Quote:
Originally Posted by GlassCity
I pretty much never go to Surrey so obviously I have an outsider's perspective, but looking at all the information I have available I've always felt that Surrey's transit woes have been really exaggerated. It seems that just about every north-south street has a bus route with half-hour frequencies, which is the same thing we have in Richmond.
As it should. Broadway is clearly in much greater need of SkyTrain than Surrey. But even then, is SkyTrain not worth a 20 year wait? If the 99 is somehow able to hang on for now, I'm sure both the 96 and 502 can as well. I just don't want to see Surrey get a second-rate solution simply because of impatience.
Well isn't that due to relatively low ridership? I mean that's basically what the 97's frequencies are like so it's not like it's unprecedented or discriminatory.
Both the 502 and the 319 on Scott Road are on the Frequent Transit Network so I'm not sure how they're not on the radar. The 502 gets around the same ridership as the 401 that I'm very familiar with, and yes while it's really packed and sometimes late it doesn't really seem like a huge problem. And if the 503 hasn't increased frequencies for residents in Fleetwood for example, I imagine it would at least provide quite a bit of relief to the 502, resulting in less packed buses and better on-time performance, no?
|
First off, I will clarify that I am not pro-LRT. Once LRT is built; there is likely no going back.
Definitely agree, the Broadway expansion should have been built long before the Evergreen Line. Ideally, Surrey would invest in BRT infrastructure and perhaps make a push for Skytrain when time permits. Though, like I said, it is well known that Translink and Surrey do not see eye to eye, and haven’t for quite some time. Delaying the implementation of the B-Line in 2011 was when it went south and forced Surrey leaders to legitimize themselves by going down this route. It was a very strange turn of events.
The 503 has provided some relief for Fleetwood residents outside of rush-hour, but has still done nothing to address overcrowding during rush-hour. Personnel were on hand in early October and found some people waiting after 2 ½ buses. I still argue that the Fraser Highway B-Line was perhaps a bigger priority than the 104th/KGB B-Line.
Planners want Rapid Transit because it is a draw, especially for commuters that are Vancouver/Burnaby bound. Though I feel LRT won’t draw as many new riders since it will be at grade, slower and require an additional connection to go to Vancouver/Burnaby/Coquitlam.
Ultimately I do believe a Skytrain down Fraser Highway with a BRT network down KGB and 104th would be the best option but I truly get the sense we may see shovels in the ground by late 2016 for an LRT network.
Quote:
Originally Posted by nname
This is partially due to fact they introduce too much service. As far as I remember, new services were used to be introduced at much lower frequency. The 96 in particular has the best service for all 4 B-Lines at introduction I believe.
|
The 96 sees terribly low ridership outside of peak-hours. I even said at the time it was a dumb move to have frequencies that high outside of peak-hour.
Quote:
And the reason for this is they don't have extra money to add new service. Guess where these marginal increases in service coming from? They are from cutting services elsewhere, more specifically, Burnaby, Tri-Cities, and Richmond. and there are only so much service they can trim from there.
Just compare the service in 3 area with population of ~620k after taking out the effect of running-time adjustments...

Its funny how every other region worries about losing service while Surrey is complaining that they don't get that big of an improvement...
|
Exactly, and this is why this municipality has gone about securing funding to build a rapid transit network. Not sure what entity is going to run or maintain the LRT network. A PPP would already be the first step towards failure.
I get what you’re saying. Many routes in Vancouver/Burnaby are in even worse shape. Heck, the 49, 41 130, and 135 have yet to be addressed.
Until the Provincial Govt gets its head out of its ass, then we will all have to deal with inadequate service. Do I condone the City of Surrey’s approach? Heck no, we are likely going to build something that will be a headache for decades to come.
Quote:
The 97 was introduced by cutting all local services in some part of the corridor. In fact, they trim the 97 as often as the 96 (from every 10min to 10.33min to 10.5min off-peak), and ridership for 97 is also increasing. They are just trying to squeeze every bit of milk out of the cows...
Its actually around 10%, though they may downsize some of the buses too.
|
10% since the last alteration. 25% since last year.
Quote:
|
The introduction of 503 result in ~22% increase of service. Not sure how much it helped, but 503 does remove some Langley riders from 502 so it should free up some rooms there.
|
Thus far it has not resulted in much improvement during peak-hour. Still very long lines for the 502.
Quote:
|
There were a ~4% increase in service for the 319 this year.
|
2 buses added during peak-hour and still a high number of pass-ups. Though I think the onus is up to the city to add queue jumpers, and right-turn lanes to allow buses to stick to a timely schedule but this is still a corridor that’s being overlooked in the 10 year plan. To be fair, the City has overlooked it as well.