HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #9001  
Old Posted Oct 17, 2014, 7:54 PM
YYCguys YYCguys is offline
Registered User
 
Join Date: Sep 2006
Posts: 2,624
Quote:
Originally Posted by MasterG View Post
An alternative: Why does this train have to go down 2nd Street at all? Why can't it drop underground between 3rd Ave and 4th Ave on Centre when it exits the bridge and continue deep enough that it goes under the CPR tracks at an angle on Centre to connect with the SELRT? Yes, you miss Eau Claire by a block but put the core transfer station at Centre - 7th Ave - 8th Ave by Telus Convention Centre, the Bow, Telus Sky, Petro-Canada and many other mega-buildings; hardly a poor compromise. Surely this cost would be similar than a weird turn onto 2nd Street before heading underground? But this removes the need to turn awkwardly off the bridge and keeps the speed higher.

Hell, it can re-enter a cut-and-cover tunnel immediately after the Bridge to the North too, essentially keep the entire subway plan, minus the expensive, challenging and awkward grade climb of both avoiding the Centre Street Bridge while being underground under the river.

Not sure if that makes sense, perhaps I need to provide a diagram.
Please do, because I read and re-read your idea, and I'm sure it sounds great, but I can't visualize what you are describing.
     
     
  #9002  
Old Posted Oct 17, 2014, 8:22 PM
joe498 joe498 is offline
Registered User
 
Join Date: Aug 2013
Posts: 295
Latest from @LRTontheGreen examines Denver and how they built 76km of LRT track.

The Search for Funding Solutions: Looking South

http://www.lrtonthegreen.ca/lrtotg-posts/funding-south/
     
     
  #9003  
Old Posted Oct 17, 2014, 8:32 PM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by MasterG View Post
I think criticism of the on-street approach is over-blown. Not as effective as underground, but given that no one wants to suggest taxes need to be raised, a federal government that couldn't care less about the cities to fund them properly and the provincial government can't seem to figure out a reliable, substantive funding arrangement for a city larger than 100,000 people I can hardly blame Calgary Transit for recommending the view they took. They even say that underground is ideal, but can't afford it with the current arrangement.

With proper coordination and signal priority - as well as dedicated lanes with full priority over auto traffic - on street could be effective. At grade stations, with low-floors and minimal infrastructure can be quite quick. Modern low-floor lines have no requirement for being set in the rock-ballast, they can have paved surfaces to double as emergency lanes for first-responders. Key intersections can be tunneled like 16th Ave and McKnight.

An alternative: Why does this train have to go down 2nd Street at all? Why can't it drop underground between 3rd Ave and 4th Ave on Centre when it exits the bridge and continue deep enough that it goes under the CPR tracks at an angle on Centre to connect with the SELRT? Yes, you miss Eau Claire by a block but put the core transfer station at Centre - 7th Ave - 8th Ave by Telus Convention Centre, the Bow, Telus Sky, Petro-Canada and many other mega-buildings; hardly a poor compromise. Surely this cost would be similar than a weird turn onto 2nd Street before heading underground? But this removes the need to turn awkwardly off the bridge and keeps the speed higher.

Hell, it can re-enter a cut-and-cover tunnel immediately after the Bridge to the North too, essentially keep the entire subway plan, minus the expensive, challenging and awkward grade climb of both avoiding the Centre Street Bridge while being underground under the river.

Not sure if that makes sense, perhaps I need to provide a diagram. But that saves the cost of the deep-bore tunnel, maintains access in Crescent Heights and get's people the underground experience they want. Think of how the Bloor Street subway uses the Prince Edward Viaduct while entering and existing the tunnel just for the bridge structure over the Don Valley in Toronto.

It still requires two lanes of the bridge, but as of 2017 those will be taken away anyway with the BRT lanes. They are hardly needed anyway in a world with vastly improved capacity by adding a LRT like this.

I suppose tunneling under the Tower complex would pose a challenge, as would the interfaces between the tunnel portals (but hardly as difficult as the expensive full underground approach), but that is what the engineers are for. Surely they could figure out how to make that work.

Thoughts?
I still think it should be elevated coming through the downtown and then be left with less of a grade as it crosses the river. Running as a plus 15, it would connect directly with our existing +15 network.
     
     
  #9004  
Old Posted Oct 17, 2014, 8:35 PM
lubicon's Avatar
lubicon lubicon is offline
Suburban dweller
 
Join Date: Jun 2003
Location: Calgary - our road planners are as bad as yours Edmonton
Posts: 5,047
Quote:
Originally Posted by joe498 View Post
Latest from @LRTontheGreen examines Denver and how they built 76km of LRT track.

The Search for Funding Solutions: Looking South

http://www.lrtonthegreen.ca/lrtotg-posts/funding-south/
This is exactly what I had in mind and would be fully supportive of.
__________________
Two things are infinite: the universe and human stupidity; and I'm not sure about the the universe.

Albert Einstein
     
     
  #9005  
Old Posted Oct 17, 2014, 9:07 PM
lineman's Avatar
lineman lineman is offline
power to the people!
 
Join Date: Oct 2008
Location: Crescent Heights, Calgary
Posts: 864
Quote:
Originally Posted by joe498 View Post
Latest from @LRTontheGreen examines Denver and how they built 76km of LRT track.

The Search for Funding Solutions: Looking South

http://www.lrtonthegreen.ca/lrtotg-posts/funding-south/
Knowing that low floor trains are the rage right now with uber urbanists and the green line will probably consist of these, I hope they're not like the Denver ones where a person has to take three steps up. It looks like an accessibility nightmare for those with limited mobility.


http://metro-cincinnati.org/wp-content/uploads/2010/08/rtd_lg.jpg
Ugh.

Last edited by lineman; Oct 17, 2014 at 9:33 PM.
     
     
  #9006  
Old Posted Oct 17, 2014, 9:19 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
I wouldn't call that a low floor train.
__________________
Not everything that can be counted counts, and not everything that counts can be counted.
     
     
  #9007  
Old Posted Oct 17, 2014, 9:22 PM
lineman's Avatar
lineman lineman is offline
power to the people!
 
Join Date: Oct 2008
Location: Crescent Heights, Calgary
Posts: 864
Low opening high floor train?
     
     
  #9008  
Old Posted Oct 17, 2014, 9:27 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,633
     
     
  #9009  
Old Posted Oct 17, 2014, 9:38 PM
joe498 joe498 is offline
Registered User
 
Join Date: Aug 2013
Posts: 295
     
     
  #9010  
Old Posted Oct 17, 2014, 10:01 PM
simster3 simster3 is offline
Registered User
 
Join Date: Aug 2012
Posts: 286
Everything about that image is confusing.
     
     
  #9011  
Old Posted Oct 17, 2014, 10:05 PM
simster3 simster3 is offline
Registered User
 
Join Date: Aug 2012
Posts: 286
Quote:
Originally Posted by joe498 View Post
Thats awesome that 10% are new transit riders. That is a huge impact on the roads.
     
     
  #9012  
Old Posted Oct 17, 2014, 10:12 PM
lubicon's Avatar
lubicon lubicon is offline
Suburban dweller
 
Join Date: Jun 2003
Location: Calgary - our road planners are as bad as yours Edmonton
Posts: 5,047
Great initial results for the Tuscany Station. I know several of my kids friends are using it to get to school rather than taking the school bus. It is much faster and more flexible for their schedules. And for them it's a dead simple trip to make.
__________________
Two things are infinite: the universe and human stupidity; and I'm not sure about the the universe.

Albert Einstein
     
     
  #9013  
Old Posted Oct 17, 2014, 10:23 PM
speedog's Avatar
speedog speedog is offline
Moran supreme
 
Join Date: Sep 2010
Posts: 2,579
Quote:
Originally Posted by Full Mountain View Post
And everyone is going to cry foul because you're only taxing drivers. A general sales tax is by far a more equitable way of getting the money.

1. It taxes everyone
2. It's only applicable to non essential purchases, so it impacts the lower income portions of the population less
Transit buses use fuel as well - seems equitable as transit users would contributing less to the system as compared to someone using their private vehicle. Everyone pretty much utilizes a motorized form of transportation in Calgary and would be contributing fairly - those driving more fuel efficient vehicles would contribute less, those driving lifted gas guzzling 4x4's or powerful sports cars would pay more in fuel taxes, seems fair, no?
__________________
Just a wee bit below average prairie boy in Canada's third largest city and fourth largest CMA
     
     
  #9014  
Old Posted Oct 17, 2014, 11:04 PM
RyLucky's Avatar
RyLucky RyLucky is offline
Registered User
 
Join Date: Feb 2012
Posts: 2,498
Quote:
Originally Posted by craner View Post
I'm with Chad and the others who think we need to start thinking and planning for a city of 2+million. This surface LRT decision is 🞵🞵🞵🞵 and very dissapointing.
I for one would welcome a dedicated tax for transportation projects.
I was disappointed to hear the city is giving up on a tunnel, but not surprised in the least. Frankly, even the cheapest possible SE/NCLRT will take decades to fund at current funding levels. Without new taxes or huge provincial windfalls, it will never happen.

The one saving grace of their plan, is I believe it keeps the possibility open to one day extend the 2nd st tunnel northward, kind of like how there is a tunnel under 8th st at City Hall. The tunnel would save about 5 minutes per trip (or 2500 Calgarians' hours/day at a ridership of 30k).
     
     
  #9015  
Old Posted Oct 17, 2014, 11:08 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,633
Quote:
even the cheapest possible SE/NCLRT will take decades to fund at current funding levels.
The City of Calgary received $648 million in provincial Municipal Affairs and Transportation grants last year for those keeping score at home.
     
     
  #9016  
Old Posted Oct 18, 2014, 12:06 AM
RyLucky's Avatar
RyLucky RyLucky is offline
Registered User
 
Join Date: Feb 2012
Posts: 2,498
Quote:
Originally Posted by MalcolmTucker View Post
The City of Calgary received $648 million in provincial Municipal Affairs and Transportation grants last year for those keeping score at home.
Yes, but the full LRT is going to cost 3-5 Billion.

Are you implying that Calgary can expect this commitment annually?
     
     
  #9017  
Old Posted Oct 18, 2014, 12:59 AM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,633
Quote:
Originally Posted by RyLucky View Post
Yes, but the full LRT is going to cost 3-5 Billion.

Are you implying that Calgary can expect this commitment annually?
Pretty close. If the MSI had reached the originally intended level of funding on time, funding between it and gas tax transfer would be $600 million a year (what used to be the gas tax is now a $120-125 or so million a year transfer as part of an expanded MSI). The following on to the current funding envelope for fiscal 2017 (might be 18), should be higher than that.

I fully expect the province to transfer enough money to meet the original end date for the MSI envelope (basically transfering the debt obligations Calgary has taken on in lieu of funding), and commit to continueing the planned transfer level (or figure out a way for the city to raise the same money) plus some before the next provincial election.
     
     
  #9018  
Old Posted Oct 18, 2014, 1:11 AM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by RyLucky View Post
Yes, but the full LRT is going to cost 3-5 Billion.

Are you implying that Calgary can expect this commitment annually?
He's implying that we likely get that every year and could dedicate 10 years and fund it out right.
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
     
     
  #9019  
Old Posted Oct 18, 2014, 1:22 AM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,633
I would still finance it so spread out the cost, especially at today's interest rates, so the city can do other things too. I would prefer the city also try for an additional tax of some sort so it could invest even more. But the situation isn't likely to be dire unless the bottom falls out of the economy in a way that stops growth pressures.
     
     
  #9020  
Old Posted Oct 18, 2014, 1:31 AM
Full Mountain's Avatar
Full Mountain Full Mountain is offline
YIMBY
 
Join Date: Aug 2008
Posts: 2,938
Quote:
Originally Posted by speedog View Post
Transit buses use fuel as well - seems equitable as transit users would contributing less to the system as compared to someone using their private vehicle. Everyone pretty much utilizes a motorized form of transportation in Calgary and would be contributing fairly - those driving more fuel efficient vehicles would contribute less, those driving lifted gas guzzling 4x4's or powerful sports cars would pay more in fuel taxes, seems fair, no?
What about the person who works in an area that's served by transit, is under served altogether, or doesn't have service when the person starts or finishes work? Are they to be charged because they don't work in an area where there is good transit? Also remember that the majority of the top paying jobs are downtown where the best transit is, so that person may be making less than $20/hour.

A sales tax, taxes disposable income. Gas tax taxes a necessity for many due to decades of planning around the car. Can you live without a car sure, but probably isn't going to be nice to get to the foothills industrial area at 1am to start your grave yard shift after all the buses to the area have stopped running.
__________________
Incremental Photo - @PhotogX_1

Disclaimer: All opinions expressed are my own not those of any affiliated organizations.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:50 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.