HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #9061  
Old Posted Oct 29, 2014, 8:19 PM
MasterG's Avatar
MasterG MasterG is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 1,820
Edmonton has 6 shops / coffee / snack bars built into train stations along their LRT and bus network, plus new ones opening. If I recall, Calgary used to have a few, but does not have any as of now. Many other systems in the world offer retail in transit stations, this is not a new idea, but perhaps one that requires a certain level of ridership and customer-expectation to be successful.

With the enormous ridership we have, could it be a time to look at offering these kind of spaces?

I could see this be a big draw for transit users to pick up some basics or a coffee shop at the busier stations. Even something like a Shoppers could work if they had enough space at certain stations.

Here is a description of Edmonton's service.

http://www.edmontonjournal.com/story_print.html?id=10312043&sponsor=
__________________
From the right side of the wrong side of the tracks.
     
     
  #9062  
Old Posted Oct 29, 2014, 9:03 PM
VIce VIce is offline
Registered User
 
Join Date: Nov 2013
Posts: 704
Quote:
Originally Posted by MasterG View Post
Edmonton has 6 shops / coffee / snack bars built into train stations along their LRT and bus network, plus new ones opening. If I recall, Calgary used to have a few, but does not have any as of now. Many other systems in the world offer retail in transit stations, this is not a new idea, but perhaps one that requires a certain level of ridership and customer-expectation to be successful.

With the enormous ridership we have, could it be a time to look at offering these kind of spaces?

I could see this be a big draw for transit users to pick up some basics or a coffee shop at the busier stations. Even something like a Shoppers could work if they had enough space at certain stations.

Here is a description of Edmonton's service.

http://www.edmontonjournal.com/story_print.html?id=10312043&sponsor=
Yeah I can remember these as a kid; all along the South line (to Anderson), NE line (to Whitehorn), and I believe Dalhousie all had a coffee shop / news stand thing. And at one point they just all got shuttered. You would think that a coffee shop would make a killing at a location like that.
     
     
  #9063  
Old Posted Oct 29, 2014, 9:25 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,595
It was not a money maker for the system.

I am not sure they could reopen them today without bathroom facilities.

Quote:
Fired kiosk workers blast city tactics: [FINAL Edition]
Collins, Ron Calgary Herald [Calgary, Alta] 20 Mar 1996: B.1.

This story contains an information box entitled "Concession Fact".

- The issue: City takeover of LRT concession stands.

- What's new: City closes them; 28 employees lose jobs.

- What's next: Looking for new private operators.

City hall thought it could do the job better than private enterprise. It couldn't.

And now 28 people who operated 11 LRT concession stands are out of work and the city is turning to the private sector for help.

City officials had hoped to make more than $20,000 in the first year of operation, after taking over the small stands from a private operator a year ago.

Instead the city lost $13,000.


``It was not successful,'' conceded parks and recreation acting director Kenn Knights.

The city was ``perhaps overzealous'' in its revenue expectations, said Knights.

Employees were informed in letters hand-delivered Monday night by couriers that their jobs had been terminated immediately.

``I couldn't believe it,'' said Jean Boucher, who ran the Franklin Station concession.

``It was like Nazi Germany banging on your door in the middle of the night,'' Boucher said Tuesday.

Judy Holt, who ran the University Station kiosk for the city, got the bad news Monday night that her $7.50-an-hour job had been eliminated.

``The employees were told last night at the end of their shifts to turn in their keys and (leave),'' said a furious Tom Chesterman, national representative for CUPE Local 38.

Chesterman said there had been a battle with the city over the status of the workers' union membership.

The workers were given one week's pay in lieu of notice.

``It's obvious they had this plan for quite a while and didn't have the decency to let us know,'' said laid-off worker Sheldon Winters.

``It could have been done in a more humane manner like a face-to-face meeting with employees,'' added Ald. Joanne Kerr.

The city took over the small kiosks from private industry in February of last year as a potential revenue generator that flopped.

``Transit is now working to get an interim operator in place as quickly as possible,'' so the small stores can reopen, said Calgary Transit spokeswoman Theresa Schadeck.

Concession Facts:

A request for bids for private industry to once again operate the kiosks on a permanent basis will be issued during the summer.

- City took over 11 LRT concession stands in February 1995.

- City hoped to make $20,000 in 1995, but lost $13,000.

- CUPE Local 38 crying foul as 28 city workers lose their jobs.

- City to seek bids for full-time private operator this summer.
Quote:
Former LRT concession operator mulls return to business: [FINAL Edition]
Calgary Herald [Calgary, Alta] 21 Mar 1996: B.2.

The man who operated 11 LRT concession stands until the city took them over a year ago says he might be willing to get back into the business again.

Taj Esmail ran the small stores for eight years, but then the city began running them in an attempt to generate revenue. Instead, it lost $13,000.

``I told the city then that they would lose money,'' Esmail said, adding he was forking over $130,000 annually in rent, business taxes and licensing fees.

On Monday, the city decided to get out of the LRT concession business and laid off 28 employees. The city is looking for an interim operator and during the summer will open up a bidding competition for permanent operators.

Esmail said whether he applies or not ``all depends on the terms and conditions of the proposal.

If the terms are fair and reasonable, I'll look at it,'' said the entrepreneur.

Esmail said that over the eight years he ran the booths with 18 employees, ``I had some good years and some bad years. But overall we did OK.''
     
     
  #9064  
Old Posted Oct 29, 2014, 9:36 PM
VIce VIce is offline
Registered User
 
Join Date: Nov 2013
Posts: 704
1996? I feel like I remember them into the early 2000s, perhaps it reverted back to a third-party run system?
     
     
  #9065  
Old Posted Oct 29, 2014, 9:59 PM
MasterG's Avatar
MasterG MasterG is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 1,820
Quote:
Originally Posted by MalcolmTucker View Post
It was not a money maker for the system.

I am not sure they could reopen them today without bathroom facilities.
That is a good point about bathroom facilities, it would be an issue to provide them, particularly if the structures don't have an easy/cheap-ish way to provide the piping and water lines, which I would suspect they don't.

However, I think the idea still has merit. When they shuttered in this article in the mid-1990s, ridership was less than half it is now. While most users are still downtown commuters, secondary nodes are taking shape, primary in the NW line, Chinook and a few key stations in the NE (perhaps Bridgeland & Whitehorn by PLC). The reach and level of service of the LRT is also much higher. Culturally the view of transit has changed and these are some ideas that could vastly improve the customer experience that could pay for itself through rent.

What I don't think is a good idea is for Calgary Transit to have a heavy hand in such a scheme. Perhaps they could make a short-list of which stations are most able to accommodate such a proposal (i.e. access to plumbing, level of work required to create a leasable space, type of demand for the spaces, number of users at different times of day etc.)

Some stations are clearly not used enough to support this (Banff Trail, 39th Ave, Canyon) or are used in a specific way that doesn't make sense. But all-day stations like SAIT, U of C, Whitehorn, Chinook and perhaps eventually Westbrook and Anderson might have merit.

Nothing like a mandated service such as the 1990s, but essentially opening up the station area to retail development and proposals. CT can be much more flexible than it is with its assets, ideas like this could be a good way to expand the service they offer.
__________________
From the right side of the wrong side of the tracks.
     
     
  #9066  
Old Posted Oct 29, 2014, 10:15 PM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by MalcolmTucker View Post
It was not a money maker for the system.

I am not sure they could reopen them today without bathroom facilities.
Don't most have facilities for the drivers? I think Whitehorn has a couple but I'm not sure if the rest of the stations would.
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.

Last edited by Full Mountain; Oct 29, 2014 at 10:38 PM.
     
     
  #9067  
Old Posted Oct 29, 2014, 11:04 PM
The Chemist's Avatar
The Chemist The Chemist is offline
恭喜发财!
 
Join Date: Aug 2001
Location: 中国上海/Shanghai
Posts: 8,875
Quote:
Originally Posted by VIce View Post
1996? I feel like I remember them into the early 2000s, perhaps it reverted back to a third-party run system?
Yeah, the kiosk at University was definitely open into the early 2000s, as I went there often during my time at the U of C (1998-2003).
__________________
"Nothing is too wonderful to be true, if it be consistent with the laws of nature." - Michael Faraday (1791-1867)
     
     
  #9068  
Old Posted Oct 29, 2014, 11:24 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Why are bathroom facilities needed? I mean I get the concept, but many 7-11s which serve food and coffee don't have public bathrooms, nor does a food stand or a food truck.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #9069  
Old Posted Oct 30, 2014, 2:03 AM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by DizzyEdge View Post
Why are bathroom facilities needed? I mean I get the concept, but many 7-11s which serve food and coffee don't have public bathrooms, nor does a food stand or a food truck.
Needed for employees not customers, workplace law require them
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
     
     
  #9070  
Old Posted Oct 30, 2014, 2:56 AM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Got it, thanks. There must have been a driver/employee washroom in the old Anderson/Southland/Chinook stations I'm thinking.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
  #9071  
Old Posted Oct 30, 2014, 11:03 AM
The Chemist's Avatar
The Chemist The Chemist is offline
恭喜发财!
 
Join Date: Aug 2001
Location: 中国上海/Shanghai
Posts: 8,875
AFAIC, all C-Train stations (except the downtown ones) should have public washrooms anwyay - I find it silly that they don't. It makes taking transit MUCH more bearable, IMO. I can't count how many times I've been on the Metro here in Shanghai and needed to use a washroom - and fortunately most stations here have either platform level public toilets or public toilets somewhere else in the station.
__________________
"Nothing is too wonderful to be true, if it be consistent with the laws of nature." - Michael Faraday (1791-1867)
     
     
  #9072  
Old Posted Oct 30, 2014, 11:27 PM
J-D J-D is offline
Registered User
 
Join Date: Mar 2010
Posts: 231
Quote:
Originally Posted by The Chemist View Post
AFAIC, all C-Train stations (except the downtown ones) should have public washrooms anwyay - I find it silly that they don't. It makes taking transit MUCH more bearable, IMO. I can't count how many times I've been on the Metro here in Shanghai and needed to use a washroom - and fortunately most stations here have either platform level public toilets or public toilets somewhere else in the station.
The difference is mostly in population and in labor costs. The stations in Asia that have public washrooms have full time security guards and people to clean the washrooms constantly. Public washrooms don't work too well here as the City discovered in the east village.
     
     
  #9073  
Old Posted Nov 6, 2014, 4:53 AM
joe498 joe498 is offline
Registered User
 
Join Date: Aug 2013
Posts: 295
Efficiency makes sense as Calgary Transit scales back, says councillor

http://www.calgaryherald.com/news/calgar...+Transit+scales+back/10356690/story.html

"Calgary buses and trains will roll for 10,000 fewer hours in 2015 than this year. That’s a relatively puny cut in an overall system of just under 2.8-million service hours, but comes amid continued population growth and hikes to both fares and property taxes — the two key ingredients of Calgary Transit revenue."
     
     
  #9074  
Old Posted Nov 7, 2014, 6:43 PM
MasterG's Avatar
MasterG MasterG is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 1,820
From the roads thread in reference to the Barlow / 19th Street / Deerfoot interchange upgrades:
Quote:
Originally Posted by fusili View Post
Another complete neglect of the Route Ahead plan. They have a BRT going along 16th avenue here. Not saying they need to build transit lanes now, but shouldn't they at least show space for future dedicated transit lanes.
Does Calgary Transit even have a voice in all of this? It always seems like their activities, plans and upgrades are always delayed, ignored or not fought for by anyone. Councillors often seem to not be able to do more than provide lip-service to promote transit investment.
  • Credit cards at transit stations took several months after the first one was rolled out before they were wide-spread.
  • Their 5? + year, and still ongoing, 4-car extension project
  • Real-time bus information, website upgrades - identified as required years ago - was supposed to be delivered "only a few weeks from now". That was several months ago
  • The connect card saga, now slated for early-2015??
  • Reserving a bus-lane on designated BRT route a huge bridge project that costs the same as their entire 4-car upgrade program. Nope.

Meanwhile Calgary Transit are getting a slight cut in their budget this year, despite record growth in population, ridership and demand for transit in all quadrants. I'm all for eliminating low-ridership routes to improve efficiency, but this should be done in conjunction of overall expansion of the effective routes, namely the Route Ahead plans.

I am not sure if they are lacking political influence, effective project management or simply the ability to attract funding in a tax-adverse jurisdiction. Whatever the reasons it is frustrating to see so little progress while other things are happening with such large numbers.
__________________
From the right side of the wrong side of the tracks.

Last edited by MasterG; Nov 7, 2014 at 10:27 PM.
     
     
  #9075  
Old Posted Nov 8, 2014, 5:06 PM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Noticed that the steel work for the expansion of Spring Gardens is mostly up, will make that bus facility even more impressively large.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #9076  
Old Posted Nov 8, 2014, 6:06 PM
MasterG's Avatar
MasterG MasterG is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 1,820
I spoke too soon: new website and real-time data launches Monday!
__________________
From the right side of the wrong side of the tracks.
     
     
  #9077  
Old Posted Nov 10, 2014, 6:22 PM
joe498 joe498 is offline
Registered User
 
Join Date: Aug 2013
Posts: 295
Quote:
Originally Posted by MasterG View Post
I spoke too soon: new website and real-time data launches Monday!
And here it is!

http://www.calgarytransit.com/

Much improved.

Good article related to this: http://crackmacs.ca/index.php/2014/11/calgary-transit-surprise-new-website/

Improvements to SE Calgary transitway could cut commute time in half:

http://globalnews.ca/news/1655881/improv...ansitway-could-cut-commute-time-in-half/

Last edited by joe498; Nov 10, 2014 at 6:32 PM.
     
     
  #9078  
Old Posted Nov 10, 2014, 7:35 PM
Aegis's Avatar
Aegis Aegis is offline
Analyst, Commercial Mtgs
 
Join Date: Sep 2006
Location: Bankview
Posts: 1,457
http://www.calgarytransit.com/plans-projects/lrt/plans-and-projects-red-line

According to this website, the last of the station upgrades to 4-car capacity will be completed in late 2014, but they aren't expecting to start 4-car trains until late 2015. Why the 1 year delay?
     
     
  #9079  
Old Posted Nov 10, 2014, 7:54 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Quote:
Originally Posted by Aegis View Post
http://www.calgarytransit.com/plans-projects/lrt/plans-and-projects-red-line

According to this website, the last of the station upgrades to 4-car capacity will be completed in late 2014, but they aren't expecting to start 4-car trains until late 2015. Why the 1 year delay?
They won't have enough LRVs to start running 4 car trains until then.
     
     
  #9080  
Old Posted Nov 10, 2014, 8:28 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
Weren't some of the new LRVs supposed to also replace existing old ones? If so I wonder if we could delay retirement for a year and get 4 car consists running sooner.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 2:07 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.