  #1581  
Old Posted Sep 12, 2014, 9:43 PM
shakman's Avatar
shakman shakman is offline
Chairman
 
Join Date: Jun 2002
Location: PRMD - People's Republic of Maryland
Posts: 2,688
Quote:
Originally Posted by TallCoolOne View Post
According to Joe DiStefano - the Philly.com/Phila Inquirer Business reporter etc, no change in design of the building, per CEO of FMC. I wrote him earlier in the week - I'm really becoming a skyscraperpage.com nerd!
It just gets better and better. Wait until you start to see skyscrapers that do not exist. Then you have truly joined amongst the nerds of skyscrapers.
__________________
"I measure the value of life not by how much I have, instead by what I have done.

-sb
     
     
  #1582  
Old Posted Sep 12, 2014, 9:51 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
^ what are you talking about ghost skyscrapers? Ghosts of proposals past?
     
     
  #1583  
Old Posted Sep 15, 2014, 7:29 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,469
Construction fencing up



You can still see down into the site from 30th street however through a little break between the fencing and the parking garage.

     
     
  #1584  
Old Posted Sep 16, 2014, 4:07 PM
Lincolndrive's Avatar
Lincolndrive Lincolndrive is offline
Realtor
 
Join Date: Mar 2006
Location: Philadelphia
Posts: 619
Quote:
Originally Posted by summersm343 View Post
Construction fencing up



You can still see down into the site from 30th street however through a little break between the fencing and the parking garage.

Thank goodness! I would be bitter if I couldn't watch this guy going up from the start.
     
     
  #1585  
Old Posted Sep 16, 2014, 10:58 PM
shadowbat2 shadowbat2 is offline
Registered User
 
Join Date: Sep 2013
Posts: 901
Taken today....

Another cage going in:
142 by tehshadowbat, on Flickr
     
     
  #1586  
Old Posted Sep 25, 2014, 8:38 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,469
A ton of caissons

     
     
  #1587  
Old Posted Sep 27, 2014, 4:32 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,469
Shot from Lincolndrive



More photos here:
https://www.facebook.com/BuildingPhilly?hc_location=timeline
     
     
  #1588  
Old Posted Sep 28, 2014, 9:37 PM
GarCastle GarCastle is offline
Registered User
 
Join Date: Feb 2006
Posts: 469
Looks like Madison is doing at least the top floors of concrete.

Cheers,
G.

Madison Awarded Contract to Work on New FMC Tower

Madison was recently awarded a contract for the FMC Tower located at Cira Centre South in Philadelphia. The 861,000-square-foot building is expected to be completed by mid-2016. Features include 622,000 square feet of office space, 229,000 square feet dedicated to 268 apartments and executive suites, and 10,000 square feet of retail space. Madison’s contract includes the foundations, concrete elevator core and slabs for the office tower portion of the project. At the top of the office tower, Madison will construct a 22-story cast-in-place concrete apartment building.
__________________
"I don't need the city, it never cared for me." - Neuroticfish.
     
     
  #1589  
Old Posted Sep 30, 2014, 12:24 PM
1487 1487 is offline
BANNED
 
Join Date: Jun 2014
Posts: 3,401
Quote:
Originally Posted by GarCastle View Post
Looks like Madison is doing at least the top floors of concrete.

Cheers,
G.

Madison Awarded Contract to Work on New FMC Tower

Madison was recently awarded a contract for the FMC Tower located at Cira Centre South in Philadelphia. The 861,000-square-foot building is expected to be completed by mid-2016. Features include 622,000 square feet of office space, 229,000 square feet dedicated to 268 apartments and executive suites, and 10,000 square feet of retail space. Madison’s contract includes the foundations, concrete elevator core and slabs for the office tower portion of the project. At the top of the office tower, Madison will construct a 22-story cast-in-place concrete apartment building.
This is very interesting. Not many office/residential buildings exist in Philly so the way this will be built is going to be unique since its almost like two separate buildings stacked vertically. What are the exact reasons for using steel for office but concrete for residential towers?
     
     
  #1590  
Old Posted Sep 30, 2014, 1:12 PM
skyscraper skyscraper is offline
BANNED
 
Join Date: Feb 2006
Posts: 1,374
Quote:
Originally Posted by 1487 View Post
This is very interesting. Not many office/residential buildings exist in Philly so the way this will be built is going to be unique since its almost like two separate buildings stacked vertically. What are the exact reasons for using steel for office but concrete for residential towers?
with concrete flat plate construction, it is economical to build with low floor to floor heights, as in residential construction (aound 11-12 feet fl-fl.). steel is better for higher floor to floor heights, which you would have in office buildings (14-16 feet or more.) flat plate allows you to build with lower floor to floor heights because the structural members can be shallower, so less room is needed between floors. Since steel requires deeper beams, more room is needed for them between floors. You might as well use them where you need higher floor heights, and since steel frames are constructed pretty quickly, it is economical for that purpose.
     
     
  #1591  
Old Posted Oct 1, 2014, 12:48 AM
Surrealplaces's Avatar
Surrealplaces Surrealplaces is offline
Editor
 
Join Date: Feb 2006
Location: Cowtropolis
Posts: 20,264
I'm looking forward to watching this one go up.
     
     
  #1592  
Old Posted Oct 7, 2014, 3:44 AM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,469
Update from Lincolndrive

Stiiiilllllll installing caissons



More photos here:
https://www.facebook.com/BuildingPhilly
     
     
  #1593  
Old Posted Oct 7, 2014, 12:30 PM
japmes japmes is offline
Registered User
 
Join Date: Jul 2006
Posts: 227
Quote:
Originally Posted by summersm343 View Post
Update from Lincolndrive

Stiiiilllllll installing caissons



More photos here:
https://www.facebook.com/BuildingPhilly

Does it normally take so long to install caissons? It seems like they could have drilled the entire site by now.
     
     
  #1594  
Old Posted Oct 7, 2014, 6:17 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
^ I was thinking the same thing a month ago it seemed like they had the same amount of caissons installed. Maybe it really does take this long, or maybe they are waiting for big brother to rise in center city.
     
     
  #1595  
Old Posted Oct 7, 2014, 6:20 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,469
They now have renderings up along the fencing and the "Work in Progress" L&I sign.

Another shot from today

     
     
  #1596  
Old Posted Oct 8, 2014, 6:42 PM
hammersklavier's Avatar
hammersklavier hammersklavier is offline
Philly -> Osaka -> Tokyo
 
Join Date: Apr 2008
Location: The biggest city on earth. Literally
Posts: 5,630
Quote:
Originally Posted by japmes View Post
Does it normally take so long to install caissons? It seems like they could have drilled the entire site by now.
Caisson installation is governed by how far down you have to go till you hit bedrock (among other things). Since this building is a full-size skyscraper being built on the floodplain (i.e. bedrock is a loooong way down) you're looking at quite a while to drill the caissons.

It took about half a year IIRC to drill all of Evo's caissons and that building rests on a far smaller site. Expect them to be at it for quite a while.
__________________
Urban Rambles | Hidden City

Who knows but that, on the lower levels, I speak for you?’ (Ralph Ellison, Invisible Man)
     
     
  #1597  
Old Posted Oct 9, 2014, 5:37 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,469
Updated the first post in the thread with the new renderings, info and links
     
     
  #1598  
Old Posted Oct 9, 2014, 5:38 PM
Boku Boku is offline
Registered User
 
Join Date: Jul 2014
Posts: 770
Quote:
Originally Posted by summersm343 View Post
Updated the first post in the thread with the new renderings, info and links
You're on a mission today.
     
     
  #1599  
Old Posted Oct 9, 2014, 5:52 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,469
Quote:
Originally Posted by Boku View Post
You're on a mission today.
It's my day off. I'm bored
     
     
  #1600  
Old Posted Oct 9, 2014, 5:55 PM
Philly Fan Philly Fan is online now
Registered User
 
Join Date: Feb 2013
Posts: 2,524
Quote:
Originally Posted by summersm343 View Post
It's my day off. I'm bored
Didn't they tell you? Moderators NEVER get a day off.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 11:19 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.