________
"You don't strike, you just go to work everyday and do your job real half-ass. That's the American way!" -Homer Simpson

All of us who are concerned for peace and triumph of reason and justice must be keenly aware how small an influence reason and honest good will exert upon events in the political field. ~Albert Einstein

Reply With Quote
     
     
  #7827  
Old Posted Dec 2, 2014, 6:10 PM
wong21fr's Avatar
wong21fr wong21fr is offline
Reluctant Hobbesian
 
Join Date: Feb 2002
Location: Denver
Posts: 13,126
Quote:
Originally Posted by Cirrus View Post
Right. And Denver's peer cities mix models successfully. When a single city is the only place doing something, it begs the question of why. I'm sure this is saving RTD a little money. But I doubt it's very much. That's why I still wonder if there's a better technical reason.
Possibly, it might also have been a) institutional inertia (Bunt's favorite rational), or b) a timing question. It looks as if a lot of SD-160's were purchased in the 2003-08 timeframe by different transit agencies and RTD might have been eager to piggyback on these orders.

But it probably was institutional inertia and RTD not wanting to try something new and shiny.
__________________
"You don't strike, you just go to work everyday and do your job real half-ass. That's the American way!" -Homer Simpson

All of us who are concerned for peace and triumph of reason and justice must be keenly aware how small an influence reason and honest good will exert upon events in the political field. ~Albert Einstein

Reply With Quote
     
     
  #7828  
Old Posted Dec 2, 2014, 7:24 PM
Cirrus's Avatar
Cirrus Cirrus is offline
cities|transit|croissants
 
Join Date: Jul 2001
Location: Washington, DC
Posts: 18,718
Speaking of shiny things, I'm really only commenting because it gives me an excuse to look up pretty pictures on Flickr and then share them.

Here are some more!



atlanta streetcar image from jttjr on flickr


toronto brt image from sean marshall on flickr


washington dc image from kevin mueller on flickr


And just for bunt, one with bikes!


san francisco image from andy tucker on flickr
__________________
writing | twitter | bluesky | flickr | instagram | ssp photo threads
Reply With Quote
     
     
  #7829  
Old Posted Dec 2, 2014, 7:53 PM
afrench afrench is offline
Registered User
 
Join Date: Feb 2014
Location: Golden, CO
Posts: 23
Interesting RTD fare structure discussion on /r/denver over the past couple of days.
Reply With Quote
     
     
  #7830  
Old Posted Dec 2, 2014, 7:55 PM
TakeFive's Avatar
TakeFive TakeFive is offline
Registered User
 
Join Date: Jun 2010
Posts: 8,438
Quote:
Originally Posted by Cirrus View Post
I think it's great that SLC has been able to use a bare bones philosophy to build a really impressive network. No other comparably small city in the US has anything like SLC's rail system. If bare bones is what SLC had to do to get it built, that's OK with me. Better than not having it.
Exactly, I think it's very impressive what Utah/SLC has accomplished.

To an extent the same goes for Denver. The Fastracks vote came at a great time b/c it passed. Unfortunately it also came with promises to build waaaay more than the changing economy would allow.

It would be naive IMO to not believe RTD got a good clearance price by not changing models from Siemens. Those savings along with an improving economy and hungry, now experienced transit builders allowed RTD to timely add two more lines that they previously were up in the air as to when they might be built.

I think it's also important to recognize that by being able to build the two additional lines that Denver Union Station and the neighborhood benefited. Who knows how much the positive impact from the additional energy on private developers that was created?

What's really important is that we got many more funky cool LRT cars.
__________________
Cool... Denver has reached puberty.
Reply With Quote
     
     
  #7831  
Old Posted Dec 2, 2014, 8:11 PM
bcp's Avatar
bcp bcp is offline
BANNED
 
Join Date: Jul 2001
Posts: 5,143
Quote:
Originally Posted by afrench View Post
Interesting RTD fare structure discussion on /r/denver over the past couple of days.

here is the video on the new options being jammed on denverites (i mean considered...)

http://www.rtd-denver.com/fare-restructuring.shtml

say good-bye to zones, which kinda made sense...

this is what they call simplifying...
- 4 new types of service
- pay for hours, OR
- pay for number of vehicle entries

and there is a lovely carve-out to hike up the fare for DIA service on a train...
Reply With Quote
     
     
  #7832  
Old Posted Dec 2, 2014, 8:44 PM
bunt_q's Avatar
bunt_q bunt_q is offline
Provincial Bumpkin
 
Join Date: Aug 2002
Location: Denver, CO
Posts: 13,203
Quote:
Originally Posted by TakeFive View Post
It would be naive IMO to not believe RTD got a good clearance price by not changing models from Siemens. Those savings along with an improving economy and hungry, now experienced transit builders allowed RTD to timely add two more lines that they previously were up in the air as to when they might be built.
This is the most absurd thing in this entire thread. Saving on rail vehicles enabled RTD to build two extra lines? It had nothing to do with massive infusions of private money to still not complete the program as initially envisioned (and poorly cost-estimated), despite an economic recovery. On the other hand, if RTD has correctly estimated and sized the program in the first place, once the economic recovery came along, we could've gotten shiny new trains, dumped the high blocks, and still moved ahead with private partnerships, which would've gotten us four new line. Yipee.

See what I did there? I made up some 🞵🞵🞵🞵 that supports what I think.
Reply With Quote
     
     
  #7833  
Old Posted Dec 2, 2014, 8:46 PM
wong21fr's Avatar
wong21fr wong21fr is offline
Reluctant Hobbesian
 
Join Date: Feb 2002
Location: Denver
Posts: 13,126
Quote:
Originally Posted by bcp View Post
here is the video on the new options being jammed on denverites (i mean considered...)

http://www.rtd-denver.com/fare-restructuring.shtml

say good-bye to zones, which kinda made sense...

this is what they call simplifying...
- 4 new types of service
- pay for hours, OR
- pay for number of vehicle entries

and there is a lovely carve-out to hike up the fare for DIA service on a train...
The easiest way would be to pay per vehicle entry with the 4 differing types of service, unless they wanted to go to a entirely cashless system and we could start charging just based on distance. I'm imagining that the four differing types of service will see a reduction in local fares, a hike in rails fares to compensate for the loss of the zones, and increases in the regional and airport fares.

$20 +/-$5 to the airport is what I'll bet.
__________________
"You don't strike, you just go to work everyday and do your job real half-ass. That's the American way!" -Homer Simpson

All of us who are concerned for peace and triumph of reason and justice must be keenly aware how small an influence reason and honest good will exert upon events in the political field. ~Albert Einstein

Reply With Quote
     
     
  #7834  
Old Posted Dec 2, 2014, 8:47 PM
wong21fr's Avatar
wong21fr wong21fr is offline
Reluctant Hobbesian
 
Join Date: Feb 2002
Location: Denver
Posts: 13,126
Quote:
Originally Posted by bunt_q View Post
See what I did there? I made up some 🞵🞵🞵🞵 that supports what I think.
Now cite some 🞵🞵🞵🞵🞵🞵🞵🞵 and tenuously-linked case-law as support.

Note: The idea that RTD saved money on the trains thereby saving FasTracks is silly.
__________________
"You don't strike, you just go to work everyday and do your job real half-ass. That's the American way!" -Homer Simpson

All of us who are concerned for peace and triumph of reason and justice must be keenly aware how small an influence reason and honest good will exert upon events in the political field. ~Albert Einstein


Last edited by wong21fr; Dec 2, 2014 at 9:05 PM.
Reply With Quote
     
     
  #7835  
Old Posted Dec 2, 2014, 9:39 PM
TakeFive's Avatar
TakeFive TakeFive is offline
Registered User
 
Join Date: Jun 2010
Posts: 8,438
Quote:
Originally Posted by bunt_q View Post
This is the most absurd thing in this entire thread. Saving on rail vehicles enabled RTD to build two extra lines? It had nothing to do with massive infusions of private money to still not complete the program as initially envisioned (and poorly cost-estimated), despite an economic recovery. On the other hand, if RTD has correctly estimated and sized the program in the first place, once the economic recovery came along, we could've gotten shiny new trains, dumped the high blocks, and still moved ahead with private partnerships, which would've gotten us four new line. Yipee.

See what I did there? I made up some 🞵🞵🞵🞵 that supports what I think.
LOL, you are insufferably silly at times.

So you presume RTD should have been able to foresee the tripling of copper prices and other basic materials in a couple of years after voter approval was obtained? If you've got that kind of predictive vision you should quit your day job and play the commodities market.

Furthermore if RTD would have envisioned a buildout cost of closer to $7 billion then the whole ballot question would have looked much different. Who knows if it would have even passed under such a scenario?

Oh Boy! Where are these "massive infusions of private money" you speak of? I missed that part.

The DTP P3 used a little over ! billion from RTD, a little over $1 billion thanks to the ARRA and then borrowed (IIRC) about $700 million from a division of Lloyds Banking Group, Plc. to cover their soft costs. They have zero skin in the game that I'm aware of. I assume their return will be sufficient to comfortably cover the payback & LIBOR on the Lloyds' loan and also return a fair management profit?

I don't know the particulars on the Aurora line but far as I can tell it's a largely a design build contract. Maybe Kiewit also borrowed to cover their soft costs and maybe even fronted some of the hard costs but it's no more than financial engineering. The advantage they brought was they could do this.

The reason RTD could go forward was the improving economics including better, growing tax receipts plus their whittling down of costs including the P3 by single tracking etc. which provided the extra room to move forward on both projects. If you don't think cost management was a key you are naive.
__________________
Cool... Denver has reached puberty.
Reply With Quote
     
     
  #7836  
Old Posted Dec 2, 2014, 10:41 PM
EngiNerd's Avatar
EngiNerd EngiNerd is offline
Registered User
 
Join Date: Sep 2005
Location: Englewood, CO
Posts: 2,003
Quote:
Originally Posted by TakeFive View Post
LOL, you are insufferably silly at times.

So you presume RTD should have been able to foresee the tripling of copper prices and other basic materials in a couple of years after voter approval was obtained? If you've got that kind of predictive vision you should quit your day job and play the commodities market.

Furthermore if RTD would have envisioned a buildout cost of closer to $7 billion then the whole ballot question would have looked much different. Who knows if it would have even passed under such a scenario?

Oh Boy! Where are these "massive infusions of private money" you speak of? I missed that part.

The DTP P3 used a little over ! billion from RTD, a little over $1 billion thanks to the ARRA and then borrowed (IIRC) about $700 million from a division of Lloyds Banking Group, Plc. to cover their soft costs. They have zero skin in the game that I'm aware of. I assume their return will be sufficient to comfortably cover the payback & LIBOR on the Lloyds' loan and also return a fair management profit?

I don't know the particulars on the Aurora line but far as I can tell it's a largely a design build contract. Maybe Kiewit also borrowed to cover their soft costs and maybe even fronted some of the hard costs but it's no more than financial engineering. The advantage they brought was they could do this.

The reason RTD could go forward was the improving economics including better, growing tax receipts plus their whittling down of costs including the P3 by single tracking etc. which provided the extra room to move forward on both projects. If you don't think cost management was a key you are naive.
I did a cost analysis a long while back when we first heard that Fasttracks was going over budget ($6.5b total cost at that point vs. $4.2b voted on amount) based on the stats provided by RTD and came to the conclusion that the shortfall due to tax receipts being down in the crappy economy at that time was only a small piece of the pie, and the simple fact was that RTD greatly underestimated what the costs for construction and land acquisition would, and naively thought the rail roads would play along when it came to sharing their ROWs. Like Bunt said, if tax receipts are going up now (and they are), then the shortfall should also be narrower, but its not.

Some of this was maybe unforeseeable, especially in regards to the cost of construction material escalation, but a lot of it was was just very poor cost estimating, using historically very skewed numbers in their cost analysis. And shouldn't they have had some of these land acquisition deals with the rail roads tentatively in the works before they asked the voters for their hard earned dollars?

It's really water under the bridge at this point, and I am glad that they getting to do full build-out even with all of the shortfalls.
__________________
"The engineer is the key figure in the material progress of the world. It is his engineering that makes a reality of the potential value of science by translating scientific knowledge into tools, resources, energy and labor to bring them into the service of man. To make contributions of this kind the engineer requires the imagination to visualize the need of society and to appreciate what is possible as well as the technological and broad social age understanding to bring his vision to reality."
Reply With Quote
     
     
  #7837  
Old Posted Dec 3, 2014, 12:09 AM
TakeFive's Avatar
TakeFive TakeFive is offline
Registered User
 
Join Date: Jun 2010
Posts: 8,438
^^ Interesting.

Supposedly they claimed they tried to be overly conservative and that may have been true regarding some things like inflation escalators that ended up being way short in the end anyway.

Regarding working with the railroads I'm sure the response they got was "Sure we'll work with you and be very reasonable. Get back to us if this ever becomes real." How they arrived at whatever estimate they made on this I have no idea.The big miss was in the NW Line but who cares?

The lost tax revenue was pretty significant for a few years but yeah I didn't focus on that. It was more the cost that was crazy.

It may be that as they made the proposal to voters they started to wonder about some of their own numbers but it's not good strategy to start waffling on the costs. It would have given the opponents too much fodder to have a field day with. Just speculating here.

I think to a great degree the task was just too overwhelming even if we assume they used their best efforts. Who ever envisioned voting on such a massive undertaking? Well it was how they believed they could get voter approval which was true of course. I imagine in real time a gazillion things came up they hadn't been able to anticipate.

QUESTION: You might know this to some degree.
Especially on the West line as an example, Denver did a massive amount of infrastructure improvements. I never knew how they decided this should be funded, through Fastracks or by the city. While some seemed necessary for accommodating the line other work was more like "we might as well get it done now" type.
__________________
Cool... Denver has reached puberty.
Reply With Quote
     
     
  #7838  
Old Posted Dec 3, 2014, 5:26 AM
EngiNerd's Avatar
EngiNerd EngiNerd is offline
Registered User
 
Join Date: Sep 2005
Location: Englewood, CO
Posts: 2,003
It has jokingly been said that Fastracks is a drainage improvement project with a rail component...it is all lumped as part of the deal.
__________________
"The engineer is the key figure in the material progress of the world. It is his engineering that makes a reality of the potential value of science by translating scientific knowledge into tools, resources, energy and labor to bring them into the service of man. To make contributions of this kind the engineer requires the imagination to visualize the need of society and to appreciate what is possible as well as the technological and broad social age understanding to bring his vision to reality."
Reply With Quote
     
     
  #7839  
Old Posted Dec 3, 2014, 4:06 PM
wong21fr's Avatar
wong21fr wong21fr is offline
Reluctant Hobbesian
 
Join Date: Feb 2002
Location: Denver
Posts: 13,126
Quote:
Originally Posted by EngiNerd View Post
Some of this was maybe unforeseeable, especially in regards to the cost of construction material escalation, but a lot of it was was just very poor cost estimating, using historically very skewed numbers in their cost analysis. And shouldn't they have had some of these land acquisition deals with the rail roads tentatively in the works before they asked the voters for their hard earned dollars?
One theory that has been batted around is that RTD's public survey's showed that support for FasTracks really started going down at the $5B project cost mark. So, they pencil-whipped the feasibility studies and cost estimates to get the whole project under $5B before taking it to the voters. You say poor cost estimating, they say management-driven cost estimating.
__________________
"You don't strike, you just go to work everyday and do your job real half-ass. That's the American way!" -Homer Simpson

All of us who are concerned for peace and triumph of reason and justice must be keenly aware how small an influence reason and honest good will exert upon events in the political field. ~Albert Einstein

Reply With Quote
     
     
  #7840  
Old Posted Dec 3, 2014, 5:42 PM
TakeFive's Avatar
TakeFive TakeFive is offline
Registered User
 
Join Date: Jun 2010
Posts: 8,438
Quote:
Originally Posted by EngiNerd View Post
It has jokingly been said that Fastracks is a drainage improvement project with a rail component...it is all lumped as part of the deal.
LOL, and when you think about it what a great strategy. IIRC the W Line received about 40% Federal participation. Plus there were misc. grants awarded for various aspects of the Fastracks projects.

Between Fastracks and the Better Denver Bonds a ton of upgraded drainage work has been done. Great way to accomplish "not 🞵🞵🞵🞵 to voters - unless it's your neighborhood" kind of infrastructure improvements. Most of Denver's drainage system was designed and built way back when and needed significant upgrading.

Just off the top, there's been I-25, South Broadway corridor, Tennyson Street, 40th Ave. Lakewood Gulch, City Park and an ongoing project towards the southeast, University and I'm sure that's just a partial list.

Quote:
Originally Posted by wong21fr View Post
One theory that has been batted around is that RTD's public survey's showed that support for FasTracks really started going down at the $5B project cost mark. So, they pencil-whipped the feasibility studies and cost estimates to get the whole project under $5B before taking it to the voters. You say poor cost estimating, they say management-driven cost estimating.
Makes sense. The strategy of offering everybody a piece of the pie was nifty but elections can be so unpredictable; can turn on a dime.
__________________
Cool... Denver has reached puberty.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Mountain West
Forum Jump



Forum Jump


All times are GMT. The time now is 11:00 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.