Quote:
Originally Posted by Metro-One
So it sounds like that the #1 and McKenzie intersection has been identified as the largest traffic problem on Vancouver Island and that there are interchange plans in the works.
Estimates for the interchange are 80 to 100 million.
Apparently all the details will be revealed early next year with the provinces 3 billion dollar transportation plan.
Will be great to see this intersection become an interchange.
Would be great to have the #17 a full freeway someday relatively soon.
|
Oh where to begin....LOL.
The #1 TCH @ McKenzie Ave (Saanich) was considered worthy of an interchange back in the early '90s when the Island Highway project was being designed. In fact it was included in the original plans for the Victoria Approaches project ... but due to political interference and cost overruns on the Parksville to Campbell River freeway it was deleted along with the Spencer Road flyover.
Back then the interchange was pegged at 45-60 million. It will be large. The elevations at the site will make it challenging. But it is 15 years overdue!
Also, the TCH at the Westshore Parkway needs to be done as well, that will probably be identified as the #2 concern for the region.... the delays in the afternoon commute north over the Malahat are unacceptable. They need to widen the TCH stretch through Goldstream park to 4 lanes in conjunction with that. Looking at about another 100 million there.
The last study I saw to create a freeway/expressway for the Pat Bay (BC 17) from Beacon thru Sayward Rd. was in the 350 million range back in the late 90s. It included interchanges at Sayward, Keating X-road, Mt. Newton X-road, McTavish/Airport (which has been done) and Beacon Rd. (major interchange ). It left Island View as a signalized inetrsection (land access perhaps??).
We can dream that they will spring 600-800 million for Victoria region highway improvements...and another 1 billion for LRT