So much has happened in the last year at East Village with the bridge opening, with First and Evolution rising from the ground.

Around this time next year (Fall 2015) what do you think East Village will be like?

I think think there will be more people walking around as I'm sure the condos that are under construction right now will completed. National Music Centre will be finishing up hopefully...

What do you guys expect to see or hope to see
Reply With Quote
     
     
  #1142  
Old Posted Oct 23, 2014, 3:53 PM
UofC.engineer's Avatar
UofC.engineer UofC.engineer is offline
Laura Palmer
 
Join Date: Nov 2010
Location: Twin Peaks, Calgary, AB
Posts: 1,033
Quote:
Originally Posted by *Stardust* View Post
What do you guys expect to see or hope to see
I hope that East Village is such a success that the West Village Redevelopment breaks ground by 2020. Once again managed by the CMLC.
Reply With Quote
     
     
  #1143  
Old Posted Oct 23, 2014, 3:58 PM
The Fisher Account's Avatar
The Fisher Account The Fisher Account is offline
Registered User
 
Join Date: Oct 2009
Location: Bridgeland - Calgary, AB
Posts: 1,023
I'm looking forward to St. Patrick's Island being a destination for people. The ice rink, beach, etc will all be excellent seasonal hotspots. Not to mention the ease of skipping over to the EV for drinks and eats at the Simmons building
Reply With Quote
     
     
  #1144  
Old Posted Oct 23, 2014, 4:30 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
It'll be great to see more of the EV waterfront developed with some new shops plus the riverwalk, island etc. Bonus once the Bosa/Riocan block is complete, and there will be another interesting couple blocks of development around the NMC.

I don't think the EV will have a full neighborhood feel until at lease some of those interior lots are filled as well, prob 6 or 7 years, but the infrastructure/amenities coming are enough to make most neighborhoods envious.
Reply With Quote
     
     
  #1145  
Old Posted Oct 23, 2014, 4:36 PM
Jimby's Avatar
Jimby Jimby is offline
not a NIMBY
 
Join Date: May 2007
Location: Calgary
Posts: 8,796
There is a big ad for Slokker-West in today's Herald and they say they are building 965 units in 7 buildings in the EV.
Reply With Quote
     
     
  #1146  
Old Posted Oct 23, 2014, 5:27 PM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,689
Quote:
Originally Posted by Jimby View Post
There is a big ad for Slokker-West in today's Herald and they say they are building 965 units in 7 buildings in the EV.
Isn't that just First, Verve, etc?
Reply With Quote
     
     
  #1147  
Old Posted Oct 23, 2014, 5:34 PM
Jimby's Avatar
Jimby Jimby is offline
not a NIMBY
 
Join Date: May 2007
Location: Calgary
Posts: 8,796
Quote:
Originally Posted by Wooster View Post
Isn't that just First, Verve, etc?
Yes but I didn't know there were going to be so many units. 965 units must be second in number to only Waterfront which is going to have a 1,000 units when finished.
Reply With Quote
     
     
  #1148  
Old Posted Oct 23, 2014, 5:44 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Quote:
Originally Posted by *Stardust* View Post
So much has happened in the last year at East Village with the bridge opening, with First and Evolution rising from the ground.

Around this time next year (Fall 2015) what do you think East Village will be like?

I think think there will be more people walking around as I'm sure the condos that are under construction right now will completed. National Music Centre will be finishing up hopefully...

What do you guys expect to see or hope to see
By this time next year, Verve, Hilton, and NCL will be well out of the ground, Pulse and NMC will be getting ready to open, ALT Hotel will be close to excavation, and a couple other projects should be joining it And of course First, Fuse, Evolution (lowrise), and Simmons will have been open for months Not to mention the grand puba of the neighbourhood being open... St. Patrick's Island Park


Quote:
Originally Posted by The Fisher Account View Post
I'm looking forward to St. Patrick's Island being a destination for people. The ice rink, beach, etc will all be excellent seasonal hotspots. Not to mention the ease of skipping over to the EV for drinks and eats at the Simmons building
Don't forget about the two restaurants going into the XYC Building next to Simmons!!!


Quote:
Originally Posted by Wooster View Post
Isn't that just First, Verve, etc?
I'm pretty sure that First and Verve together are only around 600 units. So another ~370 would equate to another huge building or two medium sized buildings yet to be proposed. Very exciting
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #1149  
Old Posted Oct 23, 2014, 6:15 PM
MichaelS's Avatar
MichaelS MichaelS is offline
Registered User
 
Join Date: Jan 2006
Location: Calgary
Posts: 2,402
Quote:
Originally Posted by Jimby View Post
Yes but I didn't know there were going to be so many units. 965 units must be second in number to only Waterfront which is going to have a 1,000 units when finished.
I think London at Heritage Station has them both beat once all 4 towers are built out (over 1300 I think). And don't say it will never happen, I think a DP came in recently for the 2 middle ones.....
Reply With Quote
     
     
  #1150  
Old Posted Oct 23, 2014, 6:16 PM
DizzyEdge's Avatar
DizzyEdge DizzyEdge is offline
My Spoon Is Too Big
 
Join Date: Oct 2006
Location: Calgary
Posts: 9,162
When are the expected move in dates for the EV buildings currently well under construction.. or guesses if there are none.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
Reply With Quote
     
     
  #1151  
Old Posted Oct 23, 2014, 6:26 PM
Jimby's Avatar
Jimby Jimby is offline
not a NIMBY
 
Join Date: May 2007
Location: Calgary
Posts: 8,796
Quote:
Originally Posted by MichaelS View Post
I think London at Heritage Station has them both beat once all 4 towers are built out (over 1300 I think). And don't say it will never happen, I think a DP came in recently for the 2 middle ones.....
I think having Save-On and other stores and services should help sell condos. Hopefully the new towers will be better looking than the existing 2!
Reply With Quote
     
     
  #1152  
Old Posted Oct 23, 2014, 6:39 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Quote:
Originally Posted by DizzyEdge View Post
When are the expected move in dates for the EV buildings currently well under construction.. or guesses if there are none.
First and Fuse are sometime in the spring. Not sure about Pulse.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #1153  
Old Posted Oct 23, 2014, 6:57 PM
outoftheice outoftheice is offline
Registered User
 
Join Date: Jan 2009
Posts: 914
Quote:
Originally Posted by Chadillaccc View Post
I'm pretty sure that First and Verve together are only around 600 units. So another ~370 would equate to another huge building or two medium sized buildings yet to be proposed. Very exciting
This picture gives you a general idea as to what Fram+Slokker has proposed for the East Village. First is already shown on there and is well under construction.



Lot 'M' is the RiverHouse Project:



Lot 'Q' is divided into four projects. The first one, now selling is Verve:



My understanding based on conversations with people at the East Village sales centre is that the other three 'Q' parcels will be divided up as follows:

1: Mid Rise Commercial building with main floor retail on the west side of the lot across from Verve. Construction expected slightly after Verve gets going (kinda like how Bosa has phased the taller tower in the Evolution project)
2: High Rise (equal to, or slightly taller than Verve) with sales to begin once Verve is out of the ground.
3: Second Mid Rise building that may either be commercial or residential. Last I heard they still hadn't quite made up their minds.

The last parcel, lot 'N' will be a 8ish story mid rise project and will be the very last project that is developed. This one is expected to be luxury condos and although I haven't seen any renderings for it, the massing model in the East Village sales centre shows it to be very similar in design to RiverHouse (with large terraced balconies overlooking Fort Calgary and the River).

Source for images: http://www.thenewcalgary.com/
Reply With Quote
     
     
  #1154  
Old Posted Oct 23, 2014, 7:07 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
So I guess all 7 of those parcels put together equal the 965 units.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #1155  
Old Posted Oct 23, 2014, 7:23 PM
H.E.Pennypacker's Avatar
H.E.Pennypacker H.E.Pennypacker is offline
Registered User
 
Join Date: May 2013
Posts: 1,941
Do we know what's going to be built on the lot directly west of block Q?
Reply With Quote
     
     
  #1156  
Old Posted Oct 23, 2014, 10:24 PM
nick.flood's Avatar
nick.flood nick.flood is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,261
delete

Last edited by nick.flood; Feb 5, 2016 at 6:25 PM.
Reply With Quote
     
     
  #1157  
Old Posted Nov 2, 2014, 5:07 PM
outoftheice outoftheice is offline
Registered User
 
Join Date: Jan 2009
Posts: 914
Walked through the East Village yesterday and noticed that they've got the forms up to pour the roof for the top floor of First. Guess that means it's essentially topped out. Great to see the progress being made in the area. Looking forward to seeing Pulse and the EV Hilton rise out of the ground over the next few months!!
Reply With Quote
     
     
  #1158  
Old Posted Nov 3, 2014, 4:26 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
The new park is finished in EV, Verve site finally being cleared of the infrastructure related const materials, so they might finally get going.
Reply With Quote
     
     
  #1159  
Old Posted Nov 3, 2014, 4:28 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
From DM, can see the lookout they're building on the island too.
Quote:
Originally Posted by Design-mind View Post
Looks to be close to the same height as Fuse.

Reply With Quote
     
     
  #1160  
Old Posted Nov 24, 2014, 7:42 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
Education, residential mix eyed for Calgary’s Booth Centre in East Villlage
By Jeremy Nolais
Metro
Share this Article


Metro/Helen Pike The Booth Centre, seen here, is owned by the Calgary Board of Education. Officials have given hints at a new use for the site, damaged in the 2013 flood.
Once a homeless shelter, a storied East Village centre could someday play host to the city’s first primary education, residential mixed-use site.

The Calgary Board of Education has convened talks with contractors and members of the Calgary Municipal Land Corporation, which is leading the village’s rejuvenation, about the site’s future.

It was originally suppose to house the adult-education Chinook Learning Services program, but damage sustained in the 2013 historic flood threw a wrench into those plans. The CBE now plans to move the Chinook Learning Services program in Tuxedo Park in with the rest of its adult-learning programs at the Viscount Bennett Centre.

Related:
French Immersion program enrolment in Alberta continues upward trend
Twenty Calgary Board of Education schools already have functioning gay-straight alliances
Alberta testing schedules, pilots mired in uncertainty
Frank Coppinger, the CBE’s superintendent for facilities and environmental services, shed a little light on future plans for Booth at a briefing late last month.

“Our hope is that there would be interest in the developer community to demolish that building, put in underground parking and a combination of an education facility and residential complex on top,” he said at the time.

From 1988 to 2011, the Salvation Army ran the Booth Centre as a homeless shelter with 200 spaces, but, at the time of its closing, it was less than a quarter full.The site was turned over to the CBE and approved for provincial funding to house Chinook Learning in mid-2012.

Neither Coppinger nor Susan Veres, vice-president of marketing and communications for CMLC, could name another site in the city that would be quite like the future Booth Centre.

Veres did say, “the mix of use for East Village is critical.”

“The entire master plan for the community imagines this community as having a range of uses . . . with more uses, come more users, the more people on the streets day and night and it really helps us to establish a healthy community.”
http://metronews.ca/news/calgary/1220873...-calgarys-booth-centre-in-east-villlage/
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 9:08 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.