I doubt the looking down thing is an issue. If they added floors, the execs could always insist on those additional floors being on top of the hotel - an isolated section of the buildings just for the Execs. They are leasing like 80% of the building and LPT already has a significant relationship with Comcast. I would think the Comcast Execs can do absolutely whatever they want with the project and they apparently already have options built in to take more space as is evidenced by that slight expansion so there may be other options built in as well. /shrug
It could also be that the hotel is down-sizing and LPT gave Comcast a good deal on those extra square feet.
Cheers,
G.
__________________
"I don't need the city, it never cared for me." - Neuroticfish.
|